| NU. | ID PROJECT | PROJECT NAME | PERCENT |
|---|---|---|---|
| 1 | P5444 | New Installation of Fence Baucau Municipality | 0.00 % |
| 2 | P5399 | Road Rehabilitation Of Batugade Roads Package II Sta. 8+000 - 12+980 (4.98 km) | 37.00 % |
| 3 | P5398 | Construction of Daudere River, Municipality of Lautem | 70.00 % |
| 4 | P5323 | Rehabilitasaun Estradas Rural, Liurai - Hatobuilico Pakote 2 Sta. 0+000 - 3+100=6+100, Suco Liurai, Adm. Maubisse, Municipio Ainaro | 23.88 % |
| 5 | P5302 | Renovation of Igreja da Paroquia Imaculada Conceicao Viqueque | 38.00 % |
| 6 | P5295 | Rehabilitation of Authority Residence Building Baucau Municipality | 44.23 % |
| 7 | P5276 | Konstrusaun Foun Kazerna PNTL Eskuadra Passabe, Suco Abani | 70.11 % |
| 8 | P5099 | Rehabilitation of Salao Paroquia de Santa Teresinha do Meninio Jesus Ossu | 0.00 % |
| 9 | P5043 | New Construction Works of Wall at DNTT Posto Fronteira Batugede, Municipio Bobonaro | 32.51 % |
| 10 | P5032 | Konstrusaun Foun Garajen no Ofisina Militar ba F-FDTL iha Tibar. Bazartete, Munisipiu Liquisa. Timor-Leste | 16.50 % |
| 11 | P4969 | New Construction for Fence and Security Post at Ainaro Municipality | 78.50 % |
| 12 | P4966 | Obra Konstrusaun Moru Protesaun (Cyclope Left Side & Right Side, Box Culvert), Pakote I iha Mota Beduku (Turleu), Cyclope L/S Sta. 0+100 - 0+280, Cyclope R/S Sta. 0+100 - 0+280, Aldeia Turleu, Suco Tibar, Postu Adm. Bazartete, Municipio Liquica | 98.00 % |
| 13 | P4923 | Lot 3 - Konstrusaun Uma Foun ho Tipu C 21 Unidade Iha Tulaika, Lifau, Posto Pante Makassar, RAEOA-ZEESM TL Tinan 2023 | 100.00 % |
| 14 | P4910 | Construcao de Capela Santa Reliquia, Citrana | 100.00 % |
| 15 | P4864 | New Construction of Office Building CNE at Manufahi District | 27.32 % |
| 16 | P4853 | Akizisaun Servisu Konstrusaun Muro, Portaun no Uma ba Guarda iha Sentru Viveirus Permanente iha Maubara husi Ministeriu Agrikultura, Pekuaria, peska no Florestas | 94.45 % |
| 17 | P4840 | New Construction of Fance & Gabion Works at Garden Of Herois Uatulari, Lugasa-Uatulari Viqueque | 25.00 % |
| 18 | P4831 | Konstrusaun Foun Edifisiu Prototipo Pre-Eskolar (EPE) Builico-Ainaro | 92.84 % |
| 19 | P4830 | Naeboruk River Protection JCT. Viqueque to Beaco Road Sta 0+375-0+830 (Package II) Municipality Viqueque | 100.00 % |
| 20 | P4829 | Naeboruk River Protection JCT Viqueque to Beaco Road Sta 0+000-0+250 & 0+000-0+125 (Package I) Municipality Viqueque | 100.00 % |
| 21 | P4819 | New Construction Of Gabion Wall Protection in Laclo River, Suco Berloik, Alas Manufahi Municipality | 100.00 % |
| 22 | P4813 | Rehabilitation and Maintenance Regional Road in RAEOA, Oetaco to Huakolen / Post Admint. Nitibe/Pante Makassar (14,221 Km) | 33.66 % |
| 23 | P4704 | Rahabiliasaun Edifisiu Dormitorio ESTV Dotic, Alas Manufahi | 100.00 % |
| 24 | P4670 | Konstrusaun Foun uma pesoal Saude iha Nitibe, Sub-Rejiaun Nitibe | 95.00 % |
| 25 | P4668 | Konstrusaun Foun Posto Integrado Oesilo no Kompleksu Rezidensial ba Pessoal Alfandega iha Oe-Silo RAEOA-ZEESMTL | 100.00 % |
| 26 | P4640 | LOT 9 Kontinuasaun Uma Foun ho Tipu C6 Unidade iha Oenuno - Cabana, Suni-Ufe, Posto Nitibe RAEOA-ZEESM TL TINAN 2023 | 100.00 % |
| 27 | P4638 | Programa de Habitação Social Para (Bairos Comunitarios) Konstrusaun Uma Foun ho Tipu B no C Faze Segundo Iha RAEOA-ZEESM TL Tinan 2023; Lote 4. Re-Konstrusaun Uma Foun ho Tipu C “04 B” 5 Unidades Iha Maquelab, Taiboco, Posto Pante Macassar, RAEOA- ZEESM TL. | 100.00 % |
| 28 | P4634 | Construção Sistema Rede Distribuição da Água e Saneamentu (SAS) na RAEOA-ZEESM TL Tinan 2023 Lote: 1. Kontinuasaun no Instalasaun Be’e Moos Sistema Perfurasaun Noelekat, Bobometo, Posto Oesilo RAEOA-ZEESM TL. | 90.00 % |
| 29 | P4633 | Konstrusaun Uma Digno Iha Muapitine Lospalos, Municipio Lautem | 43.52 % |
| 30 | P4623 | Construcao, Rehabilitacao de Infraestruturas de Agua e Saneamento na RAEOA ZEESM TL. Lot 5. Konstrusaun no Instalasaun Kanalizasaun Sistema Be'e Moos Oehonis, Malelat Utiliza Bomba | 80.00 % |
| 31 | P4622 | Construcao de Infraestruturas do setor Saude, RAEOA ZEESM TL ; Lot. 6. Construcao Edificio Laboratorio no Banco de sange iha HROA. | 100.00 % |
| 32 | P4601 | Konstrusaun foun ba Area Turizmu Kultura iha Nunuheno | 40.00 % |
| 33 | P4532 | Road Rehabilitation of Batugade Roads Package I (Sta. 0+000 - 8+000 8 Km) Municipio Bobonaro | 45.00 % |
| 34 | P4436 | Konstrusaun foun Tengki Oleo Foer iha Suku Mahakidan - Alas manufahi | 0.00 % |
| 35 | P4392 | Rehabilitação Estrada Rural Beco-Tobur 2, STA 3.000-6.000 (3km) Suco Beco, Posto Adm. Suai, Municipio Covalima. | 76.63 % |
| 36 | P4382 | Moru Externo ba Prizaun Gleno | 91.80 % |
| 37 | P4353 | Konstrusaun moru haleu sentru formasaun Beaco Parte Oeste | 100.00 % |
| 38 | P4352 | Konstrusaun moru haleu sentru formasaun Beaco Parte Leste | 100.00 % |
| 39 | P4338 | New Construction of STAE Office and Fence,Oecussi | 100.00 % |
| 40 | P4328 | Obra Konstrusaun Edificio Clinica, Aldeia Beremanek, Suco Mahaquidan, Municipio Manufahi | 27.83 % |
| 41 | P4310 | Projeto Rehabilitação Estrada Rural Beco - Halik STA 3+000-6+000 (3Km) Suco Beco, Posto Adm. Suai, Municipio Covalima | 66.29 % |
| 42 | P4309 | Projeto Rehabilitação Estrada Rural Beco - Aldeia Halik STA 0+000-3+000 (3km) Suco Beco, Posto Adm. Suai, Municipio Covalima | 45.34 % |
| 43 | P4306 | Rehabilitasaun Estrada Rural Aldeia Raeluli - Postu UPF Has Naruk, Chainage 0+000 - 4+000, Suco Cowa, Posto Adm. Balibo, Municipio Bobonaro | 60.00 % |
| 44 | P4280 | Rehabilitasaun Estrada Jct A01 Triloca - Jct A06 Fatumaca- Loilubu Jct A06 Venilale Road, Municipio Baucau, Sta. 24+150 - 30+190 (6.040 Km) Package V | 14.65 % |
| 45 | P4279 | Rehabilitasaun Estrada Jct A01 Triloca - Jct A06 Fatumaca- Loilubu Jct A06 Venilale Road, Municipio Baucau, Sta. 18+125 - 24+15 (6.025 Km) Package IV | 20.19 % |
| 46 | P4278 | Rehabilitasaun Estrada Jct A01 Triloca - Jct A06 Fatumaca- Loilubu Jct A06 Venilale Road, Municipio Baucau, Sta. 12+075 - 18+100 (6.00 Km) Package III | 28.12 % |
| 47 | P4275 | Emergency Proposed for the New Construction of Bridge with Retaining Wall in Area Wee Kakau Oan 1 Manufahi Municipality | 100.00 % |
| 48 | P4256 | New Construction of Vemasse Irrigation Fatuk Metan, Municipality Baucau | 0.00 % |
| 49 | P4230 | Construction of judicial courts of first instance and of the judges's residence (proto type) for Maliana Municipality | 0.00 % |
| 50 | P4184 | New Lebudoe Bridge Construction, 40 Meter Length, Single Span, Steel Trusses Type B. | 28.90 % |
| 51 | P4178 | Obra Konstrusaun Moru Protesaun Cyclope & Groyness Mota Obrato, Munisípiu Manatuto Package III, 0+458 – 0+687, Suco Obrato, Postu Administrativo Manatuto, Munisípiu Manatuto. | 91.86 % |
| 52 | P4177 | Obra Konstrusaun Moru Protesaun Cyclope & Groyness Mota Obrato, Munisípiu Manatuto Package II, 0+229 – 0+458, Suco Obrato, Postu Administrativo Manatuto, Munisípiu Manatuto. | 100.00 % |
| 53 | P4176 | Obra Konstrusaun Moru Protesaun Cyclope & Groyness Mota Obrato, Munisípiu Manatuto Package I, Sta. 0+000 – 0+229, Suco Obrato, Postu Administrativo Manatuto, Munisípiu Manatuto. | 99.66 % |
| 54 | P4163 | Moru Protesaun Gabion Mota Paulua, (Right Side Sta. 0+000 - 0+700) (Left Side Sta. 0+000 - 0+700), Package I, Raime Vatubou, Maubara | 32.50 % |
| 55 | P4158 | Servisus Rehabilitasaun e Manutensaun Edifisiu Batugade ba DGSM-MI | 83.12 % |
| 56 | P4154 | Konstrusaun Foun Edifisiu Eskola Secundaria Geral Lele-Ufe, Posto Nitibe, Raeoa Zeesm TL | 100.00 % |
| 57 | P4153 | Konstrusaun Foun ba Edifisiu Eskola Tecniku Agrikola/Etaro, Lifau, Postu Pante Makasar Raeoa-Zeesm TL Tinan 2023 | 100.00 % |
| 58 | P4152 | Rehabilitation Estrada Rural (Vaviquina - Manulete) Road Package I. Sta.0+000 - 4+000, Suco Vaviquina - Maubaralisa, Postu Maubara, Municipio Liquica | 35.75 % |
| 59 | P4149 | R4D Rural Road Rehabilitation Of Atabae-Rairobo Road Package 6 Chainage 12+000 - 14+000 (2,0 km) | 100.00 % |
| 60 | P4148 | Konstrusaun Foun Edifisiu Eskola Bazika Filial Bilele - Maunaben, Suco Cunha, Posto Pante Makassar, RAEOA ZEESM TL | 100.00 % |
| 61 | P4142 | Rehabilitation and Mantinance Regional Road in RAEOA, fatin Projeito Fatukenfun, Suco Usi-Taco to Lamasi, Suco Bene-Ufe, Postu Administrativu Nitibe ho Distancia Sta 0+000 - 6+700 ( 6.7,KM ), RAEOA-TL | 90.29 % |
| 62 | P4137 | Konstrusaun Foun Edifisiu Eskola Bazika Central Sumlili, Costa, Pantemakasar Raeoa-Zeesm TL, Tinan 2023 | 100.00 % |
| 63 | P4128 | Lot 1- Konstrusaun Uma Foun no Tipu A Iha Maquelab-Taiboco, Posto Pante Macassar Raeoa-Zeesm TL | 100.00 % |
| 64 | P4125 | New Construction Building Saint Joao Paulo II Training Center Diocese of Baucau iha Kota Lama Baucau, Timor-Leste | 9.04 % |
| 65 | P4124 | Konstrusaun Foun Edifisiu Centru Resepsaun Trabalho, Costa, Postu Pante Makasar Raeoa-Zeesm TL, Tinan 2023 | 100.00 % |
| 66 | P4123 | Lot 5 : Konstrusaun Sala Unidade Kuidade Kuidadu Intensivu (ICU) Iha HROA | 100.00 % |
| 67 | P4120 | Konstrusaun Foun Posto Intregado Oesilo no Kompleksu Residensial ba Pesoal Alfandiga iha Oesilo, Raeoa-Zeesm TL, Tinan 2023 | 100.00 % |
| 68 | P4118 | Kontinuasaun No Instalasaun Be'e Moos Sistema Perfurasaun Aenmat, Lalisuk, Posto Pante Macassar, Raeoa-Zeesm TL, Tinan 2023 | 100.00 % |
| 69 | P4116 | R4D Rural Road Rehabilitation Of Atabae - Rairobo Road Package 4 Chainage 8+000 - 10+000 (2.0 km), Bobonaro Municipality | 100.00 % |
| 70 | P4115 | Konstrusaun Foun Edificio Prototipo Pre-Eskolar (EPE) Aidelun - Hularema, Seloi Malere, Aileu | 100.00 % |
| 71 | P4102 | Canalization of Clean Water Pump for Community, Location Poetete-Ermera, Municipio Ermera | 17.80 % |
| 72 | P4094 | R4D Rural Roads Atabae Rairobo Road Package 8 Chainage 18+000 - 20+000 Bobonaro Municipality | 100.00 % |
| 73 | P4092 | R4D Rural Road Atabae - Rairobu Package 7 Chainage 16+000 - 18+000 Bobonaro Municipality | 100.00 % |
| 74 | P4090 | Konstrusaun Moru Protesaun Mota Samalari, Suco Samalari, Municipio Baucau | 73.26 % |
| 75 | P4089 | Obra Konstrusaun Estrada no Moru Protesaun ba Residensia Madre iha Memo Sta. 0+000 - 0+900 - Maliana | 45.00 % |
| 76 | P4063 | Construcao Missionario Residencial da Imaculado Coracao de Maria, Nahareka. Municipio Viqueque | 72.00 % |
| 77 | P4061 | Rehabilitation of A01 JCT Cairavela - Caicido - Baucau Airport Roads, Sta. 10+500 to 15+500 (5,000.00 M), Baucau Municipality | 97.42 % |
| 78 | P4060 | Road Rehabilitation of A01 JCT Cairavela - Caicido - Baucau Airport Roads, Sta. 15+500 to 18+740 ( 3,240.00 M ), Baucau Municipality | 96.86 % |
| 79 | P4056 | Rehabilitação do Moru Edifiçio Autoridade Aduaneira em Campound Batugade, Municipio de Bobonaro. | 100.00 % |
| 80 | P4054 | Construction of Permanent Road Acces Dilor Bridge Approach (STA 0+000 to 0+100) Suco Uma Tolu Postu Administrativo Lacluta, Municipio Viqueque. | 58.75 % |
| 81 | P4042 | Obra Konstrusaun Manutensaun Estrada Tibar-Gleno Moru Protesaun Gabions & Teramesha ba Estrada ( Location 1,2,3,4,5,6. Gabions Teramesh Tibar-Ermera Road) (Sta.0+000 - 0+140) Municipio Liquica - Municipio Ermera. | 13.79 % |
| 82 | P4021 | Rehabilitasaun Igreja Paroquia Nossa Senhora da Graca Laclubar | 65.07 % |
| 83 | P4019 | Moru Protesaun Mota Venilale-bahamori Sta. 0+300 (Des.Nu.002/PM.VII/2023. Dezenho 01), Package II, Suco Bahamori, Postu Administrativu Venilale, Munisípiu Baucau. | 100.00 % |
| 84 | P4015 | Konstrusaun Sistema Gravitasaun Be'e Mos, Suco Lacao, Posto Administrativo Atsabe, Municipipality Ermera | 76.52 % |
| 85 | P4004 | Kontinuasaun Instalasaun Be’e Mos Sistema Perfurasaun Noa-Ana ba Mahata no Noelbesi, Suku Lela Ufe, Postu Administrativu Nitibe, RAEOA ZEEMS TL. | 100.00 % |
| 86 | P3997 | New Construction Office, Warehouse and Landscape Centro Solidaridade Social e Inclusão Municipio Bobonaro. | 37.44 % |
| 87 | P3965 | Obra Konstrusaun Moru Protesaun Gabions iha Mota Nu’u Badak, Suku Batugade, Postu Administrativu Balibo, Munisípiu Bobonaro, (Sta. 0+000 – Sta. 0+293.78) & (Sta. 0+000 – 0+35.61). | 72.00 % |
| 88 | P3964 | Construction Building Biara St. Henrique CIJ & New Construction Surrounding Wall St. Henrique CIJ, Suku Letefoho, Postu Administrativu Same Villa, Minisípiu Manufahi. | 7.41 % |
| 89 | P3963 | Rehabilitation Of Line Drain At Line Drain At Same Vila, Sta 0+000-1+048, Suco Letefoho, Posto Adm Same, Municipality Manufahi | 14.62 % |
| 90 | P3952 | Rehabilitation of Road and Drainagem in Leber Sta. 0+000-4+000. | 55.00 % |
| 91 | P3949 | New Construction of Cylope Retaining Wall in Tibar River. | 32.00 % |
| 92 | P3948 | Obra Konstrusaun ba Estrada Urbana Lugatoi Beloi Viqueque (Des.Nu. 002/PM/VII/2023. Dezenho Nu. 18). | 85.00 % |
| 93 | P3945 | NEW CONSTRUCTION OF GABION WALL PROTECTION IN MAUBARA RIVER, SUCO VAVIQUINIA, POSTU ADMINISTRATIVO MAUBARA, MUNICIPIO LIQUICA | 55.00 % |
| 94 | P3944 | Rehabilitasaun Obra Konstrusaun Cyclope & Gabion Eraulo/Daduro Bareira Gabions Sta 0+000- 2+073 m Cyclope Left/Right Sta 0+000-0+058 M Cyclope Left Sta 0+000-0+018 m Suco Eraulo, Municipio Ermera | 98.65 % |
| 95 | P3943 | Obra Konstrusaun ba Moru Protesaun Cyclope Mota Talimoro, Downstream Right Side Type A & Type B, Municipio Ermera. Sta.0+000 - Sta.1+388 (Type A), Sta.0+000 - Sta. 0+601 (Type B), Package I, Suco Talimoro, Posto Administrativo Ermera, Municipio Ermera)) | 100.00 % |
| 96 | P3916 | OBRA KONSTRUSAUN MORU PROTESAUN CYCLOPS MOTA ERMETA , ALDEIA ERMETA, SUCO ULMERA, POSTO ADM. BAZARTETE, MUNICIPIO LIQUICA | 57.80 % |
| 97 | P3910 | New Construction of Igreja da Nossa Senhora de Fátima, Mehara, Lospalos, Lautem | 29.90 % |
| 98 | P3904 | New Construction of the Judicial Courts of First Instance Building and Judges' Residence Prototype in Baucau Municipality | 0.00 % |
| 99 | P3883 | New Construction Gabion Wall Protection in Bulobu River, Cailaco, Bobonaro, Timor-Leste. | 35.00 % |
| 100 | P3880 | Obra Konstrusaun Moru Protesaun Gabions ba Mota Bazartete Liquiça, Right Side (Sta.0+000 to 0+968) Package II, Aldeia Mota Ulun, Suku Bogoro, Postu Administrativu Bazartete, Munisípiu Liquiça. | 24.00 % |
| 101 | P3876 | Construction of Concrete Fence of F-FDTL Tibar Logistics Base Center at Fatunea, Tibar, Bazartete, Liquiça Municipality | 29.43 % |
| 102 | P3867 | Construcao do Novo Posto de Saude e Residencia dos Medicos em Darulete, Municipio de Liquica | 19.82 % |
| 103 | P3861 | Re-Konstrusaun Uma Foun ho Tipo C04C 12 Unidades iha Makelab - Taiboco, Posto Pante Macasar, RAEOA-ZEESM TL | 100.00 % |
| 104 | P3858 | Rehabilitasaun Estrada Rural Liurai - Fatubossa, Chainage 0+000 - 3+100, Suco Liurai, Fatubossa, Posto Adm. Maubisse, Municipio Ainaro. | 32.21 % |
| 105 | P3832 | New Construction of Monument and Resting place (Phase II) - Cainliu, Iliomar | 45.00 % |
| 106 | P3822 | Obra Konstrusaun Moru Protesaun (Cyclope Left Side & Right Side, Box Culvert) Iha Mota Beduku (Turleu) package II Cyclope L/S(Sta.)+280 - Sta.0+546), Cyclope R/S (Sta.0+280 - Sta.0+546), Cyclope R/S | 86.00 % |
| 107 | P3784 | Konstrusaun Terminal de Transporte Publiku Tono iha RAEOA - ZEESM TL | 100.00 % |
| 108 | P3783 | Lot 6 Kontinuasaun Uma Foun Ho Tipu C 19 Unidade iha Kabuk Pele - Maquelab, Taibaco, Posto Pante Macassar RAEOA - ZEESM TL Tinan 2023 | 81.34 % |
| 109 | P3779 | New Construction Of Perimeter Fence, Backfill and Concrete Yard Area At PIF Salele | 16.38 % |
| 110 | P3778 | Konstrusaun Foun Edifisiu Ekola Bazika Central Boboloa, Bobokase, Postu Pante Makasar RAEOA-ZEESM TL Tinan 2023 | 100.00 % |
| 111 | P3777 | Konstrusaun Foun Mercado Pune Suco Usi Tasa'e Sub Região Oe-silo | 100.00 % |
| 112 | P3756 | Obra Konstrusaun Estrada Lokal Plum Concrete & Drainage (Sta. 0+000 - Sta. 3+660) | 24.50 % |
| 113 | P3754 | R4D Rural Road Rehabilitation Of Atabae-Rairobo Road Package 6 Chainage 14+000-16+000 (2.0 KM), Bobonaro Municipality | 100.00 % |
| 114 | P3751 | Routine Roads Maintenance Work Based on Actual Work (Bazeia ba Servisu Atual) Municipio Liquica | 100.00 % |
| 115 | P3748 | Rehabilitation of Road Fohorua - Leogore (Maucatar) STA. 0+000-7+000 | 4.91 % |
| 116 | P3747 | Rehabilitation of Road Fohorua - Leogore (Maucatar) STA. 7+000-10+000 | 4.49 % |
| 117 | P3746 | River Protection With Gabion in Sahen River (1+500 Km) | 100.00 % |
| 118 | P3720 | LOT 3 Kontinuasaun Uma Foun ho Tipu B 02D 3 Unidade iha Bocos - Hauboni, Taiboco, Posto Pante Macassar RAEOA-ZEESM TL Tinan 2023 | 100.00 % |
| 119 | P3719 | LOT 2 Kontinuasaun Uma Foun ho Tipu B 02C 3 Unidade iha Maquelab - Taiboco, Posto Pante Macassar RAEOA-ZEESM TL Tinan 2023 | 100.00 % |
| 120 | P3717 | LOT 7 - Kontinuasaun Uma Foun ho Tipu C 06A 13 Unidade iha Bocos - Hauboni, Taiboco, Posto Pante Macassar RAEOA - ZEEM TL Tinan 2023 | 100.00 % |
| 121 | P3715 | LOT 8 Kontinuasaun Uma Foun ho Tipu C 06B 14 Unidade iha Bocos - Hauboni, Taiboco, Posto Pante Macassar RAEOA-ZEESM TL Tinan 2023 | 82.32 % |
| 122 | P3703 | Obra Konstrusaun Moru Protesaun Gabion Mota Lotan, Right Side (sta. 0+000- sta.0+500), Suco Batugede, Municipio Bobonaro | 70.00 % |
| 123 | P3702 | Obra Konstrusaun Muru Protesaun Cyclope, Gabions & Carriage Way, Aldeia Salasa, Suco Lour, Posto Adm. Zumalai, Municipio Covalima | 100.00 % |
| 124 | P3693 | Obra Konstrusaun Muru Protesaun Gabions & Plum Concrete ba Estrada Tapo, Bobonaro (Sta. 0+030 - Sta. 0+080), Aldeia Tapo, Posto Adm. Bobonaro, Municipio Bobonaro | 50.00 % |
| 125 | P3686 | Obra Construsaun Muru Protesaun Stone Masonry ba Mota Lorigua Sta. 0+000 - Sta.0+388 (Right Side) & Sta. 0+000 - 0+394 Left Side | 47.43 % |
| 126 | P3679 | Obra Konstrusaun Moru Protesaun Gabion Mota Lotan, Left Side (Sta. 0+000-Sta.0+635), Suco Batugede, Posto Adm. Balibo, Municipio Bobonaro | 65.00 % |
| 127 | P3678 | Obra Moru Protesaun Cyclope, Ba Mota Same Ailok Laran, Aldeia Lapuru, Suco Babulu, Posto Adm. Same Vila, Municipio Manufahi | 24.80 % |
| 128 | P3675 | Obra Konstrusaun ba Muru Protesaun Cyclope, Pipe Culvert, Catch Basin & Plum Concrete ba Estrada Mau-Nuno, Ainaro (Sta. 0+000 - Sta. 0+225.61) | 67.00 % |
| 129 | P3670 | New Construction of Gabions (Gomai River Fatuquero) | 53.07 % |
| 130 | P3667 | Obra Konstrusaun Muru Protesaun ba Mota Bulobu Package I Gabion (Sta. 0+000- Sta.0+490) Gabions Groynes (Sta. 0+099-0+101) - (Sta. 0+199-0+201) - (Sta. 0+299-0+301) - (Sta.0+399-401) Aldeia Bereleu, Meligo, Posto Adm. Cailaco, Municipio Bobonaro | 100.00 % |
| 131 | P3665 | Konstrusaun Panel Bridge no Cyclopes Protesaun ba Mota Maulelo, Suku Maununo, Posto Adm. Ainaro, Municipio Ainaro | 10.59 % |
| 132 | P3664 | Obra Konstrusaun ba Muru Protesaun ba Mota Bulobu Package II Gabion (Sta. 0+000 - Sta. 0+260) Gabions (Sta. 0+000 - 0+427) Gabions Groynes - (Sta. 0+119-0+121) - (Sta. 0+099+101) - (Sta. 0+199-201) - (Sta.0+299-301) - (Sta.0+399-0+401), Aldeia Bereleu, Meligo, Posto Adm. Cailaco, Municipio Bobonaro | 60.00 % |
| 133 | P3657 | Rural Road Rehabilitation of Lore - Tchai, Lore 1 Chainage 2+300 - 5+500 (3.2 Km), Lautem Municipality | 69.20 % |
| 134 | P3656 | Emergency Project of Cyclope in Cairui River Sta. 1+300 - Sta. 2+413.73 (Package 2) Manatuto Municipality | 98.30 % |
| 135 | P3654 | Rehabilitation of Kapela Beluli | 60.78 % |
| 136 | P3653 | New Construction of Nosa Senhora Maria Auxiladora Church in Saboria | 92.19 % |
| 137 | P3651 | New Construction for Health Post and Doctor House Aicurus, Remexio, Aileu Municipality | 68.34 % |
| 138 | P3644 | Obra Konstrusaun Muru Protesaun Abutment Ponte Manuten (Sta. 0+000 - Sta.0+20) | 81.78 % |
| 139 | P3643 | Obra Konstrusaun Muru Protesaun Gabion ba Mota Nagidal Covalima Pakote II, (Sta. 0+500 - Sta. 0+888), Suco Luor, Posto Adm. Zumalai, Municipio Covalima | 100.00 % |
| 140 | P3638 | Rehabilitasaun Seksaun Estrada Local Maubisse - Rabilau (Sta. 00+000.00 - 06+230) | 71.79 % |
| 141 | P3637 | Konstrusaun Moru Protesaun Gabion & Cyclope ba Mota Leogol, A;deia Leogol, Suco Zulo, Posto Adm. Zumalai Municipio Covalima | 100.00 % |
| 142 | P3635 | Obra Konstrusaun ba Moru Protesaun Cyclope iha Mota Marak (Sta. 0+000 - 0+069.19) | 56.30 % |
| 143 | P3632 | Obra Konstrusaun ba Muru Protesaun Gabions iha Mota Sare Talimoro (sta. 0+000-0+580) Left Side | 100.00 % |
| 144 | P3631 | Obra Konstrusaun ba Muru Protesaun Gabions iha Mota Sare Talimoro (sta. 4+840-5+264.79) Right Side | 100.00 % |
| 145 | P3627 | Obra Konstrusaun ba Muru Protesaun Gabions iha Mota Sare Talimoro (sta. 2+680-3+220) Right Side | 100.00 % |
| 146 | P3626 | Obra Konstrusaun ba Muru Protesaun Gabions iha Mota Sare Talimoro, Sta. 2+140-2+680 (Right Side), Suco Asulau Sare Talimoro, Posto Adm. Hatulia B, Municipio Ermera | 57.34 % |
| 147 | P3624 | Obra Konstrusaun ba Muru Protesaun Gabions iha Mota Sare Talimoro (sta. 1+060-1+600) Right Side, Suco Asulau Sare Talimoro, Posto Adm. Hatulia B, Municipo Ermera | 100.00 % |
| 148 | P3623 | Obra Konstrusaun ba Muru Protesaun Gabions iha Mota Sare Talimoro (sta. 0+520 - 1+060) Right Side | 100.00 % |
| 149 | P3622 | Obra Konstrusaun ba Muru Protesaun Gabions iha Mota Sare Talimoro (sta. 0+000 - 0+520) Right Side | 100.00 % |
| 150 | P3618 | Konstrusaun Moru Protesaun Gabions & Groynes ba Mota Casa (Sta. 0+000 - Sta. 0+258 & Sta. 0+000 - Sta. 0+256) Suco Casa Aldeia Mausuca, Posto Adm. Ainaro | 100.00 % |
| 151 | P3616 | New Construction of Community Health Centre (CHC), Remixio – Aileu Municipality, Timor-Leste | 13.86 % |
| 152 | P3614 | Package 1 - Wall Protection Gabion & Groynes for the Weberek River, in Same, Manufahi (LS STA0+000-STA 1+060 Km) | 38.37 % |
| 153 | P3611 | Obra Konstrusaun ba Muru Protesaun Gabions & Regularizasaun ba Mota Vatunau Gabion Left Side (Sta. 0+000 - Sta. 0+531) Right Side Sta. 0+000 - Sta. 0+090) Regularizasaun (Sta. 0+000 - Sta. 0+751) | 100.00 % |
| 154 | P3609 | OBRA KONSTRUSAUN BA MORU PROTESAUN GABION IHA MOTA VEMASSE TASI (PACKAGE I, STA. 0+000 - STA. 0+600), Suco Vemasse Tasi, Posto Adm. Vemasse, Municipio Baucau | 71.77 % |
| 155 | P3601 | Konstrusaun Pasadeira no Muru Protesaun Mota Madebau (Loes), Suco Atabae, Posto Adm. Atabae, Municipio Bobonaro | 40.00 % |
| 156 | P3596 | Konstrusaun Rezidensia Madre Canossiana Uato Carbau | 85.00 % |
| 157 | P3579 | New Construction for Health Post and Doctor House Wacala - Baguia, Baucau Municipality | 26.23 % |
| 158 | P3577 | New Construction of Community Health Centre (CHC) Horai Kiik | 34.05 % |
| 159 | P3558 | Obra Konstrusaun Moru Protesaun Cyclope Left Side Profile Tipe I & Tipe III Mota Miguir, Municipio Bobonaro | 100.00 % |
| 160 | P3557 | Obra Konstrusaun Muru Protesayn Cyclope Right Side Profile Type II & Type IV Mota Miguir, Municipio Bobonaro Package II | 100.00 % |
| 161 | P3552 | Obra Konstrusaun Ba moru Protesaun Gabions Ho Groynes iha Mota Dotik Alas Manufahi ( Sta. 0+000 - 0+460) Dotik Postu Adm. Alas Municipio Manufahi | 100.00 % |
| 162 | P3541 | Nova Construcao de Muro Circundante do Hospital de Maulo-Builico, Municipio de Ainaro | 80.00 % |
| 163 | P3539 | New Construction for Health Post and Doctor House - Ariana, Venilale, Baucau Municipality | 27.17 % |
| 164 | P3531 | Emergency Project of Regularization Casa River in Ainaro-Casa, Ainaro Municipality, Start from Sta 1+325.00 - Sta 2+330.00) Package II | 100.00 % |
| 165 | P3530 | Obra Emergencia - River Training in Casa River STA 0+000 - STA 1+300 Package I, Casa, Municipality of Ainaro | 100.00 % |
| 166 | P3519 | Road Package A (Municipio Manufahi), National Road (Arterial A14) Same - Luak - Betano, L=9 KM (Part 2 - 4.05 Km) | 4.36 % |
| 167 | P3518 | Road Package A (Municipio Manufahi), National Road (Arterial A14) Same - Luak - Betano, L=9 KM (Part 1 - 5,1Km) | 2.60 % |
| 168 | P3516 | Emergency Stone Masonry Wall Cyclopean Concrete Works Phase 1, Section 1 L=1265 m, and Krib Cyclopean Concrete Works L = 80 m at Dilor River | 19.00 % |
| 169 | P3513 | Construction of New Retaining Wall for River Protection in Renbor River | 100.00 % |
| 170 | P3509 | Upgrading and Maintenance of Hatubuilico - Letefoho Road Section (Km 11+900 to Km 30+307.88) | 36.23 % |
| 171 | P3508 | New Construction Uma Dignu ba Povo (UDP) Bobonaro/Tunubibi | 32.31 % |
| 172 | P3507 | New Construction Uma Dignu ba Povo (UDP) Manufahi/SP1 | 89.70 % |
| 173 | P3506 | New Construction Uma Dignu ba Povo (UDP) Manatuto/Aubeon | 61.00 % |
| 174 | P3503 | Emergency Project of Cyclop in Cairui - Laleia Pagkage I Sta. 0+000 - 1+200 | 100.00 % |
| 175 | P3501 | ROUTINE MAINTENANCE WORKS Performance-Based Contract For Road Maintenance (Bazeia ba Servisu Atual) Bobonaro Municipality | 100.00 % |
| 176 | P3499 | Routine Maintemance Works Performace-Based Contract for Road Maintenance Manufahi Municipality (Baseia ba Servisu Actual) | 88.21 % |
| 177 | P3497 | ROUTINE MAINTENANCE WORKS Performance-Based Contract For Road Maintenance (Bazeia ba Servisu Atual) Lautem Municipality | 100.00 % |
| 178 | P3493 | Moru Protesaun Gabion, Pakote II, Mota Besiten Ulmera (L/S Sta 0+500-0+500), Aldeia Manemori, Suco Ulmera, Posto Adm. Bazartete, Municipio Liquica | 46.80 % |
| 179 | P3484 | New Construction of Cyclope Karau Ulun River Betano, Municipality Manufahi | 70.20 % |
| 180 | P3483 | New Construction of Emergency Gabion Protection Ulmera, Tibar | 30.90 % |
| 181 | P3479 | Muru Protesaun Gabion Mota Besiten Ulmera Package (I) (R/S - Sta 0+000 L/S - Sta 0+418 Km) (R/S - Sta 0+000 L/S - Sta 0+398 Km) (R/S - Sta 0+000 L/S - Sta 0+020 Km) | 87.00 % |
| 182 | P3478 | Emergencia - Obra Konstrusaun Muru Protesaun Gabions Mota Legulugor I (Gabions Left Side Sta. 0+000 - Sta. 0+460 & Groynes) (Groynes Right Side Sta. 0+000 - Sta. 0+450), (Regulation Sta. 0+000 - 0+450) Aldeia Legulugor, Suco Gugleur, Posto Adm. Maubara, Municipio Liquica | 92.00 % |
| 183 | P3475 | Obra Moru Protesaun Cyclope & Gabion ba Mota Same Merbuti (Package I,II,III) Suco Letefoho, Posto Adm. Same, Municipio Manufahi | 100.00 % |
| 184 | P3468 | Urgent Lo'omea River Protection Aligment II Left (sta. 0+600 - Sta. 1+200) | 54.04 % |
| 185 | P3467 | Urgent Lo'omea River Protection Aligment III Down Right Side (Sta. 1+200 - 1+950) | 85.13 % |
| 186 | P3466 | Urgent Lo'omea River Protection Alignment I Right (Sta. 0+000 - Sta. 1+176) | 73.48 % |
| 187 | P3463 | Urgent Lo'omea River Protection Aligment IV Down Left (sta. 1+250 - Sta. 1+850) | 42.70 % |
| 188 | P3461 | Nova Construção EPE - Hatmanter | 85.19 % |
| 189 | P3460 | Konstrusaun Foun Edificio Ensino Basico Filial, Watumaluli, Nahareka Ossu, Viqueque | 82.00 % |
| 190 | P3457 | Gabion Wall Protection For Asumetaloa River Faulara, Municipality Liquica | 29.38 % |
| 191 | P3454 | Nova Construção Edificio Pre-Escolar Halibur | 82.15 % |
| 192 | P3451 | Nova Construção Edificio Pre-Escolar 7 de Desembro 99 Laclo | 54.44 % |
| 193 | P3450 | Nova Construção Edificio Pre-Escolar Darulete | 71.89 % |
| 194 | P3449 | Nova Construção Edificio Escola Basica Filial Wairoque | 90.45 % |
| 195 | P3448 | Nova Construção Edificio Pre-Escolar Wairoque | 94.15 % |
| 196 | P3445 | Konstrusaun Moru ESTV Yamato Malibaca, Maliana | 75.08 % |
| 197 | P3443 | New Construction of Classroom Building Escola Basica Filial Holsa Taz | 63.23 % |
| 198 | P3442 | New Construction of Classroom Building Pre-Escolar Purugua | 100.00 % |
| 199 | P3438 | New Construction of Classroom Building Pre-Escolar Aidelun | 100.00 % |
| 200 | P3437 | New Construction Slidge Recycle Tank for Fuel Waste Mahaquidan - Alas, Municipality Manufahi | 100.00 % |
| 201 | P3428 | Obra Konstrusaun Moru Protesaun Gabion Mota Afabubo ( Sta. 0+000 - 0+125.75 ) Suco Afabubo, Posto Lautem, Municipio Lautem | 100.00 % |
| 202 | P3427 | Obra Konstrusaun ba Muru Protesaun Gabions, Cyclope & Regularizasaun Mota Tibar Sta.0+000-Sta.533.64 | 100.00 % |
| 203 | P3425 | Obra Konstrusaun Moru Protesaun Gabion (Sta. 0+000 - Sta. 0+350) & Regularizasaun Mota Gugleur II (Sta. 0+000 - Sta. 0+675) | 100.00 % |
| 204 | P3422 | Emergency New Construction of Gabion Protection in Seisal River | 100.00 % |
| 205 | P3421 | New Construction Fence Ensino Secundaria Tecnico Vocasional (ESTV) Halibur Betano | 100.00 % |
| 206 | P3414 | Emergency Works for the Construction of Cyclope in Tibar River - Retaining Wall Tibar Sta. 0+000 -0+655 | 100.00 % |
| 207 | P3412 | Obra Konstrusaun Moru Protesaun, Gabions, Loke Mota Dalan & Regularizasaun, Suco Purugua, Posto Adm. Cailaco, Municipio Bobonaro | 100.00 % |
| 208 | P3410 | Konstrusaun ka Rehabilitasaun ba Escola Pre-Eskolar Tali Oan | 100.00 % |
| 209 | P3409 | R4D Rural Road Rehabilitation Hohkraik Ki'ik Chainage 0+000 - 2+600 Ainaro Municipality | 82.50 % |
| 210 | P3408 | Nova Konsttrusaun Edificio EPE Audian (EBF 1.2 Camenasa) Manequen, suai villa. | 100.00 % |
| 211 | P3405 | New Construction of Cyclope Protection in Laclo River, Dato, Liquica | 71.00 % |
| 212 | P3403 | Construction of Waidasu Irrigation Retaining Wall and Canal | 100.00 % |
| 213 | P3400 | Moru Protesaun gabions Mota Zumalai Sta. 0+000-0+310,54 Km, Suco fatuleto Posto Adm. Zumalai, Municipio Covalima | 100.00 % |
| 214 | P3397 | Obra Konstrusaun Moru Protesaun Cyclope Mota Nunura Package III (Sta.0+440 - Sta. 0+683.23) | 100.00 % |
| 215 | P3386 | Konstrusaun Foun Dormitorio iha Uma Mahon Salele, Municipio Covalima | 100.00 % |
| 216 | P3384 | Construcao do Novo Gabinete da Procuradoria - Geral, Residencia E Edificio de Apoio Em Letefoho, Municipio de Manufahi | 29.67 % |
| 217 | P3379 | Konstrusaun Eskema Irrigasaun Logo-Bere Ossu | 5.22 % |
| 218 | P3378 | Continuation Construction of Main Canal for Oebaba Irrigation Scheme Covalima Municipality | 100.00 % |
| 219 | P3370 | Emergency River Normalization and Gabion Construction in Maumeta | 100.00 % |
| 220 | P3367 | Konstrusaun Moru Protesaun ba Mota Aipelu II, Raucasa, Bazartete, Municipio Liquica | 100.00 % |
| 221 | P3336 | NEW CONSTRUCTION OF CASERNAS PNTL IN CAILACО, BOBONARO MUNICIPALITY | 0.12 % |
| 222 | P3321 | Novo Konstrusaun Esquadra PNTL Hatulia B Tipo C | 0.00 % |
| 223 | P3314 | New Construction of UPF, TL-PDP Building in RAEOA (Manu Mutin) | 100.00 % |
| 224 | P3313 | New Construction of UPF, TL-PDP Building in Sesu, RAEOA | 100.00 % |
| 225 | P3312 | New Construction of UPF, TL-PDP Building in Saben, RAEOA | 74.62 % |
| 226 | P3308 | Construction of UPF, TL-PDP Melhoramento Building in Kaun, Suco Naimeko, RAEOA | 100.00 % |
| 227 | P3307 | Emergency River Normalization and Construction of Gabion in Tunubibi, Bobonaro Municipality | 100.00 % |
| 228 | P3306 | Construction of UPF, TL-PDP Melhoramento Building in Santizak, Suco Nipane, RAEOA | 100.00 % |
| 229 | P3304 | Rehabilitation of U.P.F. Existing Building in Citrana Oecusse Municipality | 100.00 % |
| 230 | P3303 | Rehabilitation of U.P.F. Existente Building in Manhata RAEO Municipality | 100.00 % |
| 231 | P3302 | Rehabilitation of U.P.F. Existente Building in Cruz, RAEOA Timor-Leste | 100.00 % |
| 232 | P3301 | Construction of UPF, TL-PDP Melhoramento Building in Quibiselo, RAEOA | 100.00 % |
| 233 | P3299 | Rehabilitation of U.P.F. Existing Building in Nipane, RAEOA, Timor-Leste | 100.00 % |
| 234 | P3296 | Construction of UPF, TL-PDP Melhoramento Building in Bora Lolotoe Alto Lebos, Bobonaro Municipality | 92.29 % |
| 235 | P3295 | Construction of UPF, TL-PDP Melhoramento Building in Nularan, Tunubibi, Bobonaro Municipality | 97.31 % |
| 236 | P3294 | Construction of UPF, TL-PDP Melhoramento Building in Uma Kou, Memo, Bobonaro Municipality | 93.88 % |
| 237 | P3293 | New Construction of UPF, TL-PDP Melhoramento Building in Oa Detan, Tunubibi, Bobonaro Municipality | 87.75 % |
| 238 | P3292 | Construction of UPF, TL-PDP Melhoramento Building in Nunura, Leohitu, Balibo, Bobonaro Municipality | 93.74 % |
| 239 | P3291 | Construction of UPF, TL-PDP Melhoramento Building in Wefauk, Balibo, Bobonaro Municipality | 66.32 % |
| 240 | P3290 | Construction of UPF, TL-PDP Melhoramento Building in Kaizu Laran, Balibo, Bobonaro | 96.95 % |
| 241 | P3288 | Construction of UPF, TL-PDP Melhoramento Building in Sukaer Midar, Bobonaro Municipality | 90.45 % |
| 242 | P3287 | Rehabilitation Of UPF Existing Building at Saburai, Bobonaro Municipality | 83.16 % |
| 243 | P3280 | Rehabilitation of U.P.F. Existing Building in Memo, Bobonaro Municipality | 84.53 % |
| 244 | P3279 | Rehabilitation of U.P.F. Existing Building Nunura H.L.A. Bobonaro Municipality | 99.86 % |
| 245 | P3278 | Rehabilitation of U.P.F. Existing Building, Leohitu, Bobonaro, Timor-Leste | 85.70 % |
| 246 | P3276 | Rehabilitation Of U.P.F. Existing Building in Derok Ren, Bobonaro - Timor Leste | 88.31 % |
| 247 | P3275 | Rehabilitation of U.P.F. Existing Building, Badut Mean, Bobonaro, Timor Leste | 94.50 % |
| 248 | P3273 | New Construction of UPF, TL-PDP Building in Fatumea, Covalima Timor Leste | 100.00 % |
| 249 | P3272 | New Construction of UPF, TL-DPD Building in Wemauk, Covalima, Timor-Leste | 75.00 % |
| 250 | P3271 | New Construction of UPF, TL-PDP Building in Lela, Covalima | 86.74 % |
| 251 | P3263 | Konstrusaun Foun Postu Vizilansia Posto Moruk Laran Tilomar | 100.00 % |
| 252 | P3262 | Construction of UPF, TL-PDP Melhoramento Building in Wesei, Covalima Municipality, Timor Leste | 100.00 % |
| 253 | P3261 | Construction of UPF Lenkede - PDP Melhoramento Building in Covalima, Timor-Leste | 100.00 % |
| 254 | P3260 | Construction of UPF, TL-PDP Melhoramento Building in Anin Matan, Covalima, Timor-Leste | 100.00 % |
| 255 | P3259 | Construction of UPF, TL-PDP Melhoramento Building in Horak, Covalima Municipality, Timor Leste | 80.00 % |
| 256 | P3257 | Rehabilitation Of U.P.F. Existing Building at Wala Lama, Covalima - Timor Leste | 100.00 % |
| 257 | P3256 | Rehabilitation Of U.P.F. Existing Building at Foho Lulik, Covalima -Timor Leste | 90.00 % |
| 258 | P3255 | Rehabilitation of U.P.F. Existing Building in Aikakar, Covalima - Timor Leste | 90.00 % |
| 259 | P3254 | Rehabilitation Of U.P.F. Existing at Fatumea, Covalima - Timor Leste | 100.00 % |
| 260 | P3253 | Rehabilitation Of U.P.F. Existing Building in Belulik Kraik, Covalima, Timor Leste | 100.00 % |
| 261 | P3252 | Rehabilitation of U.P.F. Existing Building in Fatuk Lulik, Covalima - Timor Leste | 100.00 % |
| 262 | P3226 | Construction of UPF, TL-PDP Melhoramento Building in Gildapil, Bobonaro Municipality | 73.06 % |
| 263 | P3201 | ROUTINE MAINTENANCE WORKS Performance-Based Contract For Road Maintenance ( Bazeia ba Servisu Atual ) Ermera Municipality | 64.96 % |
| 264 | P3196 | New Construction of Gabion Wall Protection for Lamara and Sahen River, (Section I: 0+000-0+470), (Section II: 0+000-0+440), (Section III:0+000-0+150), (Section IV: 0+000-0+218). (Total Length of Section: 1.278 KM) | 100.00 % |
| 265 | P3195 | Obra Muru Protesaun Mota Fatumoli. Package II Right Side Profile Type II & Type IV (Sta. 0+000 - Sta. 0+213 & Sta. 0+000 - Sta. 0+097) Aldeia Tutubaba, Suco Aidabeleten, Posto Adm. Atabae, Municipio Bobonaro | 100.00 % |
| 266 | P3187 | New Construction of Fence, Wall Protection and Excavation Works at Garden Herois Natarbora | 82.14 % |
| 267 | P3184 | New Construction of Gapura & Fence in Garden of Herois Maliana | 71.04 % |
| 268 | P3181 | Emergency River Normalization & Gabion Construction in Tibar Sta. 0+000 to Sta. 1+100 (1,1 Km) | 100.00 % |
| 269 | P3179 | Protesaun ba Mota Buibau, Municipio Baucau Seccao I Sta. 0+000 - Sta. 0+530 | 15.59 % |
| 270 | P3175 | Emergercy Project Construction of Ponte Abatu, Manufahi Municipality | 100.00 % |
| 271 | P3162 | ROUTINE MAINTENANCE WORKS Perfromance - Based Contract for Ainaro Municipality | 95.12 % |
| 272 | P3160 | Rural Road Rehabilitation of Lore - Tchai, Lore 1, Chainage 0+000 - 2+300 (2.3 Km) Lautem Municipality | 83.23 % |
| 273 | P3159 | Obra Konstrusaun Gabion & Stone Masonry Lontas Lolotoe Bobonaro, (Sta. 0+000 - Sta. 0+200) | 75.00 % |
| 274 | P3158 | Obra Muru Protesaun Mota Fatumoli, Package I Left Side Profile Type I & Type III. (Sta. 0+000 - 0+388 & Sta. 0+000 - Sta. 0+146) Aldeia Tutubab, Suco Aidabeleten, Posto Adm. Atabae, Municipio Bobonaro | 100.00 % |
| 275 | P3138 | Rehabilitasaun Estrada Rural Solerema - Tohumeta - Bocolelo Pakote 5 Sta 12+000-14+000 Km, Suco Madabeno, Tahumeta, Fatisi, & Bocolelo, Posto Adm. Laulara, Municipio Aileu | 18.20 % |
| 276 | P3136 | Rehabilitasaun Estrada Rural, Solerema - Tohumeta - Bocolelo Pakote 3 Sta 6+000-9+000 Km, Suco Madabeno, Tahumeta, Fatisi, & Bocolelo, Posto Adm. Laulara, Municipio Aileu | 40.79 % |
| 277 | P3135 | Rehabilitasaun Estrada Rural, Solerema - Tahumeta - Bocolelo Pakote 2 sta 3+000-6+000 Km, Suco Madabeno, Tahumeta, Fatisi & Bocolelo, Posto Adm. Laulara, Municipio Aileu | 19.22 % |
| 278 | P3134 | Rehabilitasaun Estrada Rural, Solerema - Tahumeta - Bocolelo Pakote I sta 0+000-3+000 Km, Suco Madabeno, Tahumeta, Fatisi & Posto Adm. Laulara, Municipio Aileu | 24.60 % |
| 279 | P3129 | Kontrusaun Moru Protesaun Estrada Lehulolo, Aituto, Maubise Ainaro; Suco Aituto, Postu Maubisse, Municipio Ainaro | 86.73 % |
| 280 | P3127 | Obra Konstrusaun Muru Protesaun, Gabions Mota Lacluan Dotik (Right Side Sta. 0+000 - 0+560 Aldeia Lacluan Suco Dotik, Posto. Adm Alas Municipio Manufahi) | 100.00 % |
| 281 | P3126 | Obra konstrusaun ba moru protesaun, gabion no regularizasaun mota Sige Package II STA 0+360-STA 0+612.00 Suco Maununo Posto Adm. Ainaro Vila, Municipio Ainaro | 89.22 % |
| 282 | P3125 | Obra konstrusaun ba moru protesaun, gabion no regularizasaun mota Sige Package I STA 0+000-STA 0+360.00 | 100.00 % |
| 283 | P3124 | Emergency Project For Rehabilitation Water Drilling Works In Capital Dili | 62.87 % |
| 284 | P3122 | Obra Konstrusaun ba Moru Protesaun, Gabions, Groynes, Pipe Culvert, Cutch Basins & Line Drain Mota Daudere (Right Side Sta. 0+000 - 0+190) | 88.98 % |
| 285 | P3114 | Dili Urban Roads Package 2 Manleuana | 25.15 % |
| 286 | P3113 | Konstrusaun Rehabilitasaun Estrada Nacional Manehat (Sta. 0+000 - Sta. 0+094.50) | 99.23 % |
| 287 | P3112 | Obra Konstrusaun Moru Protesaun Gabion Pakote 1-3 Estrada Suco Lour Sta. 0+000 - 0+082 & Sta. 0+000 - 0+060 km Suco Lour, Posto Adm. Bobonaro, Municipio Bobonaro | 97.93 % |
| 288 | P3103 | Nova Construcao EBF Salele | 44.31 % |
| 289 | P3093 | Obra Konstrusaun Estrada no Moru Protesaun, ba Estrada Urbanu Rai Kuak, Letefoho, Same Sta. 0+000 Km - Sta. 0+113.30 Km Suco Letefoho, Posto Adm. Same, Municipio Manufahi | 100.00 % |
| 290 | P3092 | Guide Banks Protection for Approach Bridges Werunoco/Apikuru Lautem Suco Pairara, Posto Adm. Lautem Municipio Lautem | 98.46 % |
| 291 | P3090 | Nova Construcao EPE Tebabui, Municipio Bobonaro | 95.25 % |
| 292 | P3086 | Obra Construcao Box Culvert (RCBC) Ekorlala, Carbulau, Suco Holarua, Posto Adm. Same, Municipio Manufahi | 100.00 % |
| 293 | P3085 | Construction of Football Stadium and Tribune Building in Manatuto Municipality | 100.00 % |
| 294 | P3084 | Servico Emergencia Para Construcao De Protecao Da Irrigacao e Reabilitacao Aqueduto Raibere Em Ainaro | 100.00 % |
| 295 | P3082 | Konstrusaun Igreja Foun Paroquia Sao Paulo Lospalos | 36.08 % |
| 296 | P3081 | Nova Construcao ESG Filial Paralelo Uagoru | 1.80 % |
| 297 | P3080 | Nova Construcao EPE Caimauc | 100.00 % |
| 298 | P3079 | Nova Construcao EBF Comu-Oli | 100.00 % |
| 299 | P3078 | Nova Construcao EPE Maumela | 87.31 % |
| 300 | P3077 | Konstrusaun ka Rehabilitasaun ba ESG Paralelo Aubaca | 97.82 % |
| 301 | P3075 | Nova Construção EBC Abat Oan | 100.00 % |
| 302 | P3074 | Nova Construção EPE Opa Vila | 95.98 % |
| 303 | P3071 | Nova Construcao Edificio EPE Dom Marcal Saburai | 95.18 % |
| 304 | P3070 | Nova Construcao Edificio EPE Poerema | 76.32 % |
| 305 | P3066 | TOR For The Service Of Supervision & Site Management Of Civil Works (21ST Century Learning Spaces) | 93.63 % |
| 306 | P3062 | TOR for the services of Detailed Engineering Design of School Infrastructure Facilities (21st Century Learning Spaces) | 90.44 % |
| 307 | P3057 | Servisu Reabilitasaun Edificio Agencia De Desenvolvimento Nacional I.P. Iha Municipio Bobonaro | 100.00 % |
| 308 | P3056 | Obra Konstrusaun Moru Protesaun ba Mota iha Hera Mota Kiik, Municipio Dili (Package IV Right Side Sta. 0+000 - Sta. 0+400) | 13.92 % |
| 309 | P3055 | Obra Konstrusaun Moru Protesaun, Gabion Mota Lotan (Package II Right Side, Sta. 0+000 - Sta. 0+500 ) Aldeia Lotan, Suco Batugede, Posto Adm. Balibo, Municipio Bobonaro | 100.00 % |
| 310 | P3039 | Moru Protesaun Gabion, Groynes ba Mota Lour Pelet Package III Gabion L/s (Sta. 0+015 - Sta. 0+243) R/s (Sta. 0+000 - Sta. 0+070), Groynes, I (Sta. 0+110 - 0+112, II. Sta. 0+160 - 0+162. III Sta. 0+200 - 0+202) | 36.13 % |
| 311 | P3038 | R4D Rural Roads Routine Maintenance : Libaloa - Fahilebo Chainage 0+000 - 7+000, Fahilebo - Fatumasi Chainage 0+000 - 2+300, Fahilebo - Bucumera Chainage 0+000 - 6+500 | 100.00 % |
| 312 | P3035 | Rekuperasaun Moru Protesaun Mota Ain Postu Integradu Batugede (Controlo de Cheias) | 100.00 % |
| 313 | P3031 | Obra Konstrusaun ba Moru Protesaun iha Mota Hera Acanuno (Package I, Sta. 0+000 - 0+0283.19) | 33.88 % |
| 314 | P3029 | Rehabilitasaun Estrada Rural, Arlo - Adara Sta. 3+000 - 6+000 km Municipiu Atauro | 48.84 % |
| 315 | P3028 | New Construction of Community Health Centre ( CHC ) at Laisorulai-posto adm quelicai, Baucau Municipality | 60.32 % |
| 316 | P3027 | R4D Rural Roads Periodic Maintenance: Maumeta - Metagou - Bazartete Chainage 0+000 - 10+000, Gunaba - Lukulai Chainage 0+000 - 2+000 | 100.00 % |
| 317 | P3026 | R4D Rural Road Periodic Maintenance: Malaisera-Lisadila Chainage 0+000 - 9+600, Samaropo-Gisu 0+000 - 2+000 | 100.00 % |
| 318 | P3007 | Rehabilitasaun Estrada Rural Dato Tolu- Taroman Sta, 8+000 - 10+000 Km | 60.77 % |
| 319 | P3003 | Apoio Dezenvolvimento de Instalasaun Sitiu Turistiku iha Municipio Viqueque | 38.44 % |
| 320 | P3001 | R4D Rural Roads Periodic Maintenance: Barcau - Maubaralisa Chainage 0+000 - 12+500, Nunuleta - Darulema Chainage 0+000 - 2+000 | 100.00 % |
| 321 | P2998 | Road Upgrading Laclubar Junction - Laclubar Town (Package 3a, 3b, 3c) Sta. 0+000 - 10+360 | 22.07 % |
| 322 | P2986 | Rehabilitasaun Estradas Rural, Liurai - Hatobuilico Pakote 1 Sta. 0+000 - 3+100, Suco Liurai, Adm. Maubisse, Municipio Ainaro | 46.00 % |
| 323 | P2972 | Manutensaun Rutina Estradas Rural, Fahisoi - Fadabloko Chainage 0+000 - 9+000 km; Hautoho - Liquica Chainage 0+000 - 2+500 km; Fahisoi - Dailouta Chainage 0+000 - 5+000 km | 100.00 % |
| 324 | P2971 | R4D Rural Roads Periodic Maintenance: Daisoli - Fatubosa Chainage 0+000 - 7+300 km; Kirlelo - Laclo Chainage 0+000 - 11+300 km, Aileu Municipality | 100.00 % |
| 325 | P2970 | R4D Rural Periodic Maintenance : Namalesu - Faturilao Chainage 0+000 - 14+000, Aileu Municipality | 100.00 % |
| 326 | P2969 | Road Maintenance Section : Gleno Urban Road, Ermera Municipality | 86.87 % |
| 327 | P2968 | Rehabilitasaun estrada Rural, Dailari - Samaguia Sta. 2+300 - 4+630 km | 34.01 % |
| 328 | P2961 | Construsaun Estrada Rural, Beco Tobur Sta. 12+000 - 14+500 km | 17.15 % |
| 329 | P2960 | Rehabilitacao Estrada Rural, Beco Tobur II Sta. 9+000 - 12+000 km, Suco Beco, Posto Adm. Suai, Municipio Covalima | 100.00 % |
| 330 | P2959 | Rehabilitasaun Estrada Rural, Beco Tobur II Chainage Sta. 6+000 - 9+000 Km, Municipio Covalima | 100.00 % |
| 331 | P2952 | Rehabilitasaun Estrada Rural Cailaco-Poerema, Chainage 0+000-1+500, Suco Hatudara, Posto Adm. Cailaco Municipio Bobonaro | 70.00 % |
| 332 | P2951 | Rehabilitasaun Estrada Rural Atus Gildapil, Chainage 0+000 - 3+000, Suco Gildapil, Posto Adm. Lolotoe, Municipio Bobonaro | 45.00 % |
| 333 | P2921 | Konstrusaun Kazernas no Paragen | 95.55 % |
| 334 | P2920 | New Construction of dormitory and parking area Natarbora Manatuto Municipality Manatuto | 100.00 % |
| 335 | P2919 | New Construction of dormitory and parking area Triloca Municipality Baucau | 99.35 % |
| 336 | P2916 | Rehabilitasaun Estrada Rural, Sagadati - Beliuali Sta. 0+000 - 3+250 km Municipio Baucau | 48.47 % |
| 337 | P2907 | Rehabilitasaun Estrada Rural Matanoba - Oeleu Chainage 0+000 - 4+200, Suco Fatubesi, Posto Adm. Hatulia, Municipio Ermera | 83.89 % |
| 338 | P2905 | Rehabilitasaun Estrada Rural, Ossu De Cima - Liaruca Road Sta. 10+000 - 12+000 Suco Ossu de Cima, Posto Adm. Ossu, Municipio Viqueque | 35.80 % |
| 339 | P2904 | Rehabilitasaun Estrada Rural, Ossu De Cima - Liaruca Road Sta. 8+000 - 10+000, Posto Adm. Ossu, Municipio Viqueque | 32.00 % |
| 340 | P2903 | Rehabilitasaun Estrada Rural, Nabo - Daragata Road Sta. 6+000 - 8+300 Suco Loiulu, Irabin de Cima, Bahatata, Posto Adm. Uatucarbau, Municipio Viqueque | 20.00 % |
| 341 | P2902 | Rehabilitacao Estrada Rural Uaidasu to Nabo, Suco Loiuulu, Irabin de Cima, Bahatata, STA 3+000 - 6+000, Posto Adm. Uatucarbau, Municipio Viqueque. | 24.50 % |
| 342 | P2898 | Rehabilitasaun Estrada Rural, Ulucaibei - Caiulita Road Sta. 3+500 - 7+000 km | 24.00 % |
| 343 | P2891 | Rehabilitasaun Estrada Rural, Suco Buibau - Samalari - Belavista, Sta 8+000-10+500 km, Package V Municipio Baucau | 28.17 % |
| 344 | P2890 | Rehabilitasaun Estrada Rural, Suco Buibau - Samalari - Belavista, Package IV 6+000-8+000 km | 47.14 % |
| 345 | P2889 | Rehabilitasaun Estrada Rural, Suco Buibau - Samalari - Vilavista, Package III+4000-6+000 Km | 19.12 % |
| 346 | P2888 | Rehabilitasaun Estrada Rural, Suco Buibau - Samalari - Vilavista, Package II 2+000-4+000 km | 17.13 % |
| 347 | P2887 | Rehabilitasaun Estrada Rural, Suco Buibau - Samalari - Belavista, Package I 0+000-2+000 km | 36.80 % |
| 348 | P2884 | Rehabilitasaun Estrada Rural, Abuti to Serebu'u (Package II) Sta. 2+150-4+300 km | 12.00 % |
| 349 | P2883 | Rehabilitasaun Estrada Rural, Abuti to Serebeu'u Package I (Sta. 0+000-2+150), Suco Sagadate, Posto Administrativo Laga, Municipio Baucau | 43.15 % |
| 350 | P2874 | Manutensaun Estrada Seksaun Gleno-Letefoho (Link A11-01), Sta 0+000 - Sta 25+850, Package 1 | 4.74 % |
| 351 | P2873 | Manutensaun Estrada Seksaun Humboe-Ermera Lama (Link A11-01 to Link C13), Sta 0+000 - Sta 4+920 & Mertuto - Villa Maria, Sta 0+000 - 4+690, Package 2 | 100.00 % |
| 352 | P2868 | Construction of New Office Building of Ministry of state Administration in Manatuto Municipality - New Constrcuction of Ministry of State Administration in Manatuto Municipality | 68.11 % |
| 353 | P2863 | New Construction Of Excavation and Leveling Works No Jardim de Herois De Maliana | 100.00 % |
| 354 | P2835 | Novo construção UPF Tunubibi | 0.00 % |
| 355 | P2834 | Construction of UPF, TL-PDP Melhoramento Building in Mota Ain, Balibo, Bobonaro Municipality | 87.44 % |
| 356 | P2823 | Konstrusaun Muralha SAMES Municipio Ainaro | 0.00 % |
| 357 | P2820 | Konstrusaun Foun ba Ofissio Rezidensia no Moru Edifisiu ADN.IP iha Municipiu Manufahi | 83.70 % |
| 358 | P2808 | Supply, Installation and Commissioning Of New Panel and Underground Cable System at Palacio Presidente Aitarak Laran, Dili, Timor- Leste | 25.00 % |
| 359 | P2805 | Executar a Nova Construcao de Dormitoriu de Autoridade Aduaneira em Campound Batugade Municipio Bobonaro | 100.00 % |
| 360 | P2796 | Novo de Construçāo Edificio PRE-ESCOLAR (EPE Taur Matan Ruak) Tali Oan | 73.88 % |
| 361 | P2792 | Additional Service Statement of Work for Year 2023 - Government Resource Planning Solutions & Supporting IT Infrastructure System Implementation & Support Agreement | 100.00 % |
| 362 | P2789 | R4D Rural Roads Periodic Maintenance: Metagou-Aibenu Chainage 0+000 - 7+600, Taltabi-Kutulau Chainage 0+000 - 1+700 | 100.00 % |
| 363 | P2784 | Konstrusaun ba Extensaun Sala Karantina ba Resepsaun no Inspesaun ba Aimoruk iha SAMES I.P | 100.00 % |
| 364 | P2783 | Normalizasaun Mota Ulun Becora, Mota Camea-Olipezadu, Mota Bidau Masaur ho Pantai Kelapa Dili Municipality | 100.00 % |
| 365 | P2781 | Konstrasaun Postu Saude Laclubar Funar- Postu Administrativo Laclubar | 98.43 % |
| 366 | P2780 | New Construction Of Water Drill Installation and House For Panel No Jardim Dos Herois De Liquica | 36.13 % |
| 367 | P2779 | New Construction Of Excavation Work Wall, Levelling Work and Pavement Work No Jardim De Herois De Liquica | 100.00 % |
| 368 | P2778 | New Construction of Capela Tilomar Paroco Santo Antonio Maria Clraet, Municipality Covalima | 85.00 % |
| 369 | P2776 | Konstrusaun Moru Haleu Igreja Paroquia de Nossa Senhora de Fatima Suai | 100.00 % |
| 370 | P2771 | New Construction of RTTL, EP Office Building in Caicoli, Dili Municipality | 33.20 % |
| 371 | P2770 | Servisu Rehabilitasaun no Manutensaun Edificio Central SEPC | 100.00 % |
| 372 | P2769 | Nova Construção Edifisio Escola EBF Loco-Loco | 100.00 % |
| 373 | P2767 | Nova Construção Edifisio Escola EBF Caicassabu'u | 100.00 % |
| 374 | P2757 | Komisaun konstrusaun uma kreda Igreja Evangelica assembleias de deus ( IEAD) Congreagacao Belem Nazare | 34.54 % |
| 375 | P2743 | Servisu Rehabilitasaun Edificio Agencia de Desenvolvimento Nasional,IP iha Municipio Viqueque Municipality | 99.89 % |
| 376 | P2742 | Konstrusaun Edifisiu ADN (Residensia, Eskritoriu, moru hadulas no fasilidades ) iha Municipio Manatuto | 0.00 % |
| 377 | P2741 | Rehabilitation of ADN,IP Office at Liquisa Municipality | 100.00 % |
| 378 | P2740 | Servisu Rehabilitasaun Edificio Agencia de Desenvolvimento Nasional,IP iha Municipio Lautem | 86.58 % |
| 379 | P2739 | Servisu Rehabilitasaun Edificio Agencia de Desenvolvimento Nasional,IP iha Municipio Ermera | 100.00 % |
| 380 | P2738 | Servisu Rehabilitasaun Edificio Agencia de Desenvolvimento Nasional,IP iha Municipio Covalima | 100.00 % |
| 381 | P2737 | Servisu Rehabilitasaun Edificio Agencia de Desenvolvimento Nasional,IP iha Municipio Bobonaro | 98.94 % |
| 382 | P2736 | Servisu Rehabilitasaun Edificio Agencia de Desenvolvimento Nasional,IP iha Municipio Baucau | 100.00 % |
| 383 | P2735 | Servisu Rehabilitasaun Edificio Agencia de Desenvolvimento Nasional,IP iha Municipio Ainaro | 64.40 % |
| 384 | P2734 | Rehabilitation of ADN,IP Office at Aileu Municipality | 100.00 % |
| 385 | P2723 | Exercício do Direito de Opção de Acesso à Infraestrutura de Comunicações NWCS Operado pela VOCUS no Norte da Austràlia | 72.85 % |
| 386 | P2719 | Consulting Services Preparation for Detail Engineering & Bid Preparation for New Bridge 'BRIDGE OF SUMACO (LACLUTA UMA TOLU)' Final Design Drawing STA. 0+000 - STA. 0+236.853 | 15.00 % |
| 387 | P2718 | New Construction Of Bridge Sana Uatulari Laisorulai 50M Steel Truss Bridge (Sta. 0+000 - Sta. 0+767.36) in Viqueque Municipality | 6.75 % |
| 388 | P2717 | Obra Konstrusaun Ba Rekoperasaun : Moru Protesaun Tibar Cyclope(Sta. 0+000 - 0+095) Sucto Tibar, Posto Administrativo Bazartete, Municipio Liquica | 100.00 % |
| 389 | P2715 | Consulting Services Preparation for Detail Engineering & Bid Preparation for New Bridge 'BRIDGE OF MALOA MATADOURO RTK' Final Design Drawing STA.0+000 - 0+350 | 10.00 % |
| 390 | P2712 | Rehabilitation of Dili to Baucau Highway Project STA. 0+000 - 0+120 Suco Bucoli, Posto Adm. Baucau, Municipio Baucau | 100.00 % |
| 391 | P2711 | Rehabilitation of SEAC Office | 40.00 % |
| 392 | P2710 | New Construction of UPF Post Building at Comandante - Em Chefe das FALINTIL KAY RALA XANANA GUSMAO | 40.00 % |
| 393 | P2709 | R4D Rural Roads Maintenance Saburai - Tasmasak Chainage 0+00-1+100, Raifun Chainage 0+000-1+100, Ritabou Chainage 0+000-2+100, Holsa-Saburai Chainage 0+000-8+500,Marobo Be Manas Chainage 0+000-5+700, Balibo-Cowa Chainage 0+000+10+000, Rairobo-Pasmaten Chainage 0+000-3+000, Aidabaleten Chainage 0+000-1+100, Balibo-Ferik katuas Chainage 0+000-7+700, Builecun-Leohitu Chainage 0+000-6+800, Malilait Chainage 0+000-3+200, Meligo-Daudo Chainage 0+000-4+100 | 100.00 % |
| 394 | P2708 | R4D Rural Road Rehabilitation Maliana - Saburai - Atus Chainage 0+0000-20+000 | 100.00 % |
| 395 | P2707 | New Construction of Jerusalem Building in Beloi, Atauro - Timor Leste | 49.49 % |
| 396 | P2706 | Construction of Residence for Health Staff in Suku Colimau (Kontinuasaun Projetu Abandonado Suco Molop) | 100.00 % |
| 397 | P2703 | Konstrusaunka Rehabilitasaun EBF Laclo, Atsabe Ermera | 91.36 % |
| 398 | P2701 | The Project Supervision Consultant (PSC) for the Baucau Municipal Capital Water & Sanitation Project | 72.15 % |
| 399 | P2696 | Obra Recoperacao Projeto Calamidade 'Cross Drain, Rotunda Nicolau Lobatu (RCBC Sta. 0+000 - 0+078 & Catch Basins Stone Massonry, RCPC to connect to Existing Line Drain Sta. 0+078-0+098 Supply and Instal Drainage Gutter Sta, 0+000-0+033' Dili Municipality | 99.83 % |
| 400 | P2693 | Konstruksaun Rekuperasaun Box Culvert , (Sta. 0+000 - 0+015) Retaining Wall (1-4), (Sta. 0+000 - 0+017, Sta. 0+000 - 0+013, Sta. 0+000 - 0+014 & Sta. 0+000 - 0+008) Suai Holbelis | 94.90 % |
| 401 | P2692 | Obra Konstrusaun ba Rekuperasaun Estragus husi Cheias 04 Abril 2021 Moru Proteksaun Estrada Nacional Tibar-Gleno (Nasuta), Suco Tibar Posto Adm. Bazartete, Municipio Liquica | 100.00 % |
| 402 | P2690 | Tor Melhoria do acesso a Internet Global para 1 Gbps Para Garantir a conectividade a Internet das Agencias do Governo | 80.00 % |
| 403 | P2689 | ToR Consultants Services for Preparation of DED Upgrading and Maintenance of Vila Maumeta to Biqueli Road (12.350 Km), Km 0+000 to Km 12+350 | 15.00 % |
| 404 | P2686 | Details Engineering Design (DED) for F-Fdtl's Radio and Comunication company's Office Building and Barrack at metinaro, Dili Municipality | 4.68 % |
| 405 | P2683 | For Preparation of Detailed Engineering ( DED) Services For New Building of F-FDTL'S Language Training Center at CFT Metinaro, Dili Municipality | 55.12 % |
| 406 | P2682 | For Preparation of Detailed Engineering ( DED) The F-FDTL Guard Post and Barrack at Olio Pezado, Hera and Camea, Dili Municipality | 45.98 % |
| 407 | P2680 | Construction of Box Culvert Selihasan River, in Same, Betano-Selihasan (A14) Manufahi Municipality | 100.00 % |
| 408 | P2677 | Nova Construcao Edificio EPE Railuli | 69.76 % |
| 409 | P2674 | Renovation of bathroom and Toilet Phase II at HNGV Dili | 99.63 % |
| 410 | P2673 | Expansion of Building 18 warehouse at HNGV Dili | 97.67 % |
| 411 | P2672 | New Room of Extracorporeal Shock Wave Lithotripsy at OT Building HNGV | 79.80 % |
| 412 | P2671 | Emergency Project Asphalting Works Dili Beduku Sarlala ( Air Terjun / Bandro Lebudoe ) Package II, Sta. 0+000 - 5+300 ( 5.3 km ) Aileu Municipality | 70.00 % |
| 413 | P2670 | Consultant Services Detailed Engineering Design/DED Construction of New Building of Provedoria dos Direitos Humanos e Justica (PDHJ) | 81.42 % |
| 414 | P2669 | Calamidade, Obra Construcao de Recuperacao de Calamidade Muro Estrutura Protecao de Ponte em Loes, Pacote II, (Sta. 0+000 - Sta. 0+080 & Sta. 0+200 - Sta. 0+440) | 15.68 % |
| 415 | P2667 | Konstrusaun Rekuperasaun Box Culvert, (STA 0+000-0+010) & Gabion (Sta 0+000-0+360) Suai Loro II Suai Loro Posto Adm, Suai, Municipio Covalima (LOT A) & Konstrusaun Rekuperasaun Calamidade Suai Loro I Box Culvert, (STA 0+028.69 & Line Drain Sta 0+000-0+130) Suco Suai Loro, Posto Adm, Suai, Municipio Covalima (LOT B) | 100.00 % |
| 416 | P2663 | Calamidade, Moru Proteksaun Mota Uani-Uma, Uatu-Carbau (Sta. 0+040 to Sta. 0+220 L/S) & (Sta. 0+000 to Sta. 0+270 R/S) | 100.00 % |
| 417 | P2661 | New Construction of Pathway to Connect ICU Mobile at HNGV, Dili Timor Leste | 32.85 % |
| 418 | P2659 | Re-dezeinho substrutura Edificio Administrasaun Municipio Ermera | 0.00 % |
| 419 | P2657 | Construction of Intersection in the Existing Dili-Liquica Road to Connect Access Road from Tibar Bay Port (National Road-A03) | 100.00 % |
| 420 | P2647 | New Construction of Excavation & Levelling Works in Garden of Heroes Lospalos | 14.85 % |
| 421 | P2644 | Obra Construcao de Recuperacao de Calamidade Moru Estrutura Protecao Ponte Loes, Pacote I (Sta. 0+080 to Sta. 0+200) Postu Adm. Maubara, Municipio Liquica | 20.00 % |
| 422 | P2643 | Supervision Consultant for Construction of Intersection in the Existing Dili - Liquica Road to Connect Access Road from Tibar Bay Port (National Road - A03) Sta. 0+000 - Sta. 0+620 | 79.33 % |
| 423 | P2642 | Provision of Consultancy Service for Preparation of Detailed Engineering Design (DED) and Bidding Document for Lamara Bridge on National Road (A09-04) Under Road Network Upgrading Sector Project (RNSUP), Access Bridge to Link Manehat to Natarbora, Manatuto Municipality | 95.72 % |
| 424 | P2640 | Project Check Dam In Haimanu River, Municipality of Covalima | 90.00 % |
| 425 | P2639 | Rehabilitasaun of Toilet Covid-19 At suco Carau Balu Viqueque, Ministerio Saude Timor Leste | 63.23 % |
| 426 | P2633 | Konstrusaun Edifisiu no Sala aprendijazem ba Sentru Formasaun CDC Baucau | 2.49 % |
| 427 | P2632 | R4D Rural Road Rehabilitation Of Cainliu - Larisula 11+050 - 13+050, Lautem Municipality | 100.00 % |
| 428 | P2631 | Construcao ba recuperacao Calamidade Contrucao morru protecao'Cyclope' (Sta. 0+000 to Sta. 0+177.29), Suco Wenunuk, Posto Administrativo Metinaro, Municipio Dili | 20.00 % |
| 429 | P2628 | R4D Rural Road Rehabilitation : Laga - Daelari - Afaca to Darenafa Roads Sta. 0+000 - 2+300 km, Baucau Municipality | 90.44 % |
| 430 | P2627 | R4D Rural Road Rehabilitation : Lakawa to Wairoke Roads Sta. 0+000 - 2+300 km, Lautem Municipality | 58.74 % |
| 431 | P2626 | New Plan of Gabion Protection in Taiblor (Sta 0+000- Sta 096) Suco Bandudato, Posto Administrativo Aileu, Municipio Aileu | 100.00 % |
| 432 | P2625 | New Plan of Gabion Protection in Eralolo (Sta 0+000 - Sta 0+011), Suco Lahae, Posto Administrativo Aileu | 100.00 % |
| 433 | P2618 | Konstrusaun Foun Moru Protesaun ba Armazem SAMES Regional Maliana | 100.00 % |
| 434 | P2616 | LOT 1: Emergency Project For Construvtion Work of Calamity Recuperation For 'Wall Protection at Kasnafar Comoro River ( Sta. 0+561.29 ) Package 2 Dare Village, Post Administration of Vera Cruz, Municipality of Dili | 100.00 % |
| 435 | P2615 | LOT 2: Emergency Project For Construction of Retaining Wall Protection of Comoro Lisbutak River ( Package III ) Sta. 0+000 - Sta. 0+323.9 | 100.00 % |
| 436 | P2614 | Calamidade, Cyclone Seroja 04 April 2021 : Konstrusaun Moru Proteksaun Mota Comoro Metin IV, (Sta. 0+000 - Sta 0+400 & Sta 0+550 - Sta 0+590) | 74.32 % |
| 437 | P2611 | Desenha Konstrusaun Foun Ba Colegio Escola Tecniku Agricola Natarbora-Mantuto No Escola Tecnikuagricola Maliana Bobonaro | 100.00 % |
| 438 | P2609 | Manutensaun Kanal Irigasaun Lotan Iha Batugade, Munisipio Bobonaro | 100.00 % |
| 439 | P2608 | Rehabilitasaun of Loes Irrigation Scheme | 0.00 % |
| 440 | P2607 | New Construction of Path way Conection of ICU Building and Isolation Building at Hospital Referal Suai, Covalima, Timor-Leste | 87.25 % |
| 441 | P2606 | Consultancy Service for Development of an Integrated Project Management Information System (PMI) for Ministry of Public Works | 83.05 % |
| 442 | P2605 | Konstrusaun Moru Proteksaun Mota Comoro Lisbutak (Package 4), (Sta. 0+000 to Sta. 0+048.16) | 100.00 % |
| 443 | P2603 | Reabilitação Da Rampa De Lançamento De Embarcações Das F-FDTL em Behau, Manatuto | 97.51 % |
| 444 | P2602 | Construction of Pathway at Ex-Hospital Trilolo, Baucau, Ministry of Health, Timor Leste | 99.95 % |
| 445 | P2601 | Konstrusaun Fatin Serimonia Tomada de Posse Prezidente Republika 19 Maiu 2022 iha Tasi - Tolu Lote.1 Konstrusaun Access Road no Parking Area | 100.00 % |
| 446 | P2599 | Rehabilitation of Municipal Roads Package 11 : Section Maliana Town, Phase 2 (Main Road) | 99.00 % |
| 447 | P2598 | Rehabilitation of Municipal Roads Package 11 : Section Maliana Town, Phase 1 ( Local Roads ) | 99.00 % |
| 448 | P2597 | Construction of Wall fence at Central SAMES warehouse of SAMES/MOH Timor Leste | 0.33 % |
| 449 | P2596 | Emergency Kalimidade 04 de Abril River Training Ailok Laran Hera 'Spur of Groynes & Retaining Wall' Package 3 (Sta. 0+140 - Sta. 0+340), Municipio Dili | 10.00 % |
| 450 | P2595 | Renovation of bathroom adn Toilet at HNGV Dili | 100.00 % |
| 451 | P2593 | Complition of Veteranus Houses - Lospalos Municipality Lautem | 91.58 % |
| 452 | P2590 | Konstrusaun Fatin ceremonia tomada de posse Presidente Republica 19 Maio 2022 LOTE 2 Konst.Fatin Ceremonia | 100.00 % |
| 453 | P2587 | New Construction Drainage of Around Hospital Referal Maliana,Timor Leste | 100.00 % |
| 454 | P2583 | LOT 3: Emergency Project For Construction of Retaining Wall Protection of Comoro Lisbutak River ( Package 6 ) Sta. 0+000 - Sta. 0+352.38 | 100.00 % |
| 455 | P2582 | Construção Moru Proteção 'Recoperação Danos Estrutura Proteção Ribeira Benamauk, Becora ( Package 2 )' Suco Becora, Posto Adm. Cristo Rei, Municipio Dili | 97.19 % |
| 456 | P2580 | Road Rehabilitation of Municipal Roads Laclo to Laclo Town Sta. 0+000 - 18+500 Lot 1 : Section I ( Manatuto - Laclo 13.672 km ) | 87.25 % |
| 457 | P2579 | TOR for Consultant Services for Preparation of Detailed Engineering Design for Road Section 1 : District (Collector, 23) Road Hatudo - Ainaro L=25.02 Kms, Section 2 : Ainaro Urban Road =20 Kms | 100.00 % |
| 458 | P2577 | Consulting Services For Construction Supervision For Rehabilitation Of Maliana Local Roads Phase I (L= 20,35796 km) & Urban Roads Phase II (L= 4,90711 km) | 66.95 % |
| 459 | P2561 | Konstrusaun ka Rehabilitasaun ba Eskola Pre-Eskolar Aiaras | 94.39 % |
| 460 | P2559 | Rehabilitation of Gabion Protection (Sta 0+000 - Sta0+028.71), Suco Aituto Posto Administrativo Maubise, Municipio Ainaro | 100.00 % |
| 461 | P2558 | Rehabilitasaun CHC ba Izolamento Ainaro Villa relasiona covid19 | 100.00 % |
| 462 | P2556 | Rural Road Routine Maintenance Letefoho-Sorimbalu Chaninage 0+000-10+500 and Atsabe-Laubono Chainage 0+000-11+600, Emera Municipality | 100.00 % |
| 463 | P2552 | Emergency Project Cyclone Seroja 04 April 2021, Konstrusaun Moru Proteksaun Becora Terminal Sta (0+000 - 0+110) Suco Becora, Posto Adm Cristo Rei - Municipio Dili | 6.24 % |
| 464 | P2551 | Emergency project, Cyclone Seroja 04 April 2021,New Construction of Check Dam and Retaining Wall Becora - Benamauk Municipio Dili | 100.00 % |
| 465 | P2550 | New Construction of Paving Block at INS Comoro Dili Municipality | 6.45 % |
| 466 | P2549 | New Construction Building for Central Electrical in Luak Manufahi, Ministry of Health Timor Leste | 97.19 % |
| 467 | P2547 | Konstrusaun Foun ba Moru Protesaun ba Armazen SAMES Regional Baucau iha Municipio Baucau | 100.00 % |
| 468 | P2546 | Emergency Road Upgrading Project of Dili (Rai-Kotu) Tasitolu Road Road Link A03-01)km8.00 (Sta. 8+000) to km 8.74 (sta. 8+743.246) | 100.00 % |
| 469 | P2545 | Emergency Project, Cyclone Seroja 04 Abril 2021, Rehabilitation Retaining Wall For River at Camea (Sta. 1+727.99 - Sta. 1+ 950.00), Dili Municipality | 100.00 % |
| 470 | P2544 | Construction Of Retaining Wall For Slope Protection at Becora Au-hun to Bidau Sagrada Familia Package II (Sta. 3+700 - Sta. 4+134.44) | 100.00 % |
| 471 | P2543 | Construction Of Retaining Wall for Slope Protection at Becora Au-hun to Bidau Sagrada Familia, Package I ( Sta, 3+300 - 3+700 ) Dili Municipality | 100.00 % |
| 472 | P2542 | Rehabilitation of Ex. Hospital Building for Isolation Covid-19 in Viqueque Vila | 100.00 % |
| 473 | P2540 | New Construction of Laboratory for Covid-19, at Sentru Internamentu Ainaro Villa, Ministry of Health, Timor Leste | 81.71 % |
| 474 | P2539 | Supply and Installtion Main Power For Isolation and Laboratorium Building Ma'abat Manatuto Municipality | 96.46 % |
| 475 | P2538 | New Construction of Fence at Izolation Covid-19 in Ma'abat Manatuto Municipality | 94.03 % |
| 476 | P2537 | Rehabilitation of PMU Office Building A and PMU Office Building B in Caicoli, Dili | 51.16 % |
| 477 | P2536 | 'Road Maintenance Section - Diili West' Dili Municipality | 78.02 % |
| 478 | P2535 | Roads Maintenance section ( Dili East ) Dili Municipality | 70.81 % |
| 479 | P2530 | Manutenção Estrada Urbana ba Municipio 8 ( 340 km ), Municipio Dili | 66.99 % |
| 480 | P2528 | Flood Control Holsa Maliana (RE-BID) | 100.00 % |
| 481 | P2517 | Rehabilitacao Estrada Rural Kraras to Weluli, Suco Bibileo, Uaimori and Uma Ki'ik, STA 0+000 - 2+200, Posto Adm. Viqueque, Municipio Viqueque | 68.50 % |
| 482 | P2498 | Reabilitasaun Estrada Rural, Holarua - Tirilolo liga too Fallitehu Roas Sta, 3+000-6+000 Km | 4.80 % |
| 483 | P2497 | Reabilitasaun Estrada Rural, Fatucahi -Qiran Tetuk, Pakote 3 Sta, 16+400-18+850 Km | 15.00 % |
| 484 | P2496 | Reabilitasaun estrada Rural,Fatucahi - Qiran Tetuk Road Sta,14+200-16+400 Km | 13.08 % |
| 485 | P2495 | Rehabilitasaun Estrada Rural,Fatucahi - Qiran tetuk Road Sta, 12+000-14+200 Km | 43.70 % |
| 486 | P2465 | Rehabilitasaun Aibenu - Laberlaka Road Package III Sta 6+000 - 9+000, Suco Darulete-Leotela, Posto Liquica, Municipio Liquica (Re-Tender) | 67.00 % |
| 487 | P2464 | Rehabilitasaun Aibenu-Laberlaka Road, Package II Sta 3+000-6+000, Suco Darulete-Leotela-Hatuquesi, Posto Liquica, Municipio Liquica | 54.00 % |
| 488 | P2463 | Rehabilitasaun estrada Rural, Aibenu - Laberlaka Road Package (I) Sta 0+000 - 3+000 | 70.07 % |
| 489 | P2462 | Rehabilitasaun estrada Rural, Fazenda - Manati Road Package (III) 7+000 - 10+000 Km | 92.00 % |
| 490 | P2461 | Rehabilitasaun estrada Rural, Fazenda - Manati Road Package (II) Sta 3+500 - 7+000 Km | 93.00 % |
| 491 | P2460 | Rehabilitasaun estrada Rural, Fazenda - Manati Road Package (I) Sta 0+000 - 3+500 Km | 83.80 % |
| 492 | P2459 | Rehabilitasaun Dato - Liquica Road Package II Sta. 2+500-5+000, Ssuco Dato-Loidahar, Posto Liquica, Municipality Liquica | 84.84 % |
| 493 | P2457 | Rehabilitasaun estrada Rural, Ekaly - Lisaiko Road Package II 3+400 - 6+700 km | 47.92 % |
| 494 | P2456 | Rehabilitasaun estrada Rural, Ekaly - Lisaiko Road Package I 0+000 - 3+400 Km | 83.66 % |
| 495 | P2455 | Rehabilitasaun Estrada Rural, Vaviqunia - Nunulete Road Package II, 4+000-8+000 Km | 55.00 % |
| 496 | P2449 | Rehabilitasaun estrada Rural, Muapitine - Malahara, Sta. 6+000 - 9+000 km | 31.24 % |
| 497 | P2448 | Rehabilitasaun estrada Rural, Muapitine - Malahara Pakote 2, Sta. 3+000-6+000 km, Suco Muapitine Posto Adm. Lospalos, Municipio Lautem | 40.10 % |
| 498 | P2447 | Rehabilitasaun Estrda Rural, Muapitine to Malahara Pakote 1 Sta 0+000 - 3+000, Suco Muapitine, Posto Adm. Lospalos. Municipio Lautem | 90.66 % |
| 499 | P2446 | Rehabilitasaun Estrada Rural Poetete- Ermera 2+000 - 4+000, Package II Suco Poetete - Talimoro, Posto Adm. Gleno & Ermera, Minicipio Ermera | 100.00 % |
| 500 | P2444 | Reabilitasaun Estrada Rural Lauana - Katrai Kraik Chainage Sta, 3+000 - 6+000, Package II Suco Lauana & Katrai Kraik, Posto Administrativo Letefoho, Municipio Ermera | 68.46 % |
| 501 | P2442 | Reabilitasaun Estrada Rural Fatubolu - Manusahe Chainage 0+000 - 3+000, Suco Fatubolu - Manusae, Posto Adm. Ermera, Municipio Ermera | 79.59 % |
| 502 | P2438 | Reabilitasaun Estrada Rural Mau-Ubu-Urahou Chainage 0+000 - 2+500, Package IV Suco Mau-Ubu-Ura-Hou, Posto Adm. Ermera, Municipio Ermera | 55.80 % |
| 503 | P2437 | Reabilitasaun Estrada Rural Fronteira Fatubolu - Lisapat Roads Sta, 0+000 - 3+000, Suco Lisapat, Posto Adm. Ermera, Municipio Ermera | 55.24 % |
| 504 | P2436 | Rehabilitasaun Estrada Rural Poitete-Ermera Chainage 4+000 - 6+000, Package III Suco Poetete-Talimoro, Posto Adm. Gleno & Ermera, Municipio Ermera | 31.24 % |
| 505 | P2433 | Rehabilitasaun estrada Rural Borhei-Tidir-Raelorin Roads Sta. 2+500- 5+000 Km | 40.68 % |
| 506 | P2432 | Rehabilitasaun Estrada Rural Borhei-Tidir-Raelorin Chainage 0+000- 2+500, Package I Suco Humboe, Posto Adm. Ermera, Municipio Ermera | 76.21 % |
| 507 | P2431 | Rehabilitasaun estrada Rural, Samalete - Taraco Roads Sta. 3+000 - 6+700 | 35.83 % |
| 508 | P2427 | Rehabilitasaun estrada Rural, Railaku Kraik - Railaku Leten,0+000-3+000 | 0.00 % |
| 509 | P2426 | Rehabilitasaun estrada Rural Hatulia - Leimea Kraik 2+500 to 5+000 Km, Package II Suco Hatulia & Samara, Posto Adm. Hatulia A, Municipio Ermera | 80.25 % |
| 510 | P2425 | Rehabilitasaun estrada Rural Hatulia - Leimea Kraik Chainage 0+000 to 2+500, Package I Suco Hatolia & Samara, Posto Adm. Hatulia A, Municipio Ermera | 96.86 % |
| 511 | P2424 | Rehabilitasaun estrada Rural Hatulia - Koliati Roads 2+500 - 5+000 Km | 60.06 % |
| 512 | P2423 | Rehabilitasaun Estrada Rural Hatulia - Koliati Chainage Sta. 0+000 - 2+500, Package I, Suco Manutasi & Koliati, Posto Adm. Hatulia, Municipio Ermera | 41.69 % |
| 513 | P2422 | Rehabilitasaun estrada Rural Railaco - Leorema Roads Sta. 0+000-3+500 Km | 34.51 % |
| 514 | P2421 | Rehabilitasaun estrada Rural Humboe - Leguimea Chainage 0+000-4+700, Suco Humboe-Leguimea, Posto Adm. Ermera, Municipio Ermera | 86.59 % |
| 515 | P2402 | Spot Improvement Baltade - Orluli, Chainage 0+000 - 2+500 Manufahi Municipality | 100.00 % |
| 516 | P2386 | Rehabilitasaun Estrada Rural Dato Tolu - Taroman 10+000-12+220 | 54.01 % |
| 517 | P2384 | Rehabilitasaun Estrada Rural Dato Tolu-Taroman Sta, 5+000 - 8+000 (3.00km) Suco Dato Tolu & Taroman, Posto Adm. Fohorem & Fatululik, Municipio Covalima | 79.53 % |
| 518 | P2383 | Rehabilitasaun Estrada Rural, Suku Dato Tolu - Taroman 2+000-5+000 Km | 100.00 % |
| 519 | P2381 | Rehabilitasaun Estrada Rural Nanu Roads Sta. 0+000 - 3+950 Km | 54.43 % |
| 520 | P2380 | Rehabilitasaun Estrada Rural Belulik Kraik - Postu Policia BPU Roads Sta. 0+000 - 2+800 (2.8 Km) Suco Belulik Kraik, Posto Adm. Fatumea, Municipio Covalima | 65.56 % |
| 521 | P2378 | Rehabilitasaun Estrada Rural Gole-Tepa-Gudataz, Chainage 0+000 - 5+700, Suco Deudet-Opa-Guda, Posto Adm. Lolotoe, Municipio Bobonaro | 75.00 % |
| 522 | P2374 | Rehabilitasaun Estrada Rural Aldeia Raeluli - Postu UPF Has Naruk, Chainage 4+000 - 6+750, Suco Cowa, Posto Adm. Balibo, Municipio Bobonaro | 67.00 % |
| 523 | P2371 | Rehabilitasaun Estrada Rural Cailaco Villa - Suco Goulolo, Chainage 0+000 - 2+080, Suco Hatudara, Posto Adm. Cailaco, Municipio Bobonaro | 55.00 % |
| 524 | P2369 | Rehabilitasaun estrada Rural,Meligo - Cailaco Villa,0+000-3+000 Km | 98.00 % |
| 525 | P2366 | Rehabilitasaun Estrada Rural Halimesak - Lourvia, Chainage 0+000 - 3+000, Suco Lourvia, Posto Adm. Cailaco, Municipio Bobonaro | 45.00 % |
| 526 | P2365 | Rehabilitasaun estrada Rural Daudo Genulai, Chainage 0+000 - 4+400, Suco Daudo/Genulai, Posto Adm. Cailaco, Municipio Bobonaro | 35.00 % |
| 527 | P2364 | Rehabilitasaun estrada Rural Atabae Aidaba Leten II,3+000-4+000 Km | 47.00 % |
| 528 | P2363 | Rehabilitasaun Estrada Rural, Atabae - Aidabaleten Chainage 0+000-3+000, Suco Aidaba Leten, Posto Adm. Atabae, Municipio Bobonaro | 40.00 % |
| 529 | P2362 | Rehabilitasaun Estrada Rural Atus-Gildapil, Chainage 3+000-6+000, Suco Gildapil, Posto Adm. Lolotoe, Municipio Bobonaro | 45.00 % |
| 530 | P2361 | Calamidade, Cyclone Seroja 04 April 2021 'Moru Proteksaun Lahane Payol, Municipio of Dili | 50.96 % |
| 531 | P2359 | Rehabilitasaun Estrada Rural Lourba - Bobonaro, Chainage 0+000 - 1+600 Km, Suco Lourba, Posto Adm. Bobonaro, Municipio Bobonaro | 100.00 % |
| 532 | P2358 | Rehabilitasaun Estrada Rural Lourba - Bobonaro, Chainage 0+000 - 2+000, Suco Lourba, Posto Adm. Bobonaro, Municipio Bobonaro | 65.00 % |
| 533 | P2346 | For Road Maintanance Section Jct Aituto-Same-Betano 23Km(A04) | 100.00 % |
| 534 | P2344 | Roads Maintenance section Lospalos - Iliomar (A08-3) Lautem Municipality | 100.00 % |
| 535 | P2339 | Roads Maintenance Section : Ermera - Hauba - Letefoho- Hauba (A10) 48 KM Ermera Municipality | 100.00 % |
| 536 | P2338 | Roads Maintenance Section : Viqueque-Makadiki (A08-3) | 100.00 % |
| 537 | P2335 | Roads Maintenance Section: Tibar-Gleno (A04) Multi-Year Program, Ermera Municipality | 49.79 % |
| 538 | P2334 | Roads Maintenance section Loes - Atabae (A03) & Batugede - Soso Bridge (A03) ( Multy yaer program/RM | 100.00 % |
| 539 | P2333 | For Roads Maintenance Section : Tibar - Liquica - Maubara, Carimbala - Loes (A03) | 96.60 % |
| 540 | P2332 | For Roads Maintenance Section : Mola - Mota Masin ( Multi - Year Program )/ RM Covalima Municipality | 100.00 % |
| 541 | P2296 | R4D Rural Road Maintenance Laulara - Ornai Chainage 0+000 - 8+000 and Routine Maintenance Acumau - Aicorema Chainage 0+000 - 2+000 Aileu Municipality | 54.92 % |
| 542 | P2287 | Fornesimento Konstrusaun Uma Laku Ramelau | 29.71 % |
| 543 | P2285 | Contrato de aquisicao / fornecimento sinais de transito para teritorio Timor Leste | 35.40 % |
| 544 | P2284 | Contrato De Aquisição/Fornecimento e Montagen De Sinais Semaforos Na Cidade De Dili (Zonas-Audian, Foho Osamean, Kuluhun e Elemloi) | 100.00 % |
| 545 | P2271 | Project Construction of Check Dam in Zolai River Municipality Covalima | 100.00 % |
| 546 | P2270 | R4D Rural Road Spot Improvement Samarapo -Gisu Chainage 0+000-2+000 | 100.00 % |
| 547 | P2269 | R4D Rural Road Spot Improvement Barkau (Vaviquina) - Maubaralisa Chainage 4+200-8+400 | 99.81 % |
| 548 | P2268 | R4D Rural Road Spot Improvement Barkau (Vaviquenia) - Maubaralisa - Chainage 8+400-12+500) | 90.47 % |
| 549 | P2267 | R4D Rural Road Spot Improvement Gunaba - Lukulai Chainage 0+000-2+000 | 100.00 % |
| 550 | P2266 | R4D Rural Road Spot Improvement Berlakuidu - Laberlaka Chainage 2+500-5+400 | 100.00 % |
| 551 | P2265 | R4D Rural Road Spot Improvement Fahilebo - Bucumera Chainage 3+000+6+500) Liquica Municipality | 100.00 % |
| 552 | P2264 | Emergency Project, Cyclone Seroja 04 Abril 2021 Bilimau Bridge Spur or Groynes & Retaining Wall, Municipality of Ermera | 100.00 % |
| 553 | P2254 | Construction and Installation of Jardim Motael (Motael Park) in Farol, Dili | 44.29 % |
| 554 | P2252 | Rehabilitation of DGHU office Building | 69.24 % |
| 555 | P2251 | Extention of DNAGP Kobe House in Caicoli (Rehabilitasaun Edificio DNAGP iha livro ) | 78.16 % |
| 556 | P2249 | Extention Of Cobe House Of The National Directorate Of Human Resourses (DNRH), MInistry Of Public Works (Re-Tender) | 21.78 % |
| 557 | P2246 | Konstrusaun Edificio Foun Centro Solidariedade Social Municipio Liquica | 59.68 % |
| 558 | P2245 | KONSTRUSAUN EDIFICIO FOUN IDA MINISTERIU ENSINU SUPERIOR, SIENSIA NO KULTURA ( MESCC) | 65.90 % |
| 559 | P2237 | Nova Construção de Dormitorio Autoridade Aduaneiro em Compund PIF Salele Municipio Covalima | 18.17 % |
| 560 | P2236 | Enhancement of Project - Management Information System (PMIS) - 2022 | 52.12 % |
| 561 | P2235 | Rural Road Rehabilitation Hatubuilico - Santuario Nain Feto Ramelau Chainage 0+000 - 2+450 Ainaro Municipality | 100.00 % |
| 562 | P2233 | R4D Road Rehabilitation : Holarua - Tirilolo Liga - Fallitehu Roads Chainage 0+000 - 3+000 km, Manufahi Municipality | 33.51 % |
| 563 | P2231 | R4D Rural Roads Rehabilitasaun Estrada Rural Dato - Liquica Package I Sta. 0+000-2+500, Liquica Municipality | 100.00 % |
| 564 | P2229 | Rural Road Rehabilitation : Samalete - Taraco Chainage 0+000 - 3+000, Ermera Municipality | 100.00 % |
| 565 | P2227 | R4D Rural Roads Rehabilitation Tilomar Border Chainage 0+000-3+000 Municipio Covalima | 100.00 % |
| 566 | P2226 | Rehabilitasaun Estrada Rural, Natardik - Dato Tolu Roads Chainage 3+000 - 6+000 Municipio Covalima | 100.00 % |
| 567 | P2225 | Rehabilittasaun Estrada Rural Balibo - Sanirin - Leolima - Mandoki, Package I Chainage 3+000 - 7+000, Suco Sanirin, Posto Adm. Balibo & Atabae, Municipio Bobonaro | 55.00 % |
| 568 | P2222 | Preparation for Detail Engenering Design for Dili Urban Road, Retender | 91.33 % |
| 569 | P2218 | R4D Rural Road Rehabilitation: Baguia - Lacoliu - Letemumu - Lelalai - Abuir Chainage 0+000 - 2+000 Baucau Municipality | 100.00 % |
| 570 | P2217 | R4D Rural Road Rehabilitation : Bercoli - Behamori Chainage 4+000 - 6+000, Baucau Municipality | 29.70 % |
| 571 | P2180 | Manutensaun Rutina Estradas Rural, Libaloa - Fahilebo Chainage 0+000 - 7+000 | 0.00 % |
| 572 | P2171 | Rural Road Spot Improvement Maumeta-Metagou-Bazartete Chainage 0+000 - 10+000, Liquica Municipality | 100.00 % |
| 573 | P2168 | Manutensaun Rutina Estradas Rural, Dasidara – Liquidiga Chainage 0+000 – 10+500 | 0.00 % |
| 574 | P2167 | Manutensaun Periodic Estradas Rural, Luro - Kotamutu - Lakawa Chainage 0+000 - 6+600 | 0.00 % |
| 575 | P2166 | Manutensaun Rutina Estradas Rural, Luro – Barikafa Chainage 0+000 – 7+000 | 0.00 % |
| 576 | P2142 | Manutensaun Rutina Estradas Rural, Bobonaro - Sibuni Chainage 1+700 - 3+700 | 0.00 % |
| 577 | P2138 | R4D Rural Road Routine Maintenance Lookeu Chainage 0+000 - 6+000 Casabauc 008 Chainage 0+000-3+000 0+000 Casabauc 012 Chaianage 0+000-3+500, Casabauc 018 Chainage 0+000 - 2+700, Lalawa Chainage 0+000 - 3+500 Naguidal,-Lepo Chainage 0+000 - 4+000 Boraikun-Mape Chainage 0+000-8+000 Lepo-Lour Chainage 0+000-3+000 | 100.00 % |
| 578 | P2135 | R4D Rural Roads Spot Improvement Odomau Chainage 0+000 - 1+400 | 100.00 % |
| 579 | P2132 | R4D Rual Road Rehabilitation : Baguia- Lacoliu-Letemumu-Lelalai-Abulir Chainage 2+000- 4+000, Baucau Municipality | 62.33 % |
| 580 | P2113 | Fornecimento De Autdoor Drinking Water For Pir - Batugade Municipality Bobonaro | 100.00 % |
| 581 | P2110 | Calamidade Cyclone Seroja 04 April 2021, 'Konstrusaun Cek Dam no Moru Protesaun Mota Ulun Manleu' Aldeia Mane Mesak, Suco Manleuana - Municipio Dili | 100.00 % |
| 582 | P2109 | Construção Moru Proteção, Recoperação Danos Estrutura Proteção Ribeira Benamauk, Becora | 100.00 % |
| 583 | P2107 | R4D Rural Road Spot Improvement Fahisoi- Dairlouta Chainage 0+000 - 5+000 Aileu Municipality | 99.62 % |
| 584 | P2106 | Road Maintenance Project - Zumalai (Covalima) to Jct Cassa Ainaro and Hatu-Udo Sta 0+100 - 12+810 | 100.00 % |
| 585 | P2104 | R4D Rural Road Spot Improvement Fahisohi - Fadabloko Chainage 0+000 - 9+000 and Spot Improvement Hautoho - Liquica Chainage 0+000 - 2+500 | 100.00 % |
| 586 | P2103 | R4D Rural Road Spot Improvement Kirlelo - Laclo Chainage 0+000 - 11+300, Aileu Municipality | 100.00 % |
| 587 | P2102 | R4D Rural Road Spot Improvement Daisoli- Fatubosa Chainage 0+000 - 7+300 | 100.00 % |
| 588 | P2090 | Manutensaun Periodika Estradas Rural, Lepo - Lour Chainage 0+000 - 3+000, Municipio Covalima | 100.00 % |
| 589 | P2089 | Manutensaun Periodika Estradas Rural, Boraikun - Mape Chainage 0+000 - 8+000, Municipality Covalima | 98.86 % |
| 590 | P2088 | Manutensaun Periodika Estradas Rural, Naguidal - Lour Chainage 0+000 - 4+000 | 100.00 % |
| 591 | P2085 | Manutensaun Periodika Estradas Rural, Casabau 012 Chainage 0+000 - 3+500, Municipio Covalima | 100.00 % |
| 592 | P2084 | Manutensaun Periodika Estradas Rural, Casabauc 008 Chainage 0+000 - 3+000 | 80.95 % |
| 593 | P2083 | Manutensaun Periodika Estrada Rural: Lookeu Chainage 0+000 - 6+000, Municipiu Covalima | 100.00 % |
| 594 | P2057 | Rural Road Maintenance and Rehabilitation of Maubise - Urlepha (Access to Edi Manelobas) Chainage 0+000 - 3+000 and Urlepha-Rita Chainage 0+000 - 2+150 | 80.95 % |
| 595 | P2051 | Roads Maintenance Section : Benamauk- Hera (A01), Halilaran Laulara (A02), Dili Municipality | 40.00 % |
| 596 | P2041 | Konstrusaun ka Rehabilitasaun ba EBF Bahadik | 79.02 % |
| 597 | P2040 | Novo construção UPF Mota Masin, Covalima | 57.58 % |
| 598 | P2039 | Project Improving EX. Building Quarentena At Compaund Customs Batugade | 77.89 % |
| 599 | P2037 | Pedestrian Shelters posto Integrado fronteira Batugade | 59.80 % |
| 600 | P2036 | Improving Partition Glass Room at Integrated Border Post Batugade MoF | 79.16 % |
| 601 | P2035 | Mini Construction of Refectory Room in Integrated Border Post Salele | 100.00 % |
| 602 | P2034 | Construction of Mini Office Customs Maliana at Tunubibi Bobonaro District | 92.90 % |
| 603 | P2032 | New construction Dormitory for Facility Manager at Border Post Batugade | 100.00 % |
| 604 | P2031 | Konstrusaun Centro tratamento oleo foer iha Betano Municipio Manufahi | 0.00 % |
| 605 | P2028 | New Construction of Path Way Hospital Referal Maliana Bobonaro, Timor Leste | 100.00 % |
| 606 | P2027 | Details Engineering Design (DED) for Design services for New Building Of The F-Fdtl's Official And Sergeant Barrack At Navy Component Hera, Dili Municipality | 78.08 % |
| 607 | P2026 | Details Engineering Design (Ded) For Detailded Engineering Design Services For New Building Of The F-Fdtl's Officials And Sergeant Barrack At Cft Metinaro, Dili Municipality | 62.46 % |
| 608 | P2025 | R4D Rural Road Rehabilitation Odel-gomo, 0+000-2+710 | 40.00 % |
| 609 | P2020 | Road Maintenance Section : Urban Road Suai Town 2021, Covalima Municipality | 100.00 % |
| 610 | P2019 | Roads Maintenance Section : Urban Road Maintenance Suai (45 KM) Periodic Maintenance Suai Vila (Tribunal and DIO Office) Covalima Municipality | 62.46 % |
| 611 | P2018 | Supply and Installation Connection for Isolation and Laboratorium Building Maumeta Liquica | 92.47 % |
| 612 | P2012 | Construction of supporting for DTMB-A Demostration Project LOT 3: Fleixa, Aituto Ainaro Municipality | 85.05 % |
| 613 | P2011 | Construction of supporting for DTMB-A Demostration Project LOT 2: Tapo, Bobonaro Municipality | 47.80 % |
| 614 | P2009 | Construction of supporting for DTMB-A demostration project LOT 1: Lalenu,Maina II,Lautem Municipality | 97.60 % |
| 615 | P2008 | Konstrusaun ka reabilitasaun ba Escola EBF Ferik Katuas | 90.86 % |
| 616 | P2006 | Konstrusaun Koby House foun edificio Unidade Aprovisionamento Desentralizadu-Ministerio Administrasaun Estatal | 57.34 % |
| 617 | P2005 | New Construction of Fence Around for Isolation COVID-19 in Liquica Maumeta, Ministerio da Saude Timor Leste | 68.06 % |
| 618 | P1997 | Details Engineering Design of New Construction National Center Archive for Centro Nacional Chega | 100.00 % |
| 619 | P1992 | Konstrusaun Edificio, Armagem no Landscaping CSSM Lautem | 72.15 % |
| 620 | P1973 | New Cosntruction Office CSS Aileu District | 100.00 % |
| 621 | P1972 | New Construction Office , Ware house and landscaping of Ainaro District | 100.00 % |
| 622 | P1971 | New Construction Office , Warehouse and landscaping of viqueque District | 100.00 % |
| 623 | P1969 | Consulting Services For Dili Urban Master Plan Update For the Municipality of Dili | 98.10 % |
| 624 | P1967 | Konstrusaun foun Escola Secundaria Tecnica vocasional Ravina Lacluta | 100.00 % |
| 625 | P1966 | Konstrusaun foun escola secundaria geral 4 Setembro, viqueque | 100.00 % |
| 626 | P1965 | Konstrusaun foun ESG Daraloi-Iraler, uatolari-Viqueque | 7.42 % |
| 627 | P1959 | Konstrusaun Edificio Posto Administrativo Maliana | 0.00 % |
| 628 | P1954 | New Construction Of Acute Care Laclubar - Municipio Manatuto | 80.10 % |
| 629 | P1953 | Konstrusaun foun ba EBC Vasco da Gama-Manatuto | 100.00 % |
| 630 | P1953 | Konstrusaun foun ba EBC Vasco da Gama-Manatuto | 96.63 % |
| 631 | P1951 | New Construction of Faculdade de Educasaun Arte e Humanidade ( 3 pisos, Area 1350 m2) | 47.67 % |
| 632 | P1949 | Konstrusaun Foun ba ESTV Laico Lospalos Municipio Lautem | 99.17 % |
| 633 | P1945 | Projecto Rehabilitasaun Escola Tekniku Vocasional (ESTV ) Becora | 96.72 % |
| 634 | P1944 | Konstrusaun Foun ESG Publika 05 de Maio Dili | 63.91 % |
| 635 | P1941 | Konstrusaun foun ba EBF Fatuhada | 77.40 % |
| 636 | P1940 | Supply and Installation new LV line and main Connection to all building in CHC Aileu, MoH, Timor Leste | 10.00 % |
| 637 | P1939 | Projecto Konstrusaun foun ba ESTV Atabae-Bobonaro | 97.59 % |
| 638 | P1938 | Supply and Installation New LV line & Main Connection to Isolation Building In Luak Manufahi | 97.49 % |
| 639 | P1937 | Konstrusaun foun ba ESTV Aileu-Aissirimou | 100.00 % |
| 640 | P1936 | Reabilitacao da Residencia do Juiz e Muro de Vedacao | 100.00 % |
| 641 | P1933 | Projetar a planta de Construção e Edifícios do Tribunal Distritais em Protótipo (Baucau, Suai, Maliana, Ermera, Viqueque e RAEOA) | 80.60 % |
| 642 | P1925 | Projetu Konstrusaun Foun no Rehabilitasaun ba ESTV Mota Bandeira Malabe Atsabe-Ermera | 1.25 % |
| 643 | P1924 | Projetu konstrusaun Foun no Rehabilitasaun ba ESTV Cavo Martinho Ermera | 64.10 % |
| 644 | P1923 | Projetu Konstrusaun Foun ESG Publico Cesar Maulaka, Ermera | 100.00 % |
| 645 | P1921 | Emergency Project, Cyclone Seroja 04 Abril 2021 New Plan Drainage Marconi, Sta 0+000 to 0+167. 03, Fatuhada, Municipio Dili | 96.39 % |
| 646 | P1919 | Emergency Project, Cyclone Seroja 04 Abril 2021 River Training Ailok Laran Hera 'Spur or Groynes & Retaining Wall' Package 2 (Sta 0+000 to Sta 0+140), Hera, Municipality of Dili, Timor Leste | 62.96 % |
| 647 | P1917 | Supervisão Para Construção do Jardim Chama Eterna | 71.75 % |
| 648 | P1913 | Projetu Konstrusaun Foun ba ESTV Hatu-Udo, Ainaro | 91.00 % |
| 649 | P1912 | Konstrusaun ka Rehabilitasaun ba Escola EBF Tatiri Lases | 100.00 % |
| 650 | P1911 | Konstrusaun ka Rehabilitasaun ba Escola EBF Hut-Seo | 100.00 % |
| 651 | P1910 | Konstrusaun ka Rehabilitasaun ba Escola EBF Lumululi | 89.29 % |
| 652 | P1909 | Konstrusaun ka Rehabilitasaun ba Escola EBF Russulau | 96.53 % |
| 653 | P1908 | Konstrusaun ka Rehabilitasaun ba Escola EBF Menetu | 79.86 % |
| 654 | P1907 | Konstrusaun ka Rehabilitasaun ba Escola ESG Fernando Lasama | 100.00 % |
| 655 | P1906 | Konstrusaun ka Rehabilitasaun ba Escola EBC Hato-Udo Vila | 100.00 % |
| 656 | P1905 | Konstrusaun ka Rehabilitasaun ba Escola EBF Betulala | 82.50 % |
| 657 | P1904 | Konstrusaun ka Rehabilitasaun ba Escola EBF Ernaro | 100.00 % |
| 658 | P1903 | Konstrusaun ka Rehabilitasaun ba Escola EBF Lias | 100.00 % |
| 659 | P1902 | Konstrusaun ka Rehabilitasaun ba Escola EBF Fatumeta | 70.24 % |
| 660 | P1901 | Konstrusaun ka Rehabilitasaun ba Escola EPE Beremoli Maulau | 88.34 % |
| 661 | P1900 | Konstrusaun ka Rehabilitasaun ba Escola EBF Tucaro | 100.00 % |
| 662 | P1899 | Konstrusaun ka Rehabilitasaun ba Escola EBF Rileco | 100.00 % |
| 663 | P1898 | Konstrusaun ka Rehabilitasaun ba Escola EBF Luan Cadoi | 78.68 % |
| 664 | P1897 | Konstrusaun ka Rehabilitasaun ba Escola EBF Manelobas | 83.83 % |
| 665 | P1896 | Konstrusaun ka Rehabilitasaun ba Escola EBC Fatumea | 100.00 % |
| 666 | P1895 | Projetu Konstrusaun Foun ba ESTV Akar Laran | 95.66 % |
| 667 | P1894 | Konstrusaun ka Rehabilitasaun ba Escola ESTV Nutetu de Fohorem | 100.00 % |
| 668 | P1893 | Konstrusaun ka Rehabilitasaun ba Escola ESGP Suai | 100.00 % |
| 669 | P1892 | Konstrusaun ka Rehabilitasaun ba Escola EPE Akar Laran | 100.00 % |
| 670 | P1891 | Konstrusaun ka Rehabilitasaun ba Escola EPE Busacucun | 100.00 % |
| 671 | P1890 | Konstrusaun ka Rehabilitasaun ba Escola EBF Macocon | 100.00 % |
| 672 | P1889 | Konstrusaun ka Rehabilitasaun ba Escola EBF Soiliga | 100.00 % |
| 673 | P1888 | Konstrusaun ka Rehabilitasaun ba Escola EBF Traducama | 100.00 % |
| 674 | P1887 | Konstrusaun ka Rehabilitasaun ba Escola EBF Maucola | 100.00 % |
| 675 | P1886 | Konstrusaun ka Rehabilitasaun ba Escola EBF Salasa | 100.00 % |
| 676 | P1885 | Konstrusaun ka Rehabilitasaun ba Escola EBF Uce-Cai | 100.00 % |
| 677 | P1884 | Konstrusaun ka Rehabilitasaun ba Escola EBF Holbolu | 100.00 % |
| 678 | P1883 | Konstrusaun ka Rehabilitasaun ba Escola EBF Has-Ain | 100.00 % |
| 679 | P1882 | Konstrusaun ka Rehabilitasaun ba Escola EBF 1,2 Aitos | 100.00 % |
| 680 | P1881 | Konstrusaun ka Rehabilitasaun ba Escola EBF Laen Tolu | 100.00 % |
| 681 | P1880 | Konstrusaun ka Rehabilitasaun ba Escola EBC Zumalai | 100.00 % |
| 682 | P1879 | Supply, instatallation, configuration,testing, commissioning of it equipments,Drones,GNSS and permanent estabilishment of GNSS Station at eight Municipalities in Timor Leste Under ministry of planing & territory | 76.04 % |
| 683 | P1878 | Konstrusaun ka rehabilitasaun ba EBF Dona Ana Lemos | 91.30 % |
| 684 | P1877 | Konstrusaun ka rehabilitasaun ba EPE Raeraga | 92.63 % |
| 685 | P1876 | Konstrusaun ka rehabilitasaun ba EBF Hatuleta | 92.58 % |
| 686 | P1875 | Konstrusaun ka Rehabilitasaun ba EBF Ussuvasu | 96.56 % |
| 687 | P1874 | Konstrusaun k Rehabilitasaun ba ESG Fernando Lasama de Luro | 93.62 % |
| 688 | P1873 | Rehabilitasaun ba ESG Lere Anan Timur Lospalos iha Aldeia Kuluhun Suco Fuiluro Postu Administrativu Lospalos Munisipiu Lautem | 100.00 % |
| 689 | P1872 | Konstrusaun ka Rehabilitasaun ba EBF Tasi Ibun Lautem | 96.65 % |
| 690 | P1871 | Konstrusaun ka Rehabilitasaun ba EPE Mehara | 96.07 % |
| 691 | P1870 | Rehabilitasaun ba EBC Mehara iha Aldeia Loiquero Suco Mehara Postu Administrativu Tutuala Munisipiu Lautem | 91.46 % |
| 692 | P1869 | Rehabilitasaun ba EBC Luro iha Aldeia Amaira Suco Luro Postu Administrativu Luro Munisipiu Lautem | 97.37 % |
| 693 | P1868 | Rehabilitasaun ba EBC de Iliomar iha Aldeia Ara- ara Suco Iliomar I Postu Administrativu Iliomar Munisipiu Lautem | 100.00 % |
| 694 | P1867 | konstrusaun ka Rehabilitasaun ba EBF 1,2 Euquisi | 94.95 % |
| 695 | P1866 | Konstrusaun ka Rehabilitasaun ba EBF 1,2 Tirilolo | 94.98 % |
| 696 | P1865 | Konstrusaun ka Rehabilitasaun ba EBF 1,2 Barikafa | 100.00 % |
| 697 | P1864 | Rehabilitasaun ba Pre Escolar Amaira Luro iha Aldeia Amaira Suco Luro Postu Administrativu Luro Munisipiu Lautem | 93.43 % |
| 698 | P1863 | Kontrusaun ka Rehabilitasaun ba Pre Escolar Ira - Ara | 97.31 % |
| 699 | P1862 | Konstrusaun ka Rehabilitasaun ba EBF Abere | 90.32 % |
| 700 | P1861 | kontrusaun ka Rehabilitasaun ba EBF No-2 Lospalos | 97.53 % |
| 701 | P1860 | Rehabilitasaun ba EBF 1,2 Ta - Besi Fera Naben - Fuat iha Aldeia Acadiliro Suco Fuat Postu Administrativu Iliomar Munisipiu Lautem | 100.00 % |
| 702 | P1855 | Rehabilitasaun ba ESG de Baguia iha Aldeia Neolidae Suco Alua Kraik Postu Administrativu Baguia Munisipiu Baucau | 72.05 % |
| 703 | P1854 | Rehabilitasaun ba EBF Uaidora Ossolia iha Aldeia Ossolia Suco Letemumu Postu Administrativu Quelicai Munisipiu Baucau | 75.77 % |
| 704 | P1853 | Rehabilitasaun ba EBC Buaua Lavateri iha Aldeia Fanalolo Suco Lavateri Postu Administrativu Baguia Munisipiu | 100.00 % |
| 705 | P1852 | Konstrusaun ka Rehabilitasaun ba ESG 01 | 100.00 % |
| 706 | P1851 | Konstrusaun ka Rehabilitasaun ba EBF Mauro Darala | 100.00 % |
| 707 | P1850 | Rehabilitasaun ba EBC Ossu - HUna iha Aldeia Uaicade Suco Ossu - Huna Postu Administrativu Baguia Munisipiu Baucau | 93.08 % |
| 708 | P1849 | Konstrusaun ka Rehabilitasaun ba EPE Lari - Sula | 63.63 % |
| 709 | P1848 | Rehabilitasaun ba EPE Fini Baguia ih Aldeia Neolidae Suco Alaua Craic Postu Administrativu Baguia Munisipiu Baucau | 94.90 % |
| 710 | P1847 | Konstrusaun ka Rehabilitasaun ba EPE Publico Amizade Venilale | 100.00 % |
| 711 | P1846 | Rehabilitasaun ba EBF Uacala iha Aldeia Uacala Suco Uacala Postu Administrativu Baguia Munisipiu Baucau | 94.80 % |
| 712 | P1845 | Rehabilitasaun ba EBC Ossu - Ufulari iha Aldeia Ossu - Ufulari Suco Samalari Postu Administrativu Baguia Munisipiu Baucau | 76.92 % |
| 713 | P1844 | Rehabilitasaun ba EBF Catolica Darenafa iha Aldeia Siri - Laco/Loi - Rae Suco Namanei Postu Administrativu Quelecai Munisipiu Baucau | 50.27 % |
| 714 | P1843 | Rehabilitasaun ba EBF Caibada Macassae iha Aldeia Caiobilale Suco Caibada Postu Administrativu Baucau Villa Munisipiu Baucau | 100.00 % |
| 715 | P1842 | Rehabilitasaun ka rehabilitasaun ESG Filial Kilik Waiga'e | 100.00 % |
| 716 | P1841 | Rehabilitasaun ba EBF Culina - Ossu - Uailale, Ossu - Uaque iha Aldeia Osso - Uaque Suco Fatulia Postu Administrativu Venilale Munisipiu Baucau | 100.00 % |
| 717 | P1840 | Rehabilitasaun ba EBF Fitun Sagadate - Laga iha Aldeia Samagata Suco Sagadate Postu Administrativu Laga Municipiu Baucau | 95.34 % |
| 718 | P1839 | Rehabilitasaun ba EPEC/ESTV Baucau iha Aldeia Samalaculiba Suco Buibau Postu Administarivu Baucau Villa Municipiu Baucau | 93.57 % |
| 719 | P1838 | Rehabilitasaun ba ESGPF Dom Carlos Filipe Ximenes Belo Afaca iha Aldeia Veco - Buti Suco Afaca Postu Administrativu Quelica Municipiu Baucau | 94.30 % |
| 720 | P1837 | Rehabilitasaun ba ESG 02 Vila Nova Baucau iha Aldeia Samalatu Liba Suco Buibau Postu Administrativu Baucau Villa Municipiu Baucau | 100.00 % |
| 721 | P1836 | Rehabilitasaun ba EBC Letemumo iha Aldeia Lebenei Suco Letemumo Postu Administrativu Quilecai Municipiu Baucau | 97.72 % |
| 722 | P1835 | Rehabilitasaun ba EBF Gulari iha Aldeia Daraloi de Baixo Suco Samalari Postu Administrativu Baguia Municipiu Baucau | 100.00 % |
| 723 | P1834 | Rehabilitasaun ba EBF Abo - Lir Laletek iha Aldeia Abor Lir Suco Abo Postu Administrativu Quelicai Municipiu Baucau | 89.12 % |
| 724 | P1833 | Rehabilitasaun ba EBC Uai - Bua iha Aldeia Uato - Hassa Suco Uatuhaco Postu Administrativu Venilale Municipiu Baucau | 100.00 % |
| 725 | P1832 | Konstrusaun ka Rehabilitasaun ba EBF Zona Golgota | 100.00 % |
| 726 | P1831 | Rehabilitasaun ba EBF 1 no 2 ciclo Libagua iha Aldeia Libagua Suco Libagua Posto Administrativu Laga Municipiu Baucau | 100.00 % |
| 727 | P1830 | Rehabilitasaun ba EBF Maucale iha Aldeia Maucale Suco Gariuai Posto Administrativo Baucau Villa Municipiu Baucau | 100.00 % |
| 728 | P1829 | Konstrusaun ka Rehabilitasaun ba EBF Fatubessi | 100.00 % |
| 729 | P1828 | Konstrusaun ka Rehabilitasaun ba ESGAM Aileu | 100.00 % |
| 730 | P1827 | Konstrusaun ka Rehabilitasaun ba EBF Manucasa | 100.00 % |
| 731 | P1826 | Konstrusaun ka Rehabilitasaun ba EBC Mau-Meta | 100.00 % |
| 732 | P1825 | Konstrusaun ka Rehabilitasaun ba EBF Darahe | 100.00 % |
| 733 | P1824 | Konstrusaun ka Rehabilitasaun ba EBF Fatubutik | 100.00 % |
| 734 | P1823 | Konstrusaun ka Rehabilitasaun ba EBF Teblor | 100.00 % |
| 735 | P1822 | Konstrusaun ka Rehabilitasaun ba EBF Urbadan | 100.00 % |
| 736 | P1821 | Konstrusaun ka Rehabilitasaun ba Pre-Escolar Cotobauro | 100.00 % |
| 737 | P1820 | Konstrusaun ka rehabilitasaun ba EBF Laclo, Aileu | 100.00 % |
| 738 | P1819 | Konstrusaun ka rehabilitasaun ba ESG Dom Tomas | 100.00 % |
| 739 | P1818 | Konstrusaun ka rehabilitasaun ba EPE Mantane | 100.00 % |
| 740 | P1817 | Konstrusaun ka rehabilitasaun ba EBC 3 Ciclo Seloi | 100.00 % |
| 741 | P1816 | Projetu Konstrusaun Foun ba ESTV Hera | 71.55 % |
| 742 | P1815 | Projetu Konstrusaun Foun no Rehabilitasaun ba EBC Sergio Viera de Melo Becora, Dili | 86.76 % |
| 743 | P1814 | Projetu Rehabilitasaun Ensinu Sekundariu Tekniku Vokasional Soibada, Manatuto | 100.00 % |
| 744 | P1813 | Projetu Konstrusaun Foun ESTV Lospalos | 100.00 % |
| 745 | P1811 | Konstrusaun ka Rehabilitasaun ba EBF Obrato | 85.21 % |
| 746 | P1810 | Konstrusaun ka Rehabilitasaun ba EP Cairui | 81.02 % |
| 747 | P1809 | Konstrusaun ka Rehabilitasaun ba PE Rembor | 80.97 % |
| 748 | P1808 | Konstrusaun ka Rehabilitasaun ba EBF Rentau | 88.77 % |
| 749 | P1807 | Konstrusaun ka Rehabilitasaun ba EBC Weaihudik | 85.75 % |
| 750 | P1806 | Konstrusaun ka Rehabilitasaun ba ESG Kay Rala | 88.66 % |
| 751 | P1805 | Konstrusaun ka Rehabilitasaun ba EBC Remanarun | 90.38 % |
| 752 | P1804 | Konstrusaun ka Rehabilitasaun ba EBF Aisiu-Um | 92.32 % |
| 753 | P1803 | Konstrusaun ka Rehabilitasaun ba EBF Batara | 92.00 % |
| 754 | P1802 | Konstrusaun ka Rehabilitasaun ba EBF Liaruca | 100.00 % |
| 755 | P1801 | Konstrusaun ka Rehabilitasaun ba EBF Edemumo | 100.00 % |
| 756 | P1800 | Konstrusaun ka Rehabilitasaun ba EBC 07 Uatolari | 100.00 % |
| 757 | P1799 | Konstrusaun ka Rehabilitasaun ba EBF Nahae | 100.00 % |
| 758 | P1798 | Konstrusaun ka Rehabilitasaun ba ESG Calixa Viqueque | 100.00 % |
| 759 | P1797 | Konstrusaun ka Rehabilitasaun ba EBF 1,2 Uaibobo | 100.00 % |
| 760 | P1796 | Konstrusaun ka Rehabilitasaun ba EBF Ular Rihik Kraras | 100.00 % |
| 761 | P1795 | Konstrusaun ka Rehabilitasaun ba EPE Maria Lobato | 100.00 % |
| 762 | P1794 | Konstrusaun ka Rehabilitasaun ba EPE Uaibua/Ossu | 100.00 % |
| 763 | P1793 | Konstrusaun ka Rehabilitasaun ba EPE Sebastiao Gomes | 100.00 % |
| 764 | P1792 | Konstrusaun ka Rehabilitasaun ba EBC Cabira-Oan | 100.00 % |
| 765 | P1791 | Konstrusaun ka Rehabilitasaun ba EBF Uaibira | 100.00 % |
| 766 | P1790 | Konstrusaun ka Rehabilitasaun ba ESG Olokassa Ossu | 100.00 % |
| 767 | P1789 | Konstrusaun ka Rehabilitasaun ba EBF Ualaque | 100.00 % |
| 768 | P1788 | Konstrusaun ka Rehabilitasaun ba ESTV Kalo-Heda Uatolari | 100.00 % |
| 769 | P1787 | Konstrusaun ka Rehabilitasaun ba EBC 2,3 Uatocarbau Nunu Uata | 100.00 % |
| 770 | P1786 | Konstrusaun ka Rehabilitasaun ba ESG Uatocarbau | 100.00 % |
| 771 | P1785 | Konstrusaun ka Rehabilitasaun ba EBF 1,2 Debuisi | 100.00 % |
| 772 | P1784 | Konstrusaun ka Reabilitasaun ba ESG 20 de Setembro Metinaro | 65.28 % |
| 773 | P1783 | Konstrusaun ka Reabilitasaun ba EBF Bebonuk | 89.89 % |
| 774 | P1782 | Konstrusaun ka Reabilitasaun ba EBF Lelaus Dare | 94.05 % |
| 775 | P1781 | Konstrusaun ka Reabilitasaun ba EBC Bidau Akadiru-Hun | 93.56 % |
| 776 | P1780 | Konstrusaun ka Reabilitasaun ba EPE Buras Kadalak | 92.09 % |
| 777 | P1779 | Konstrusaun ka Reabilitasaun ba EBF Duque de Caxias | 98.76 % |
| 778 | P1778 | Konstrusaun ka Reabilitasaun ba EBC Biqueli | 91.49 % |
| 779 | P1777 | Konstrusaun ka Reabilitasaun ba EBF Naroman | 75.49 % |
| 780 | P1776 | Konstrusaun ka Reabilitasaun ba EBF Benunuk Metinaro | 72.15 % |
| 781 | P1775 | Konstrusaun ka Reabilitasaun ba EPE Ai-Loktuto | 96.07 % |
| 782 | P1774 | Konstrusaun ka Reabilitasaun ba EBC 30 de Agosto | 43.56 % |
| 783 | P1773 | Konstrusaun ka Reabilitasaun ba EBC 10 de Dezembro | 53.32 % |
| 784 | P1772 | Konstrusaun ka Reabilitasaun ba ESG FINANTIL | 54.31 % |
| 785 | P1771 | Konstrusaun ka Reabilitasaun ba ESG 12 de Novembro Becora | 73.36 % |
| 786 | P1770 | Konstrusaun ka Reabilitasaun ba ESG 10 de Dezembro Comoro - Dili | 42.41 % |
| 787 | P1769 | Konstrusaun ka Reabilitasaun ESTV 28 de Novembro Becora | 51.30 % |
| 788 | P1768 | Konstrusaun ka Reabilitasaun ba EBF 1,2 Luculai | 100.00 % |
| 789 | P1767 | Konstrusaun ka Reabilitasaun ba ESG-Paralelo Bogoro | 91.40 % |
| 790 | P1766 | Konstrusaun ka Reabilitasaun ba ESG-Paralelo Maubara/Batuvou | 91.00 % |
| 791 | P1765 | Konstrusaun ka Reabilitasaun ba EBF 1,2 Tolema | 94.24 % |
| 792 | P1764 | Konstrusaun ka Reabilitasaun ba EBF 1,2 Laclolema | 91.00 % |
| 793 | P1763 | Konstrusaun ka Reabilitasaun ba EPE Loidahar | 90.24 % |
| 794 | P1762 | Konstrusaun ka Reabilitasaun ba EBF Tapo Manuhulu | 92.63 % |
| 795 | P1761 | Konstrusaun ka Reabilitasaun ba EBC 1,2,3 Liquica | 89.72 % |
| 796 | P1760 | Konstrusaun ka Reabilitasaun ba EBF Mauboque | 92.70 % |
| 797 | P1759 | Konstrusaun ka Reabilitasaun ba EBF Gariana | 89.60 % |
| 798 | P1758 | Konstrusaun ka Reabilitasaun ba EPE Cassait | 91.41 % |
| 799 | P1757 | Konstrusaun ka Reabilitasaun ba EPE Ermeta | 90.00 % |
| 800 | P1756 | Konstrusaun ka Reabilitasaun ba EPE Baura | 100.00 % |
| 801 | P1755 | Emergency Project Atabae Bridge 'Regularization, Spur or Groynes & Retaining Wall' (Sta 0+000-Sta 0+540), Municipality of Bobonaro | 100.00 % |
| 802 | P1754 | Konstrusaun Rehabilitasaun ESTV-1038 YAMATO MALIBAKA | 100.00 % |
| 803 | P1753 | Konstrusaun ka reabilitasaun ba Escola EBF 12 de abril Marco | 90.62 % |
| 804 | P1752 | Konstrusaun ka reabilitasaun ba Escola EBF Rairobo | 91.42 % |
| 805 | P1751 | Konstrusaun ka reabilitasaun ba Escola EBF Halicou | 90.84 % |
| 806 | P1750 | Konstrusaun ka reabilitasaun ba Escola Pre Escolar Holsa | 92.95 % |
| 807 | P1749 | Konstrusaun ka reabilitasaun ba Escola Pre Escolar Ritabou | 92.79 % |
| 808 | P1748 | Konstrusaun ka reabilitasaun ba Eskritorio Professores ESG Dom Martinho Maliana | 93.28 % |
| 809 | P1747 | Konstrusaun ka reabilitasaun ba Escola EBC Hauba | 100.00 % |
| 810 | P1746 | Konstrusaun ka Reabilitasaun ba Escola EBF opa Vila | 100.00 % |
| 811 | P1745 | Konstrusaun ka reabilitasaun ba Escola EBF Molop Taz | 100.00 % |
| 812 | P1744 | Konstrusaun ka reabilitasaun ba Escola EBF Maliubu | 100.00 % |
| 813 | P1743 | Konstrusaun ka reabilitasaun ba Escola EBF Anapal | 100.00 % |
| 814 | P1742 | Konstrusaun ka reabilitasaun ba Escola EBF Carabau | 100.00 % |
| 815 | P1741 | Konstrusaun ka reabilitasaun ba Escola EBF Boloi | 87.28 % |
| 816 | P1740 | Konstrusaun ka reabilitasaun ba Escola EBF Oplegul | 91.14 % |
| 817 | P1739 | Konstrusaun ka reabilitasaun ba escola EBF Odelgomo | 100.00 % |
| 818 | P1738 | Konstrusaun ka reabilitasaun ba Escola Pre Escolar Atuaben | 100.00 % |
| 819 | P1737 | Konstrusaun ka reabilitasaun ba Escola EBF Mazop | 100.00 % |
| 820 | P1736 | Konstrusaun ka reabilitasaun ba Escola EBF Dilai | 100.00 % |
| 821 | P1735 | Konstrusaun ka reabilitasaun ba Escola EBF Cota Boot | 100.00 % |
| 822 | P1734 | Konstrusaun ka reabilitasaun ba Escola EBC Lucinda Gumer | 100.00 % |
| 823 | P1733 | Konstrusaun ka rehabilitasaun ba EBF Biasu | 90.11 % |
| 824 | P1732 | Konstrusaun ka rehabilitasaun ba EBF Sinlelo | 92.31 % |
| 825 | P1731 | Konstrusaun ka rehabilitasaun ba EBC Railaco Leten | 92.36 % |
| 826 | P1730 | Konstrusaun ka rehabilitasaun ba EBF Caitarahei | 93.32 % |
| 827 | P1729 | Konstrusaun ka rehabilitasaun ba EBF Hatete | 93.24 % |
| 828 | P1728 | Rehabilitasaun Eis Hospital Dr.Antonio de Carvalho | 74.54 % |
| 829 | P1727 | Konstrusaun ka rehabilitasaun ba EBF Nunutali | 92.11 % |
| 830 | P1726 | Konstrusaun ka rehabilitasaun ba EBC Mertuto | 91.00 % |
| 831 | P1725 | Konstrusaun ka rehabilitasaun ba EBC Tata | 75.09 % |
| 832 | P1724 | Konstrusaun ka rehabilitasaun ba EBF Leirema | 91.27 % |
| 833 | P1723 | Konstrusaun ka rehabilitasaun ba EBF Catrai Craic | 95.54 % |
| 834 | P1722 | Konstrusaun ka rehabilitasaun ba EBF Manulete | 94.18 % |
| 835 | P1721 | Konstrusaun ka rehabilitasaun ba ESGP Maucruma | 93.20 % |
| 836 | P1720 | Konstrusaun ka rehabilitasaun ba EBF Tidi Besi | 92.16 % |
| 837 | P1719 | Konstrusaun ka rehabilitasaun ba EBF Tocoluli | 92.33 % |
| 838 | P1718 | Konstrusaun ka rehabilitasaun ba EPE CAFE ERMERA | 88.36 % |
| 839 | P1717 | Konstrusaun ka rehabilitasaun ba ESTV Halibur Betano | 100.00 % |
| 840 | P1716 | Konstrusaun ka rehabilitasaun ba EBC simpang Tiga | 100.00 % |
| 841 | P1715 | Konstrusaun ka rehabilitasaun ba EBC Fatuco | 100.00 % |
| 842 | P1714 | Konstrusaun ka rehabilitasaun ba EBF Rotuto | 100.00 % |
| 843 | P1713 | Konstrusaun ka rehabilitasaun ba EBF Manus | 100.00 % |
| 844 | P1712 | Konstrusaun ka rehabilitasaun ba EBF Bercoban | 100.00 % |
| 845 | P1711 | Konstrusaun ka rehabilitasaun ba EBF Blaro | 100.00 % |
| 846 | P1710 | Konstrusaun ka rehabilitasaun ba EBF hatsana udo/Dai-sua Lama | 100.00 % |
| 847 | P1709 | Konstrusaun ka rehabilitasaun ba EBF Silihasan | 100.00 % |
| 848 | P1708 | Konstrusaun ka rehabilitasaun ba EPE DOmingos Savio Grotu | 100.00 % |
| 849 | P1707 | Konstrusaun ka rehabilitasaun ba EPE Turon | 100.00 % |
| 850 | P1706 | Konstrusaun ka rehabilitasaun ba EBC Diligencia | 100.00 % |
| 851 | P1705 | Konstrusaun ka rehabilitasaun ba EBF Tefo | 100.00 % |
| 852 | P1704 | Konstrusaun ka rehabilitasaun ba EBC Mahaquidan | 100.00 % |
| 853 | P1703 | Konstrusaun ka rehabilitasaun ba ESTV Francisco Borja da Costa | 100.00 % |
| 854 | P1702 | Rehabilitasaun ba EBF. Uai-Aca/Mulia iha Aldeia Uai-Aca/Mulia Suco Tame Postu Administrativu Quelicai Municipiu Baucau | 96.53 % |
| 855 | P1701 | Rehabilitasaun ba EBF. Lala - Bu'u iha Aldeia Sire - Bu'u Suco Sagadate Postu Administrativu Laga Municipiu Baucau | 77.01 % |
| 856 | P1700 | Rehabilitasaun ba EBF. Uada - Boru iha Aldeia Uada - Buro Suco Guruca Postu Administrativu Quelicai Municipiu Baucau | 66.41 % |
| 857 | P1699 | Konstrusaun foun ESTV Leorema -Liquica | 99.13 % |
| 858 | P1687 | Rehabilitation of the Rural road Ossu de Cima - Liaruka Chainage 4 + 000 - 6 + 000 | 0.00 % |
| 859 | P1686 | Rehabilitasaun Estrada Rural ,Ossu de Cima - Liaruca Chainage, Viqueque 2+000 - 4+000 | 85.20 % |
| 860 | P1683 | Rehabilitasaun Estrada Rural,Vila Maumeta-Maquili Chainage, Dili 3+000-6+000 | 77.80 % |
| 861 | P1680 | Rehabilitasaun Estrada Rural,Pala-Iliana Chainage, Dili 0+000-3+500 | 67.69 % |
| 862 | P1678 | Rehabilitasaun Estrada,Bebadiri - Lebokalako Chainage , Liquica 0+000 - 5+000 (5.0 Km) | 100.00 % |
| 863 | P1674 | Rehabilitasaun Estrada Rural,Cainilu - Larisula Lautem Chainage 8+750 - 11+050 | 78.15 % |
| 864 | P1673 | R4D Rural Road Rehabilitation of Cainliu - Larisula Chainage 2+700 - 5+400 Km, Lautem Municipality | 76.60 % |
| 865 | P1672 | R4D Rural Road Rehabilitation of Cainliu - Larisula Chainage 0+000 - 2+700 Km, Lautem Municipality | 89.40 % |
| 866 | P1671 | Rehabilitation of the Rural Road Fuiloro - Maupitine Chainage 4+000-7+000 Lautem Municipality | 100.00 % |
| 867 | P1670 | Rehabilitasaun Estrada Rural,Fuiloro - Maupitine Chainage 2+000 - 4+000 | 100.00 % |
| 868 | P1669 | Rehabilitation Of The Rural Road Fuiloro - Maupitine Chainage 0+000-2+000, Lautem Municipality | 91.98 % |
| 869 | P1668 | Rehabilitasaun Estrada Rural,Fuiloro - Home Chainage, Lautem 2+500-3+500 (1.0 Km) | 100.00 % |
| 870 | P1666 | Rehabilitasaun Estrada Rural,Catraileten - Fronteira Lauana Chainage, Ermera 0+000-2+000 (2.0 Km) | 100.00 % |
| 871 | P1665 | Rehabilitation of Rural Road Coliate-leotelo Chainage 0+000-2+000, Ermera Municipality | 100.00 % |
| 872 | P1664 | Rehabilitation of Rural Road Hatulia-Bilimau Chainage 0+000-2+000 | 56.99 % |
| 873 | P1663 | Rehabilitation of Rural Road LIhu - Samalete Chainage 0+000-13+800 Ermera Municipality | 100.00 % |
| 874 | P1660 | Rehabilitation of Rural Road Ponilala Chainage 3+200-5+200 Ermera Municipality | 100.00 % |
| 875 | P1659 | Rehabilitation of Rural Road Lequimea Chainage 0+000 - 2+100 Ermera Municipality | 100.00 % |
| 876 | P1658 | Rehabilitation Of Rural Road Manusahe Chainage 0+000-6+000, Ermera Municipality | 100.00 % |
| 877 | P1655 | Rural Road Rehabilitation of Lookeu Chainage 6+000-9+000 (3km), Covalima Municipality | 100.00 % |
| 878 | P1648 | R4D Rural Road Rehabilitation Of Atabae-Rairobo Road Package 3 Chainage 6+000-8+000 (2.0 KM), Bobonaro Municipality | 87.00 % |
| 879 | P1647 | R4D Rural Road Rehabilitation Of Atabae-Rairobo Road Package 2 Chainage 4+000-6+000 (2KM), Bobonaro Municipality | 100.00 % |
| 880 | P1646 | Rural Road Rehabilitation Of Atabae - Rairobo Road Package 1 Chainage 2+000-4+000 (2KM), Bobonaro Municipality | 85.00 % |
| 881 | P1644 | Rehabilitasaun Estrada Rural,Atudara-Dau Udo Chainage, Bobonaro 0+000-2+000 (2.0 Km) | 100.00 % |
| 882 | P1643 | R4D Rural Road Rehabilitation Atu Aben-Liat Laun (Marobo) Chainage 0+000 - 2+000 Bobonaro Municipality | 100.00 % |
| 883 | P1642 | Rehabilitasaun Estrada Rural,Atabae-Rairobo-Pasmaten, Bobonaro 0+000-2+000 (2.0 Km) | 75.00 % |
| 884 | P1640 | R4D Rural Road Rehabilitation GILDAPIL - LEBOS CAHINAGE 0+000 -3+000 Boboaro Municipality | 100.00 % |
| 885 | P1639 | Rehabilitasaun Estrada Rural,Molop Chainage, Bobonaro 0+000-2+000 (2.0 Km) | 100.00 % |
| 886 | P1638 | R4D Rural Road Rehabilitation Of Bobonaro - Sibuni Chainage 1+700-3+700 Bobonaro Municipality | 100.00 % |
| 887 | P1637 | R4D Rural Road Rehabilitation of Bobonaro- Fronteira- Aiasa Chainage 0+000-2+000 Bobonaro Municipality | 100.00 % |
| 888 | P1636 | R4D Rural Road Rehabilitation Of Bobonaro Sibuni Chainage 0+000 -1+700 Bobonaro Municipality | 34.39 % |
| 889 | P1635 | Rehabilitasaun Estrada Rural,Maliana-Saburai-Atus Chainage, Bobonaro 20+000-21+500 (1,5 Km) | 100.00 % |
| 890 | P1634 | R4D Rural Road Rehabilitation Genuali -Gololo Chainage, 7+000-8+500 Bobonaro Municipality | 90.00 % |
| 891 | P1633 | Rehabilitasaun Estrada Rural,Genuali -Gololo Chainage, Bobonaro 5+500-7+000 (1,5 Km) | 100.00 % |
| 892 | P1632 | Rehabilitasaun Estrada Rural,Genuali -Gololo Chainage, Bobonaro 4+000-5+500 (1,5 Km) | 100.00 % |
| 893 | P1629 | Supervision of the Construction of Maliana II Irrigation Project | 18.75 % |
| 894 | P1614 | Road Maintenance Section Ensul - Area Colmera, Catedral - Bairo Pite | 24.07 % |
| 895 | P1590 | R4D Rural Road Rehabilitation of Venilale - Uaioli Chainage 6+000 - 8+550 Baucau Municipality | 100.00 % |
| 896 | P1589 | R4D Rural Road Rehabilitation of Venilale - Uaioli Chainage 3+000 - 6+000 Baucau Municipality | 100.00 % |
| 897 | P1588 | Rehabilitasaun Estrada Rural,Venilale -Uaioli, Baucau Chainage 0+000 - 3+000 | 100.00 % |
| 898 | P1587 | Rural Road Rehabilitation Of Road Afaca-Uaitame Chainage 9+000-12+0000, Baucau Municipality | 36.47 % |
| 899 | P1586 | R4D Rural Road Rehabilitation of Afaca - Uaitame Chainage 6+000 - 9+000 Baucau Municipality | 82.11 % |
| 900 | P1585 | Rehabilitasaun Estrada Rural,Afaca-Uaitame Chainage 3+00 -6+000 Baucau | 74.12 % |
| 901 | P1584 | R4D Rural Road Rehabilitation of Afaca - Uaitame Chainage 0+000 -3+000 Baucau Maunicipality | 71.72 % |
| 902 | P1583 | Consultant Services to Supervise EPC Contractor for the Up-Gradation of Liquica 150/20kV Substation to Supply Power to Tibar Bay Port | 55.00 % |
| 903 | P1582 | Rehabilitation of The Rural Road Natarbora - Pualaka ( Mina Rai ) Chainage 0+000 - 2+000 ( 2 km ), Manatuto Municipality | 49.78 % |
| 904 | P1581 | Rehabilitasaun Estrada Rural ,Rembor Chainage, Manatuto 0+000-3+000 (3.0 Km | 85.00 % |
| 905 | P1578 | Rehabilitasaun estradas Rural, Hokraik kiik Chainage 2+600 - 4+750 , Munisipiu Ainaro, Postu administrativu Maubisse | 38.43 % |
| 906 | P1575 | Rural Road Rehabilitation of Foho AiLico-Foho Bobe Chainage 6+000-7+900, Ainaro Municipality | 100.00 % |
| 907 | P1574 | Rural Road Rehabilitation of Foho Ailico-Foho Bobe Chainage 3+500 - 6+000, Ainaro Municipality | 100.00 % |
| 908 | P1573 | Rural Road Rehabilitation of Foho Ai Lico - Foho Bobe Chainage 2+000-3+500, Ainaro Municipality | 97.75 % |
| 909 | P1572 | Rural Road Rehabilitation of Foho Ai Lico - Foho Bobe Chainage 0+000 - 2+000, Ainaro Municipality | 89.35 % |
| 910 | P1571 | Rehabilitasaun Estrada Rural,Raimansu - Fatubesi,Aileu (5.20Km) | 58.28 % |
| 911 | P1570 | Rehabilitation of the Rural Road Seloi Kraik - Halalmeta Chainage 0+000 - 3+500 ( 3.5 km ) Aileu Municipality | 92.40 % |
| 912 | P1569 | Rehabilitasaun Estrada Rural, Taliforleu-kolohoho (Loop around Lake) Chainage, Aileu 5+000-8+000 | 53.03 % |
| 913 | P1568 | Rehabilitasaun Estrada Rural,Taliforleu -kolohoho (Loop around Lake) Chainage, Aileu 2+000-5+000 | 55.05 % |
| 914 | P1567 | Rehabilitasaun Estrada Rural,Taliforleu -kolohoho (Loop around Lake) Chainage, Aileu 0+000-2+000 | 17.64 % |
| 915 | P1566 | Rural Road Rehabilitation of the Rural Road Aituhun - Manufoni Chainage 0+000 - 1+000 ( 1.0 km ), Aileu Municipality | 100.00 % |
| 916 | P1557 | Rehabilitasaun Estrada Nacional, Same Luak - Betano (A14), 10 Km | 0.00 % |
| 917 | P1527 | NEW CONSTRUCTION OF U.P.F BUILDING IN OECUSSE LOT 2:NEW CONSTRUCTION OF UPF BUILDING AT CITRANA | 41.55 % |
| 918 | P1526 | NEW CONSTRUCTION OF U.P.F BUILDING IN OECUSSE LOT 22:NEW CONSTRUCTION OF UPF BUILDING AT OESILO | 42.45 % |
| 919 | P1525 | New Construction of U.P.F Buiding,Oequsse, Sakato - Timor Leste | 31.36 % |
| 920 | P1523 | Construção de Barracas de Polícia de UPF de Tunubibi, Bobonaro | 39.77 % |
| 921 | P1522 | Novo construção UPF Mota Ain, Bobonaro | 45.89 % |
| 922 | P1515 | R4D Rural Road Spot Improvement Malaisera-Lissadila Chainage 0+000-4+800 | 100.00 % |
| 923 | P1514 | R4D Rural Road Spot Improvement Berlakuidu-Laberlaka Chainage 0+000-2+500 | 100.00 % |
| 924 | P1513 | R4D Rural Road Spot Improvement Metagou - Aibenu Chainage 0+000-7+600, Liquica Municipality | 100.00 % |
| 925 | P1511 | R4D Rural Road Spot Improvement Taltabi - Kutulau Chainage 0+000-1+700, Liquica Municipality | 100.00 % |
| 926 | P1505 | Removal and Installation of Panel Bridge in Becussi River, Suco Becora, Posto Adm. Cristo Rei - Municipio Dili | 34.54 % |
| 927 | P1499 | Road Rehabilitation of Municipal Roads Package Uatulari - Laisorulai Sta. 0+000 - 22+000(22 km) Viqueque Municipality | 15.75 % |
| 928 | P1498 | Construção de Barreira de Proteção no Esquema de Irrigação em Oebaba e Zona Agrícola Bonuk na Ribeira de Belulik, Município de Ainaro | 100.00 % |
| 929 | P1495 | Road Rehabilitation of Municipal Roads Laclo to Laclo Town Sta 0+000-18+500, LOT 2: Section II (JCT A02-Remexio 5.028 KM) | 59.89 % |
| 930 | P1493 | Rehabilitation of Municipal Roads Package 4 :Laga- Baguia Sta. 0+000 to Sta. 38+030 Baucau Municipality | 56.88 % |
| 931 | P1485 | New Construction of Gabion Protection in Fatuquero River, Suco Fatuquero, Posto Adm. Railaco, Maunicipio Ermera | 55.02 % |
| 932 | P1481 | Rehabilitation of Roads Maubisse - Turiscain Phase III | 65.10 % |
| 933 | P1479 | R4D Rural Road Spot Improvement Malaisera-Lissadila Chainage 4+800-9+600, Liquica Municipality | 100.00 % |
| 934 | P1476 | R4D Rural Road Spot Improvement Nunulete-Darulema Chainage 0+000-2+000, Liquica Municipality | 100.00 % |
| 935 | P1475 | Rehabilitasaun Estrada, Uma No Drainagem Iha Entrada Mota Ain Batugede | 100.00 % |
| 936 | P1474 | R4D Rural Road Spot Improvement Aibenu-Asumanu-Leurema Chainage 0+000-5+000, Liquica Municipality | 97.30 % |
| 937 | P1472 | R4D Rural Road Spot Improvement Aibenu - Asumanu - Leurema Chainage 5+000-10+000, Liquica Municipality | 100.00 % |
| 938 | P1470 | R4D Rural Road Spot Improvement Dato - Loidahar Chainage 0+000-12+300, Liquica Municipality | 100.00 % |
| 939 | P1469 | Feasibility study for New Construction of Industrial Park in Liquica, Timor Leste | 100.00 % |
| 940 | P1461 | Consulting Services For Detailhed Engineering Design ( DED ) National Incubation Centre | 91.03 % |
| 941 | P1460 | Consulting services for feasibility study for Timor-Leste Center of Excellence for Qualified Workforce (TL-CEQW) | 31.94 % |
| 942 | P1450 | New Construction of Outdoor Sport Facilities, at Taibessi, Dili - Timor Leste | 50.57 % |
| 943 | P1449 | R4D Rural Road Spot Improvement Barkau (Vaviquenia)-Maubaralisa Chainage 0+000-4+200 | 100.00 % |
| 944 | P1448 | New Construction of Gabion Box with Radom Fill in Area Weberek Posto Administrative Alas Municipality Manufahi | 100.00 % |
| 945 | P1447 | Additional Service Statement of Work for Year 2022 - Government Resource Planning Solutions & Supporting IT Infrastructure System Implementation & Support Agreement | 96.75 % |
| 946 | P1446 | R4D Rural Road Spot Improvement Fahilebo -Fatumasi Chainage 0+000-2+300 , Liquica Municipality | 100.00 % |
| 947 | P1445 | R4D Rural Road Spot Improvement Libaloa-Fahilebo Chainage 0+000-7+000, Liquica Municipality | 100.00 % |
| 948 | P1444 | R4D Rural Road Spot Improvement Fahilebo-Bucumera Chainage 0+000-3+000 | 100.00 % |
| 949 | P1443 | R4D Rural Road Spot Improvement Namalesu-Faturilau Chainage 0+000-14+000 | 59.06 % |
| 950 | P1442 | Extention Office of Legal and Judicial Training Centre | 61.18 % |
| 951 | P1441 | New Construction of interior fence for prison In Gleno | 95.81 % |
| 952 | P1440 | New Construction of Faculdade de Agricultura ( B-03) | 69.83 % |
| 953 | P1439 | New Construction of Faculdade de Agricultura ( B-02) | 75.08 % |
| 954 | P1438 | Construction of Faculdade de Agricultura Building ( B-01) | 100.00 % |
| 955 | P1437 | Design Edificio MACLN | 93.21 % |
| 956 | P1436 | New Construction of Entry Gate no Jardim de herois de Ainaro | 72.06 % |
| 957 | P1435 | New construction of Gapura Stairs and wall protection no jardim de herois de Viqueque | 82.76 % |
| 958 | P1434 | New construction of Tom,pavement and Gabion no jardim de Herois de Quelicai | 100.00 % |
| 959 | P1433 | New Construction of Camp and Leveling, pavement works no jardim de herois de laga Baucau | 93.21 % |
| 960 | P1429 | Projeitu Konstrusaun foun ESG publico 01 Liquica | 100.00 % |
| 961 | P1428 | Preparation of Detailed Engineering Design for (DED) for New Cable Stayed Bridge over iha Becusse River, in Dili, Total Length, +25M, Municipio Dili | 35.96 % |
| 962 | P1427 | Rehabilitasaun Edificio MPO | 100.00 % |
| 963 | P1419 | Rehabilitation Building ( G,I,J,K ) Hospital Trilolo | 86.28 % |
| 964 | P1418 | Emergency Project concrete retaining wall protection of Maloa River sta 0+000-0+100 | 100.00 % |
| 965 | P1417 | Contrato para fornecimento 'supply traffic signs (roads Marking ) for directorate of land transport' | 6.41 % |
| 966 | P1416 | New Construction Escola basica Filial Bucoli Municipio Baucau | 100.00 % |
| 967 | P1415 | R4D Rural Roads Periodic Maintenance: Aibeno-Asumanu-Leurema Chainage 0+000 - 10+000, Dato-Loidahar Chainage 0+000 - 12+300, Berlakuidu-Laberlaka Chainage 0+000 - 5+400 | 100.00 % |
| 968 | P1407 | Projecto Rehabilitasaun estrada urbana , Ponte Hali laran/Ponte My friend/Ponte Kuluhun ( Sta 0+000-1+450) | 27.40 % |
| 969 | P1405 | Construção da Squadra PNTL Posto Admininstrativo Dom Alexo | 56.29 % |
| 970 | P1398 | Supply and Installation of National Connectivity Project VII | 60.00 % |
| 971 | P1392 | Habitasaun aksesivel (PPP-Servicos preparativos desenho e estudo (Ressettlement Site Clearence). This contract is for Affordable Housing PPP project (CF) | 40.00 % |
| 972 | P1391 | New Construction of Jardim 2006 | 98.94 % |
| 973 | P1385 | consulting services for Municipal Spatial Planning of municipalities of Bobonaro and Ermera (PMOT I) | 100.00 % |
| 974 | P1383 | Consulting services for municipal spatial planing of municipalities of Baucau, Lautem and Viqueque (PMOT II) | 93.54 % |
| 975 | P1361 | The Consulting Services for re design of sub structural traditional roof of Ermera Administration office New Building | 50.00 % |
| 976 | P1357 | New Construction of Capela Betesda Naedala - Afoloicai-Uatolari | 100.00 % |
| 977 | P1356 | New construction & supervision of MPO/ADN office | 100.00 % |
| 978 | P1348 | Contruction of fence at IGE IP office in Hera | 11.58 % |
| 979 | P1337 | Rehabilitasaun Estrada Rural ,Ossu de Cima - Liaruca Chainage, Viqueque 6+000 - 8+000 | 100.00 % |
| 980 | P1336 | Construsaun Ponte Sanfuk, Suai (Under Survey & Design) | 50.30 % |
| 981 | P1332 | Nova Construcao da Ponte de Tutuluro, Same | 10.26 % |
| 982 | P1328 | Obra Konstrusaun ba Estrada Local Fatuku-Fatrai Sta. 0+075 - 0+165, Suco Holarua, Posto Adm. Same Villa, Municipio Manufahi | 67.42 % |
| 983 | P1323 | Rehabilitasaun Estrada Rural ,Uaguia-Nahareka, Viqueque Chainage 13+400-15+400 | 55.00 % |
| 984 | P1322 | Rehabilitasaun Estrada Rural ,Uaguia-Nahareka, Viqueque Chainage 11+400-13+400 | 100.00 % |
| 985 | P1321 | Rehabilitasaun Estrada Rural ,Uaguia-Nahareka, Viqueque Chainage 9+400-11+400 | 100.00 % |
| 986 | P1320 | Rural Road Rehabilitation of Uaguia - Nahareka Viqueque Chainage 7+400 - 9+400 Municipality Viqueque | 54.96 % |
| 987 | P1319 | Rural Road Rehabilitation of Uaguia - Nahareka Chainage 5+400-7+400 Municipality Viqueque | 100.00 % |
| 988 | P1314 | Servisu Manutensaun Edificio Agencia De Desenvolvimento Nacional, I.P. Municipio Ermera | 8.11 % |
| 989 | P1312 | Construção de Escola CAFÉ Manufahi (2nd phase) | 0.00 % |
| 990 | P1311 | Construção de Escola CAFÉ Viqueque | 0.00 % |
| 991 | P1310 | Construção de Escola CAFÉ Manatuto (2nd phase) | 0.00 % |
| 992 | P1309 | Construção de Escola CAFÉ Maliana (2nd phase) | 0.00 % |
| 993 | P1302 | Supervisão para Construção de IPB | 0.00 % |
| 994 | P1301 | New Construction of Infrastructure and landscape work at polytechnic Institute of Betano in Same, Manufahi municipality | 100.00 % |
| 995 | P1279 | Rehabilitation of Jct Ex. Kodim - Colegio Road | 100.00 % |
| 996 | P1254 | New Construction of Campas, Paviment and Drainage in Garden of Herois de Fatuquero Ermera | 36.39 % |
| 997 | P1249 | DED no BoQ ba atrakasaun (Landing Facility) iha Porto Regional Suai. | 0.00 % |
| 998 | P1227 | Projecto Konstrusaun Bronjong & Normalizasaun Mota Clere ( Alas manufahi ) Suco Dotic Z | 100.00 % |
| 999 | P1225 | Details Engineering Design for Construction of SAMES warehouse for medical equipment, Nutrition, bulk storage, Quality assurance Laboratory and fire Hydrant system | 93.92 % |
| 1000 | P1219 | Construction of the Pediatric and ICCU Building in Guido Valadares National Hospital (HNGV) Bidau, Santana, Municipality of Dili | 40.09 % |
| 1001 | P1214 | New Construction of Tower protection Wall No 92 Section Betano -Viqueque Manufahi Municipality | 0.00 % |
| 1002 | P1211 | Engineering Procurement Construction-Design, Suplly, Installation, Testing and Commisioning Extension Transformer Bay Of The Existing 150/20KV Liquica Substation to Suplly Power to Tibar Bay Port | 35.26 % |
| 1003 | P1200 | Rehabilitation of Ila - Has Ain Road Sta. 0+000 - 8+764.59 (8.764 Km) | 92.12 % |
| 1004 | P1194 | Asphalting Works From Aileu Sarlala to Aileu Fatisis Package I (8+000 Km) Sta 0+000-8+000, Aileu Municipality | 95.58 % |
| 1005 | P1192 | Construction of Watuwa Irrigation Project | 1.50 % |
| 1006 | P1191 | Construction of Irabere Irrigation Scheme Viqueque Municipality | 2.00 % |
| 1007 | P1190 | Construction of Laivai Irrigation Scheme in Lautem Municipality | 100.00 % |
| 1008 | P1189 | Construction of Maliana II Irrigation Scheme, Bobonaro Municipality | 46.00 % |
| 1009 | P1187 | Servisu Manutensaun Edificio ADN I.P Municipio Lautem | 100.00 % |
| 1010 | P1186 | Servisu Manutensaun Edificio ADN I.P Municipio Ainaro | 100.00 % |
| 1011 | P1185 | Manutensaun de salao Nobre | 26.38 % |
| 1012 | P1184 | Servisu Manutensaun Edificio ADN I.P Municipio Aileu | 100.00 % |
| 1013 | P1180 | Manutensaun Kanais Irrigasaun Halicou-Maliana | 100.00 % |
| 1014 | P1179 | Construction of Galata Irrigation Scheme in Baucau Municipality | 99.01 % |
| 1015 | P1178 | Manutensaun ba Edificio no Equipamentu laboratorium dianostika veternaria | 97.56 % |
| 1016 | P1177 | Additional Work for Hospital Dr.Antonio Carvalho Lahane | 100.00 % |
| 1017 | P1176 | Criacao de estrutura de parede divisorias do ministerio da justica | 100.00 % |
| 1018 | P1175 | Construsaun de Balcao de atendimento publica para a Direcsaun Geral dos servicos de registos e do Notariado do Ministerio da Justica | 100.00 % |
| 1019 | P1174 | New Construction Drinage centro Nasional Chega.I.P | 50.73 % |
| 1020 | P1173 | Refurbishment of tennis court facilities | 85.00 % |
| 1021 | P1172 | konstrusaun ba sala uma hakmatek CHC Ermera | 100.00 % |
| 1022 | P1171 | New Construction of Campas and Grass Planting Jardin dos Herois (JHM) Metinaro | 100.00 % |
| 1023 | P1170 | PARA A CONSTRUCCAO DE JARDIM DE HEROIS DE MANUFAHI (New Construction of Campas, Gate and Leveling) | 100.00 % |
| 1024 | P1169 | Construction of new military company base at Damalaran, Bobonaro Municipality | 81.78 % |
| 1025 | P1168 | New Construction of Roadways, Drainage and Parking Area no Jardim de Herois de Metinaro | 99.65 % |
| 1026 | P1167 | Konstrusaun sede suko Ailok | 98.37 % |
| 1027 | P1166 | Emergency Project, Cyclone Seroja 04 April 2021, 'River Training Kasnafar ( Dili ) 'Regularizasaun Temporaria, ( STA. 0+000 km to STA 0+396.20 km ) | 100.00 % |
| 1028 | P1164 | Servisu Manutensaun Edificio ADN I.P Municipio Covalima | 100.00 % |
| 1029 | P1162 | Renovation of public Health services at lahane , posto vera cruz Timor Leste | 100.00 % |
| 1030 | P1161 | Konstrusaun Kanais Irrigasaun iha Maliana II-Bobonaro | 100.00 % |
| 1031 | P1160 | New construction archive werehouse at bebora | 98.69 % |
| 1032 | P1159 | New construction Warehouse for centro Nacional Chega I.P | 99.12 % |
| 1033 | P1156 | New construction of health post and doctor house building in fuat,Lautem,Iliomar | 97.96 % |
| 1034 | P1155 | Para New Construction of Gapura, Fence and Ossoariu Building no Jardim de Herois de Fatuquero Ermera | 100.00 % |
| 1035 | P1154 | Para a Construsaun de Jardim de Herois de Aileu ( New construction of Campas,Gate and Leveling) | 100.00 % |
| 1036 | P1153 | New Construction of Health post and Doctor House building in hatulia leten, hatolai,Ermera Timor Leste | 100.00 % |
| 1037 | P1152 | Projecto de melhoria area de estacionamento e nova construcao de casa de banho no posto integrado fronteira batugade | 100.00 % |
| 1038 | P1151 | Emergency Project, Cyclone Seroja 04 Abril 2021, Rehabilitation Retaining Wall for Slope Protection at Pantai Kelapa, Dili Municipality | 100.00 % |
| 1039 | P1150 | Emergency Project, Cyclone Seroja 04 April 2021, New Plan for Drainage at Rua Thomas Americo ( City Auto ) | 100.00 % |
| 1040 | P1149 | Emergency Project Cyclone Seroja 04 Abril 2021, River Training Maloa Reqularization Temporary, Check Dam to Bridge (Sta. 0+500 - 1+020 km) Maloa River (LOT 1) adn River Trainning Ailok Laran Regularization Temporary (Sta 0+400 to Sta 1+320) Hera (LOT 2), Dili Municipality | 64.59 % |
| 1041 | P1147 | Emergency Project, Cyclone Seroja 04 Abril 2021 'River Training Maloa ( Dili )' Reqularizasaun Temporaria, RTK to Check Dam Package II ( Sta. 0+740 - 1+640 km ) | 94.30 % |
| 1042 | P1146 | Emergency Project, Cyclone Seroja 04 April 2021, River Training Maloa Regularization Temporary, RTK to Chek Dam Package I (sta.0+020-sta.0+740), Maloa River, Dili Municipality | 64.86 % |
| 1043 | P1145 | Consulting services of spatial planing of Timor Leste | 97.85 % |
| 1044 | P1144 | Servisu manutensaun Edificio ADN I.P Municipio Viqueque | 100.00 % |
| 1045 | P1140 | Supply Wave Breakaer Concrete For Armor Coastal and River Protection For Maintenance and the Emergency Projects, Lot 2: Volume 0.92 Ton For 10,000 PCS | 100.00 % |
| 1046 | P1139 | Supply Wave Breakaer Concrete ( 1.84 Ton ) Amor Coastal and River Protection for Maintenance and the Emergency, Municipality of Dili | 100.00 % |
| 1047 | P1136 | New Construction of Interior Fence for Prison in Suai Municipality | 94.30 % |
| 1048 | P1135 | New Construction of Laboratory iha CSI Luak, Manufahi , relasiona ba covid 19 at ministry of health,Timor Leste | 97.85 % |
| 1049 | P1134 | Projecto Konstrusaun Bronjong & Normalizasaun Mota Clere ( Alas - Manufahi ) Suco Dotik L | 9.33 % |
| 1050 | P1132 | Emergency Project, Cyclone Seroja 04 Abril 2021 Rehabilitation Retaining Wall for River at Bidau (Bidau Capel),Suco Bidau, Posto Administrativo Cristo Rei, Municipality of Dili | 92.26 % |
| 1051 | P1129 | River Protection At Palacio Nobre Lahane Sta. 0+000 - 0+176 Municipality Dili | 100.00 % |
| 1052 | P1128 | Emergency Project, Cyclone Seroja 04 April 2021, River Training Welolo, Viqueque,Regularizasaun Temporaria ( STA 0+220 to STA 0+340) | 100.00 % |
| 1053 | P1126 | New Construction Of Laboratory For Covid 19 At CHI Gleno, Ermera, Ministry Of Health, Timor-Leste | 96.31 % |
| 1054 | P1125 | Emergency Supply and Gabion Construction for Weten Transmission Pipeline,Manatuto Municipality | 100.00 % |
| 1055 | P1124 | Rehabilitation Construction Of Crocodile Cage Hera | 68.28 % |
| 1056 | P1123 | New Construction of Health Post and Doctor House Building in Leber, Bobonaro,Timor Leste | 100.00 % |
| 1057 | P1121 | Emergency Project, Cyclone Seroja 04 Abril 2021 'Rehabilitation Retaining Wall for Slope Protection at Comoro River (MARINIR)' | 99.54 % |
| 1058 | P1115 | Konstrusaun Bareira no Drainagen ba Edificio Sede Suco no Escola Primaria Mane Lobas Municipio Ainaro | 100.00 % |
| 1059 | P1113 | New Construction of Health Post and Douctor House Building in Bualale ,Baucau, Timor Leste | 100.00 % |
| 1060 | P1107 | New Construction Of Wall Protection Tower No. 15, Section Maliana - Suai, Bobonaro Municipality | 82.69 % |
| 1061 | P1104 | New Construction of Fence Around Isolation for Covid-19 at luak Manufahi | 100.00 % |
| 1062 | P1102 | New Construction of Fence at CSI Aileu-Timor Leste | 100.00 % |
| 1063 | P1093 | Consulting Services For Detailed Engineering Design for Navy Port Hera, Dili Municipality | 10.00 % |
| 1064 | P1092 | Execucao da obra da Reparacao do Muro do Tribunal de Dili | 97.71 % |
| 1065 | P1091 | Konstrusaun Intek no Kanais Irrigasaun Larisula iha Baguia Municipio Baucau | 100.00 % |
| 1066 | P1090 | New Construction of Gabions Tower No. 4 Section Manatuto - Baucau Municipality Manatuto | 100.00 % |
| 1067 | P1089 | Konstrusaun Sede Suco, Uaigae Vemasse | 65.19 % |
| 1068 | P1088 | Konstrusaun Sede Suku, Suku Uailaha Municipio Baucau | 39.50 % |
| 1069 | P1087 | Konstrusaun Sede Suku, Suku Samalari Baguia Municipio Baucau | 12.06 % |
| 1070 | P1086 | Konstrusaun Sede Suku, Suku Atelari Laga Municipio Baucau | 20.29 % |
| 1071 | P1085 | konstrusaun Moru Haleu Mercadu Tualiku Baucau Villa Municipio Baucau | 39.50 % |
| 1072 | P1083 | Rehabilitasaun Residensia Adminitrador + Murru no Jardim Municipio Lautem | 6.18 % |
| 1073 | P1082 | NOVA CONSTRUÇÃO ESCOLA BÁSICA FILIAL BATARA | 0.00 % |
| 1074 | P1080 | Konstrusaun Edificio Posto Administrativo Bazartete & Moru Haleu | 39.42 % |
| 1075 | P1079 | Konstrusaun Murru Haleu Edifisiu Administasaun Munisipiu no Jardim Municipiu Lautem | 6.87 % |
| 1076 | P1076 | New Construction of Health Post and Doctor's House Buiding in Aileu, Lequidoe / Faturilau, Timor Leste | 100.00 % |
| 1077 | P1075 | New Construction of Health Post and Doctor's House in Builale, Ossu, Viqueque, Timor Leste | 100.00 % |
| 1078 | P1072 | Consulting Services for Detailed Engineering Design (DED) for Construction of Municipal Market (Lautem, Baucau and Ermera) | 30.00 % |
| 1079 | P1071 | New Construction of Isolation At CHC Gleno Ermera, Timor Leste | 94.19 % |
| 1080 | P1069 | New Construction of Retaining Wall Protection & Installation Gabions Tower No.19 Section Hera - Dili, Dili Municipality | 100.00 % |
| 1081 | P1067 | Konstrusaun koby house foun andar 2 iha Ministerio Estatal | 89.75 % |
| 1082 | P1066 | Contract for Calibration of Laboratory Equipment | 100.00 % |
| 1083 | P1065 | Rehabilitasaun Edificio Dormitoriu INS Comoro-Dili Timor Leste | 95.62 % |
| 1084 | P1063 | Manutensaun no Konstrusaun Kanais Irrigasaun iha Oebaba - Covalima | 100.00 % |
| 1085 | P1062 | New Construction of Escola CAFE Building at Liquica Municipality | 57.08 % |
| 1086 | P1061 | New Construction of ESCOLA CAFE building in Ainaro Municipality | 7.26 % |
| 1087 | P1058 | Rural Roads Periodic Maintenance Ossu Nahareka Chainage 4+350 - 6+350 Municipality Viqueque | 100.00 % |
| 1088 | P1057 | New Construction of ESCOLA CAFE building in Covalima Municipality | 37.87 % |
| 1089 | P1057 | New Construction of ESCOLA CAFE building in Covalima Municipality | 100.00 % |
| 1090 | P1056 | New construction of Gapura and gabion wall protection no jardim de herois de Natarbora | 100.00 % |
| 1091 | P1055 | New Construction of Cirurgia Building In HR. Maliana, Ministry of Health, Timor Leste | 99.65 % |
| 1092 | P1054 | New Construction of Pediatric Building in HR Maliana, Timor Leste | 100.00 % |
| 1093 | P1053 | Konstrusaun Kanais Irrigasaun iha Bebui Municipio Viqueque | 100.00 % |
| 1094 | P1052 | Supply, Erection and Comissioning Of 20 KV and 0.4 KV Networks and Connection Of Houses At Rairobo, Sub-District Of Atabae, Municipality Of Bobonaro | 97.33 % |
| 1095 | P1045 | Rehabilitation of JCT. Australia Embassy - Marconi Roas ( Access to Hotel Hilton ) Municipio Dili | 76.00 % |
| 1096 | P1044 | Emergency Project for Mota Bidau Toko Baru Municipio Dili | 100.00 % |
| 1097 | P1043 | New Construction of Runway Shoulder & Replacement of Runway Concrete to Runway Asphalt Aeroporto Internacional Nicoulau Lobato | 100.00 % |
| 1098 | P1042 | Konstrusaun Moru Haleu no Posto Siguransa ba Edificio Posto Administrativo Maubara | 16.32 % |
| 1099 | P1041 | Emergency Project For Tibar River | 100.00 % |
| 1100 | P1040 | Manutensaun Kanais Irrigasaun Faulara - Liquica | 95.71 % |
| 1101 | P1039 | Rehabilitasaun Residencia Administrador Municipio, Jardim, Picina no Moru | 3.83 % |
| 1102 | P1038 | New Construction of F-FDTL Fuel Station at Metinaro - Dili Municipality | 93.62 % |
| 1103 | P1035 | Konstrusaun Moru Haleu Edificio Administarasaun Municipio Viqueque | 40.20 % |
| 1104 | P1034 | New Construction of Gabion Tower No 6 Section Hera -Manatuto, Dili Municipality | 100.00 % |
| 1105 | P1033 | For River Normalization, Embankment and Roads Clean Up Of Ponte CPLP to Tasi Ibun, Maloa Ailok Laran, Becora - Becusse Emergency Project | 100.00 % |
| 1106 | P1032 | For River Normalization of Lahane River ( Be'e Dois ), Mortuario Lahane Emergency Project | 100.00 % |
| 1107 | P1031 | Emergency project of new construction Box Culvert ( Single Cell ) Ailok Laran | 100.00 % |
| 1108 | P1030 | Rural Roads Periodic Maintenance Luro - Kotamutu - Lakawa Chainage 0+000 - 6+500 Lautem Municipality | 100.00 % |
| 1109 | P1029 | For River Normalization And Roads Clean Up Casnafar, Manleu-Aldeia Mane Mesak no Aldeia Laulora Emergency Project | 100.00 % |
| 1110 | P1028 | Servisu Manutensaun Edificio Agencia de Desenvolvimento Nasional | 54.34 % |
| 1111 | P1027 | For River Normalization Of Akanunu Hera Emergency Project | 100.00 % |
| 1112 | P1026 | R4D Rural Road Routine Maintenance, Dotic - Weberek Chainage 0+000 - 6+300 and Dotic - Wekakaoan Chainage 0+000 - 8+600 Municipality Manufahi | 100.00 % |
| 1113 | P1025 | R4D Rural Road Routine Maintenance, Ladaki Chainage 0+000 - 1+200, Same - Rotuto Chainage 0+000 - 12+000 Municipality Manufahi | 100.00 % |
| 1114 | P1024 | R4D Rural Road Routine Maintenance, Manico - Lianai - Grotu Chainage 0+000 - 11+200 Municipality Manufahi | 96.92 % |
| 1115 | P1023 | R4D Rural Road Spot Improvement Caicasa - Fatucahi Chainage 6+000 - 9+000 Municipality Manufahi | 100.00 % |
| 1116 | P1022 | R4D Rural Road Spot Improvement Caicasa - Fatucahi Chainage 9+000 - 12+000 Municipality Manufahi | 100.00 % |
| 1117 | P1021 | R4D Rural Road Spot Improvement Caicasa - Fatucahi SP SATU Chainage 0+000 - 7+900 Municipality Manufahi | 100.00 % |
| 1118 | P1020 | R4D Rural Road Spot Improvement Betano - Loro Chainage 0+000-6+300 | 100.00 % |
| 1119 | P1019 | R4D Rural Road Spot Improvement Dasidara - Liquidiga Chainage 0+000-10+500, Lautem Municipality | 100.00 % |
| 1120 | P1018 | R4d Rural Road Spot Improvement Caicasa - Fatucahi Chainage 0+000-6+000 | 100.00 % |
| 1121 | P1017 | R4d Rural Roads Spot Improvement Leuro - Sourulua Chainage 0+000-2+650 | 100.00 % |
| 1122 | P1016 | R4d Rural Road Spot Improvement Luro - Kotamutu - Lakawa Chainage 0+000-6+500 | 100.00 % |
| 1123 | P1015 | R4D Rural Road Spot Improvement Luro - Barikafa Chainage 0+000+7+000 Lautem Municipality | 60.48 % |
| 1124 | P1014 | R4D Rural Road Routine Maintenance, Tukununu Feriksare Chainage 0+000-6+350 Manufahi Municipality | 100.00 % |
| 1125 | P1013 | New Construction of Health Post and Doctor House Buiding in Beisuk, Tilomar, Covalima, Timor Leste (Niquir) | 99.78 % |
| 1126 | P1012 | Manutensaun Kanais Irrigasaun Raibere-Ainaro | 100.00 % |
| 1127 | P1011 | Cleaning Up of River Adjacent to Palacio Presidente Aitarak Laran, Farol & Fomento Ponte Comoro 2 Emergency Project | 100.00 % |
| 1128 | P1010 | Extention of Sames Ware-House Building at Kampo Alor | 94.53 % |
| 1129 | P1009 | Rehabilitasaun Jardin 1959 Municipio Viqueque | 40.12 % |
| 1130 | P1008 | For River Normalization & Landslide Clearing Works Of Tibar - Gleno Emergency Project | 100.00 % |
| 1131 | P1007 | Instalasaun Agua Potavel iha Edificio Ministerio da Defesa no QG das F-FTL | 97.78 % |
| 1132 | P1006 | Konstrusaun Fatin Isolamentu iha Municipiu Manatuto, Timor Leste | 100.00 % |
| 1133 | P1005 | The Designated Development Zones Growth Polse Baucau and Batugede | 100.00 % |
| 1134 | P1004 | New Installation MV, LV Lines, Distribution Transformer and House Connection From Maumeta to Mauboke, Mauboke Subdistrict - Liquica District | 94.93 % |
| 1135 | P1003 | New Construction Lanscaping and Gazebo at Vice Prime Minister Official Recident | 96.67 % |
| 1136 | P1002 | Enhancement of Project - Management Information System (PMIS) - 2021 | 100.00 % |
| 1137 | P1001 | For River Normalization of Comoro Mota Ulun - RMS Check Dam Road Embankment Emergency Project | 100.00 % |
| 1138 | P1000 | For Clean Up Of Metiaut - Cristo Rei, Areia Branca - Dolok Oan Emergency Project | 100.00 % |
| 1139 | P0999 | Konstrusaun Fatin isolamentu iha Municipio Aileu, Timor Leste | 100.00 % |
| 1140 | P0998 | New Construction Of Laboratory For Covid 19 At HR Maliana, Ministerio da Saude | 88.83 % |
| 1141 | P0997 | Konstrusaun Fatin isolamentu iha Municipio Manufahi, Timor Leste | 99.65 % |
| 1142 | P0996 | New Construction for ICU Building in Referal Hospital Maubisse, Timor-Leste | 100.00 % |
| 1143 | P0995 | New Construction of Eletrical Tower (No.55) Protection wall - Section Betano Casa Ainaro | 100.00 % |
| 1144 | P0994 | Rehabilitation of Mini Mercado Mota Masin in Suai Covalima Ministry of Health, Timor Leste | 100.00 % |
| 1145 | P0993 | For Cleaning Up, Road Embakment & River Normalization of Hera Mota Ailok-Naval, Hera Mota Kiik, Hera Mota Akanuno, Roads Emergency Project | 100.00 % |
| 1146 | P0992 | Konstrusaun, Vedasaun no Jardim ba Edificio DTPSC | 100.00 % |
| 1147 | P0991 | New Construction of isolation ( OPD) Vera cruz relation of covid 19 | 87.48 % |
| 1148 | P0990 | Konstrusaun Jardim Edificio Adm Municipio Ainaro | 100.00 % |
| 1149 | P0989 | New Construction Of Gabions Tower No. 6 Section Hera - Dili, Dili Municipality | 100.00 % |
| 1150 | P0988 | New Construction Of Wall Protection Tower No. 98 Section Liquica - Maliana | 80.00 % |
| 1151 | P0987 | Rural Roads Periodik Maintenance Lepo - Lour Chainage 0+000-3+000 | 89.63 % |
| 1152 | P0986 | R4D Rural Road Routine Maintenance Haturalan - Cairui Chainage 0+000-9+800 | 100.00 % |
| 1153 | P0985 | R4D Rural Road Spot Improvement Kaen-Laran - Barique Chainage 0+000-9+000 | 100.00 % |
| 1154 | P0984 | R4D Rural Road Spot Improvement Soibada - Fatumakerek Chainage 8+000-10+700 | 100.00 % |
| 1155 | P0983 | R4D Rural Road Spot Improvement Laclubar - Funar Chainage 0+000 - 12+000 | 100.00 % |
| 1156 | P0982 | R4D Rural Road Spot Improvement Uma Boco - Agriculture Center Chainage 0+000 - 3+000 | 90.01 % |
| 1157 | P0981 | R4D Rural Road Spot Improvement Manlala (Manufahi Kiík) - Soibada Chainage 0+000-2+000 | 100.00 % |
| 1158 | P0980 | R4D Rural Road Spot Improvement Loihunu-Uagia Chainage 0+000 - 6+800 | 100.00 % |
| 1159 | P0979 | R4D Rural Road Spot Improvement Ossu-Nahareca Chainage 0+000-3+400 | 100.00 % |
| 1160 | P0978 | R4D Rural Road Spot Improvement Agriculture Center - Aubeon Chainage 3+000-6+200 | 100.00 % |
| 1161 | P0977 | R4D Rural Road Spot Improvement Funar - Fatumakerek Chainage 12+000 - 27+000 | 95.04 % |
| 1162 | P0976 | Spot Improvement Hera - Liurai Star 4+00 - 10+400 Dili and Aileu Municipality | 85.98 % |
| 1163 | P0975 | R4D Rural Road Spot Improvement Vemasse - Caicua - Osso Ala Chainage 0+000 - 21+600 | 48.53 % |
| 1164 | P0974 | R4D Rural Road Routine Maintenance Caicoli-Liabala Chainage 0+000-6+500 Uma Ana Iku Chainage 0+000-4+500 Bercoli-Bahamori Chainage 0+000-4+000 Buruma-Uaimateme Chainage 0+000-2+800 Boile-Uatabo Chainage 0+000-5+200 | 95.93 % |
| 1165 | P0973 | R4D Rural Road Spot Improvement Baucau-Uatabo Chainage 0+000 - 4+800 | 93.62 % |
| 1166 | P0972 | Rural Roads Routine Maintenance Ainaro - Maununo Sta. 0+000 - 5+500, Mau - Ulo Lau Sta. 0+000 - 1+200 Ainaro Municipality | 74.84 % |
| 1167 | P0971 | Rural Roads Routine Maintenance Dare - Mauchiga Chainage 0+000 - 5+000, Mauchiga - Lesuati Star 5+000 - 7+800, in Ainaro Municipality | 100.00 % |
| 1168 | P0970 | R4D Rural Road Spot Improvement Maubise Liurai Chainage 0+000-10+200 Ainaro Municipality | 100.00 % |
| 1169 | P0969 | R4D Rural Road Spot Improvement Baguia Larisula Chainage 0+000-12+900, Rural Roads Routine Maintenance Samalari-Sorugua Chainage 0+000-2+800 Teriluedae-Saelari-Binagua Chainage 0+000-3+600 Baucau Municipality | 43.77 % |
| 1170 | P0968 | R4D Rural Road Spot Improvement Loilubu-Osoala Chainage 2+500-4+500 Baucau Municipality | 100.00 % |
| 1171 | P0967 | R4D Rural Road Spot Improvement Loilubu-Osoala Chainage 0+000-2+500 Baucau Municipality | 94.03 % |
| 1172 | P0966 | Spot Improvement Hera - Liurai Star 0+000 - 4+000 Dili and Aileu Municipality | 100.00 % |
| 1173 | P0965 | Spot Improvement Liuirai - Hatubuilico Star 0+000-5+600 Liurai - Fatubosa Star 0+000- 3+100 Ainaro Municipality | 77.79 % |
| 1174 | P0964 | R4D Rural Road Maintenance Berlakulidu - Laberlaka Chainage 0+000 - 5+400 Nunuleta - Darulema Chainage 0+000 - 1+600 Vaviquinia - Maubaralisa Chainage 0+000 - 12+500 | 100.00 % |
| 1175 | P0963 | Rehabilitation of Roads, Road Section: Uaiaca - Quelicai - Lacudala Sta. 0+000 - Sta. 5+400 (Package 1) Municipality Baucau | 92.14 % |
| 1176 | P0962 | Konstrusaun Fatin Izolamentu iha CHC Lospalos Municipiu Lautem | 100.00 % |
| 1177 | P0961 | Konstrusaun Armagen Foun Matadouro | 94.12 % |
| 1178 | P0960 | Manutensaun no rehabilitasaun mercado fronteira ba fatin karantina iha fronteira (Batugade). | 85.00 % |
| 1179 | P0959 | Servisu Manutensaun Edificio Agencia de Desenvolvimento Nasional | 54.34 % |
| 1180 | P0958 | New Construction of Laboratory for Covid 19 in Liquica Ministry of Health, Timor Leste | 73.90 % |
| 1181 | P0957 | New construction of isolation for covid 19 in chi liquica, Timor Leste | 100.00 % |
| 1182 | P0956 | Maintanance and Rehabilitation for quarentina tasi tolu phase III Dili, Timor Leste | 95.56 % |
| 1183 | P0955 | Loke Estrada Foun no Rehabilitasaun 3.461 Km, Suco Kairui, Laleia, Manatuto | 100.00 % |
| 1184 | P0954 | New Construction of Laboratory for Covid 19 at Manatuto, Ministery of Helath, Timor Leste | 100.00 % |
| 1185 | P0953 | Revitalization of Community Aitarak Laran | 20.00 % |
| 1186 | P0952 | For Preparation of Detailled Engineering Design for Rehabilitation of 'Municipio Roads' Package 6 : Alas - Wedauberek | 100.00 % |
| 1187 | P0951 | For Preparation of Detailled Engineering Design for Rehabilitation of 'Municipio Roads' Package 9 : Laclo to Laclo Town Road | 100.00 % |
| 1188 | P0950 | Loke Estrada Foun no Rehabilitasaun 3.461 Km, Suco Kairui, Laleia, Manatuto | 100.00 % |
| 1189 | P0949 | New Construction of Laboratory for Covid 19 at Lautem, Ministery of Health, Timor Leste | 92.09 % |
| 1190 | P0948 | Rehabilitation of Ex Mercado Mota-Ain (Phase II) in Maliana, Bobonaro | 86.33 % |
| 1191 | P0947 | New Construction of Laboratory for Covid 19 at Suai Referal Hospital, Ministry of Health Timor-Leste | 91.69 % |
| 1192 | P0946 | Rehabilitasaun Eis hospital Trilolo Baucau ba Fatin Karantina,ICU,Laboratorium no Izolamento Ministerio | 99.82 % |
| 1193 | P0945 | New Construction of laboratory for covid 19 at CHC Aileu Vila | 95.51 % |
| 1194 | P0944 | Emergency Projecto Estrada Kampu Alor Tasi Ibun Municipio Dili | 100.00 % |
| 1195 | P0943 | Extention Room For Toilet At Quarentina Mota-Ain Maliana, Bobonaro | 100.00 % |
| 1196 | P0942 | Additional Service Statement of Work for Year 2021 - Government Resource Planning Solutions & Supporting IT Infrastructure System Implementation & Support Agreement | 79.40 % |
| 1197 | P0941 | Manutensaun , Rehabilitasaun no fornesimentu Mobiliario ba fatin karantina Tasi tolu | 100.00 % |
| 1198 | P0940 | Construction of Sahen Bridge Approach Protection ( A14 ) Manatuto ( MPW-W-190157 ) (162) | 70.75 % |
| 1199 | P0939 | Rehabilitation Of Slow Sand Filter (SSF) Part Ii Riheu and Instalation Of Water Meter (Contador) In Riheu, Gleno, Ermera Municipality / 162 | 6.41 % |
| 1200 | P0938 | New Construction of Isolamento for covid-19 Suai Referal Hospital, Covalima, Timor Leste | 93.51 % |
| 1201 | P0937 | New Construction of Isolation for Covid 19 in Maliana Referral Hospital, Bobonaro, Timor Leste | 98.27 % |
| 1202 | P0936 | R4D Rural Roads Routine Maintenance Dato Tolu Chainage 0+000 - 9+600, Lookeu Chainage 0+000 - 6+000, Casabau 008 Chainage 0+000 -3+000, Casabauc 012 Chainage 0+000 - 3+500, Casabauc 018 Chainage 0+000 - 2+700, Lauwala Chainage 0+000 - 3+500, Boardikun - Mape Chainage 0+000 - 8+000, Naguidal - Lepo Chainage 0+000 - 4+000 Covalima Municipality | 100.00 % |
| 1203 | P0935 | Hamos Tangki Estasaun Tratamento Agua Residuais Etar Tibar / 162 | 79.42 % |
| 1204 | P0934 | Rural Roads Periodic Maintenance Baguia - Larisula Chainage 0+000 - 12+900 in Baucau Municipality | 97.12 % |
| 1205 | P0933 | Road Maintenance Section: Baucau Urbans, Baucau Town, Baucau Municipality (162) | 85.28 % |
| 1206 | P0932 | For Preparation of Detailed Engineering Design for Road Rehabilitation of 'Municipal Road' Package 10 Soibada to Soibada Town | 100.00 % |
| 1207 | P0931 | For Preparation of Detailed Engineering Design for Rehabilitation of Municipio Roads Package 1jct A-16 (Bobonaro) to Lolotoe Town | 100.00 % |
| 1208 | P0930 | For Preparation of Detailed Engineering Design for Roads Rehabilitation of Municipio Maliana Package 11 : Maliana Town Roads | 70.00 % |
| 1209 | P0929 | Preparation of Detailed Engineering Design for Road Rehabilitation of 'Municipal Road' Package 2 Uatolari - Laisorulai (162) | 100.00 % |
| 1210 | P0928 | For Preparation of Detail Engineering Design and Building Document Preparation for New Bridges in 2019 Suco Liurai, Maubara - 1 Bera Railaco, Sanfuk, Tutu Luro - Same Fahi Nehan (162) | 70.00 % |
| 1211 | P0927 | For Preparation of Detailed Engineering Design for Road Rehabilitation of Municipal Road Package 3 Uacala - Quelicai to Ossu | 98.92 % |
| 1212 | P0926 | For Roads & Bridges Maintenance Section : Mantanen Laclo, Manatuto Minicipality | 100.00 % |
| 1213 | P0925 | Improvement of Mina Distribuition Pipe in DMA 31 in Suco Mascarenhas | 69.16 % |
| 1214 | P0924 | For Preparation of Detailed Engineering Design For Rehabilitation of Municipio Roads Packager 4 :Laga to Baguia | 100.00 % |
| 1215 | P0923 | For Preparation of Detailed Engineering Design for Road Rehabilitation of 'Municipal Road' Package: 12 Luca - Lacluta | 100.00 % |
| 1216 | P0922 | Rural Road Routine Maintenance Poetete Chainage 0+000 - 6+000, Lihu Samalete Chainage 0+000 - 6+300, Ermera Municipality | 100.00 % |
| 1217 | P0921 | R4D Rural Periodic Maintenance Kaen Laran - Barique Chainage 0+000 - 9+000 & Routine, Hatularan-Cairui Chainage 0+000-9+800 Municipality Manatuto(162) | 41.78 % |
| 1218 | P0920 | Road and Bridge Maintenance Section : Tibar - Liquica - Maubara ( A03 ) & Carimbala - Loes ( A03 ) Municipality Liquica /162 | 100.00 % |
| 1219 | P0919 | Road Maintenance Section Taroman - Datorua - Fatumeta (A016) 13.15 Km Section Covalima Municipality (162) | 83.45 % |
| 1220 | P0918 | Rebidding of Project Road Maintenance Sections ; Suai, Maucatar - Lelaus Municipality Covalima (162) | 56.96 % |
| 1221 | P0917 | For Routine Roads Maintenance - JCT A09 Laclubar (C15), Manatuto Municipality (162) | 100.00 % |
| 1222 | P0916 | Rural Roads Routine Maintenance Vemase - Chaicua Chainage 0+000 - 17+000, Caicoli - Liabala Chainage 0+000 - 6+500 and Uma Ana Iku Chainage 0+000 - 4+500 Municipality Baucau | 100.00 % |
| 1223 | P0915 | Projecto Hamos Dranagen Municipio Dili / 162 | 100.00 % |
| 1224 | P0914 | Realization of the Detailed Engeneering Design (DED) includes Reparation of Feasibility Study of the University of Aileu (Bem Serviso) | 54.05 % |
| 1225 | P0913 | New Line Drain Sand Pocket Construction Road Maitenance Section Urban Roads (162) | 100.00 % |
| 1226 | P0912 | Consultancy to develop A feasibility study and master plan Guido Valadares National Hospital (Bem Serviso) | 100.00 % |
| 1227 | P0911 | Rehabilitation of President Residence in Farol Dili Timor Leste (Bem Serviso) | 87.73 % |
| 1228 | P0910 | Rural Roads Routine Maintenance Dato Tolu Cha 0+000 - 9+600, Lookeu Cha 0+000 - 6+000, Casabauc 008 Cha 0+000 - 3+000, Casabauc 012 Cha 0+000 - 3+500, Casabauc 018 Cha 0+000 - 2+700, Lalawa Cha 0+000 - 3+500, Boraikun Mape Cha 0+000 - 8+000, Naguidal Lepo Cha 0+000 - 4+000 Municipality Covalima | 53.35 % |
| 1229 | P0909 | Rural Road Routine Maintenance Rairobo Pasmaten Chainage 0+000 - 3+000, Aidabaleten Chainage 0+000 - 1+100, Balibo Cowa Chainage 0+000 - 10+000, Balibo Ferik Katuas Chainage 0+000 - 7+700, Builecun Leohitu Chainage 0+000 - 6+800, Marobo Bee Manas Chainage 0+000 - 5+700 | 100.00 % |
| 1230 | P0908 | Rehabilitasaun Sistema be'e mos iha aldeia Pandevou ho Mau-Uno,Sucu Guico /162 | 54.99 % |
| 1231 | P0907 | Zebra Cross Marking in The Capital City of Dili (162) | 75.59 % |
| 1232 | P0906 | Rehabilitation of Confrence Room at the office of the Primer Minister, building I, Palacio do Governo,Dili Timor Leste | 100.00 % |
| 1233 | P0905 | New Construction of Isolation for Covid-19 in Atauro | 95.31 % |
| 1234 | P0904 | New Construction of Laboratory for Covid-19 in Atauro | 96.09 % |
| 1235 | P0903 | R4D Rural Roads Periodic Maintenance Atsabe - Laubono Chainage 0 + 000 - 11 + 600 Ermera Municipality (162) | 100.00 % |
| 1236 | P0902 | Rural Roads Periodic Maintenance Lospalos Soru Chainage 0 + 000 - 2 + 500, Lautem Municipality (162) | 100.00 % |
| 1237 | P0901 | Preparation of Master Plan For Municipal Capitals Water Supply and Sanitation (Aileu-Gleno-Liquica) /162 | 10.00 % |
| 1238 | P0900 | Rural Roads Rehabilitation Malilait Chainage 1 + 500 - 3 + 000 Bobonaro Municipality / 162 | 100.00 % |
| 1239 | P0899 | Rural Roads (R4D) Periodic Maintenance Laclubar Fatumakerek Chainage 0+000 - 27+000 (162) | 74.00 % |
| 1240 | P0898 | Detailed Engineering Design Hospital Dr. Antonio Carvalho LOT'A' Lahane Oriental | 100.00 % |
| 1241 | P0897 | New Construction of ICU ROOM in Covalima, Timor Leste | 95.44 % |
| 1242 | P0896 | New Construction of Wall Protection Tower No.31 Section Area Cassa - Suai Munipality Covalima | 60.86 % |
| 1243 | P0895 | Konstrusaun Sistema Bee Mos iha Suco Afaloicai (Bem Serviso)/162 | 47.38 % |
| 1244 | P0894 | New Construction of ICU ROOM in Bobonaro, Maliana (Bem Serviso) | 95.10 % |
| 1245 | P0893 | Selection of Design Consultant to Prepare Preliminary Design and Tender Documents for the Upgradition of Liquica 150 KV/20KV Substation to Supply Power to Tibar Bay Port | 100.00 % |
| 1246 | P0892 | Rehabilitation Recident & Carport of Vice PM (Bem Serviso) | 100.00 % |
| 1247 | P0891 | Kontinuasaun Kanalizasaun Kanu Transmisaun no Distribuisaun Hosi Bomba Uma Berloik ba to Dotic, Posto Administrativo Alas, Municipio Manufahi/ 162 | 30.00 % |
| 1248 | P0890 | New Construction of Wall Protection Tower No. 76 Section Viqueque - Lospalos | 20.43 % |
| 1249 | P0889 | Building Minor Maintenance East Side (Manatuto, Baucau, Lospalos & Viqueque | 80.85 % |
| 1250 | P0888 | New Construction Fencing, Stonee Massonry Wall and Chapel for Cemetery in Airport Area in Covalima Municipality | 94.04 % |
| 1251 | P0887 | For Preparation of Detailled Engineering and Bid Preparations for New Bridges in 2019 Package I Samalari, Sana Uatolari-Laisorulai, Sumaco (Lacluta Uma Tolu), Malos Matadoro-RTK, Comoro Motaulun | 100.00 % |
| 1252 | P0886 | Rural Road Rehabilitation Fuiloro - Home Chainage 0+000 - 1+200 Municipality Lautem | 100.00 % |
| 1253 | P0885 | Rural Road Rehabilitation Fuiloro - Home Chainage 1+200 - 2+500 Municipality Lautem | 100.00 % |
| 1254 | P0884 | For Preparation of Detailed Engineering Design For Rehabilitation of 'municipio Roads' Package 8 : ( Be' Cluru ) to Lequidoe Town (162) | 100.00 % |
| 1255 | P0883 | Rural Roads Rehabilitation Maliana - Saburai Atus Chainage 18+500 - 20+000 Municipality Bobonaro | 100.00 % |
| 1256 | P0882 | Konstrusaun Lutu Hadulas WTP Central iha Bairo-Pite Dom Aleixo Municipio Dili /162 | 74.81 % |
| 1257 | P0881 | Rehabilitasaun Sistema Be mos Multy Aldeia Iha Dacolo Suco Nanu, Posto Administrativo Fatumea Municipio Covalima / 162 | 51.00 % |
| 1258 | P0880 | Urgent Installation of Street Lights in Cristo Rei, Dili | 72.97 % |
| 1259 | P0879 | Lot 1 Urgent Installation of Street Lights in Cristo Rei,Dili /162 | 72.97 % |
| 1260 | P0878 | Urgent Installation of Street Lights in Cristo Rei, Dili | 87.00 % |
| 1261 | P0877 | Urgent Installation of Street Lights in Tasi Tolu, Dili /162 | 72.00 % |
| 1262 | P0876 | Rehabilitasaun e Manutensaun Edifisio Armajen DNSA, Dili (Bem Serviso) (162) | 69.53 % |
| 1263 | P0875 | Design Services of New Construction of Fence Wall Tibar Liquica Municipality | 100.00 % |
| 1264 | P0874 | Design Services New Construction of Warehouse Tibar Liquica Municipality | 100.00 % |
| 1265 | P0873 | Konstrusaun Sistema Bee Mos Iha Suco Aubeon no Aimetalaran /162 | 46.50 % |
| 1266 | P0872 | Servisu Manutensaun Edifisiu CRC Munisipiu Manatuto | 15.92 % |
| 1267 | P0871 | Konstrusaun Foun EBF Hotugara Bazartete, Liquica | 100.00 % |
| 1268 | P0870 | Konstrusaun Moralha Foun Matadoro Tibar | 77.60 % |
| 1269 | P0869 | Konstrusaun Be'e Mos Sistema Pompa no Gravitasaun,Tchay Titilary, Nuhalata, Posto Administrativo Lospalos Vila, Municipio Lautem/ 162 | 33.53 % |
| 1270 | P0868 | Konstrusaun no Instalasaun Sistema Be'e Mos iha Aldeia Homokanu, Foemaa, Nanakuru no EBF Soru Posto Administrativo Lospalos Vila, Municipio Lautem/ 162 | 25.15 % |
| 1271 | P0867 | Projectu Konstrusaun Turismu Komunitariu iha COM, Postu Administrativu Lautem | 91.76 % |
| 1272 | P0866 | New Water supply of bairos PNTL Ermera | 85.91 % |
| 1273 | P0865 | Rehabilitation of Medicine Laboratorium in Lahane | 100.00 % |
| 1274 | P0864 | Desenho e Espicificacao de Quantidades BoQ para a ampliacao do Balcao de Atendimento na DNRN | 100.00 % |
| 1275 | P0863 | Minor Rehabilitasaun of MTC main of Building and Correeios | 98.90 % |
| 1276 | P0862 | Konstrusaun Turismu Komunitariu One Dollar Beach | 82.03 % |
| 1277 | P0861 | Rehabilitation and Maintenance Building PCM | 100.00 % |
| 1278 | P0860 | Manutensaun Edificio iha Gabinete Ministro nian | 95.84 % |
| 1279 | P0859 | Rehabilitasaun and Maintanance of Vice Minister office in Mandarin | 81.76 % |
| 1280 | P0858 | Konstrusaun temporario fatin isolamento iha tasi tolu Building A | 100.00 % |
| 1281 | P0857 | Rehabilitasaun Hospital Dr.Antonio Carvalho Lahane(Building A) Hodi halo Fatin Izolamentu ba Pasienti Covid-19 | 92.26 % |
| 1282 | P0856 | Construsaun de moru valeta gabiao e edificio de seguranca de Infordepe | 97.97 % |
| 1283 | P0855 | Konstrusaun temporario fatin isolamento iha tasi tolu Building B | 100.00 % |
| 1284 | P0854 | RM Pecas Sofremento pagamento Bee Mos | 100.00 % |
| 1285 | P0853 | Maintanance ADN office ( MPIE BUILDING) (Bem Serviso) | 51.22 % |
| 1286 | P0852 | Maintenance of Building for Trade Invest Timor Leste | 55.88 % |
| 1287 | P0851 | Manutensaun Armagen Fumigasaun iha Bebora-Dili | 83.73 % |
| 1288 | P0850 | Renovation of Building for secretary of state for cooperatives new Office | 94.84 % |
| 1289 | P0849 | Rehabilitasaun Jardim 12 de Novembro iha Igreza Motael nia oin (PN) | 87.73 % |
| 1290 | P0848 | Prestasaun Servico Konstrusaun Edificio (Toilet & Dapur) | 91.42 % |
| 1291 | P0847 | Rehabilitasaun Jardim 12 de Novembro iha Igreza Motael nia oin (MAE) | 90.46 % |
| 1292 | P0846 | Melhoramento be mos Sistema Gravitasaun iha Bulo Pelet suko Lour, Suko Fatu Leto, Suko Zulo Phase I Posto Administrativo Zumalai, Municipio Covalima / 162 | 65.51 % |
| 1293 | P0845 | Manutensaun Edificio iha Posto Integrado Batugade | 98.16 % |
| 1294 | P0844 | Rehabilitation to Repair the Wall and Office for Baucau District Court | 100.00 % |
| 1295 | P0843 | Konstrusaun Turismo Komunitariu iha Suku Leblora - Ainaro | 100.00 % |
| 1296 | P0842 | Programma Turismo Komunitario 2014 Seloi / Malere | 100.00 % |
| 1297 | P0841 | Preparation of Detailed Engineering Design for Rehabilitation of Municipio Roads Package 4 : Turiscai to Alas | 70.00 % |
| 1298 | P0840 | Rural Roads Rutine maintenance Laisorulai - Nae - Chainage 0+000 - 1+500 and Quelicai Chainage 0+000 - 10 + 000 in Baucau Municipality | 74.66 % |
| 1299 | P0839 | Rural Roads Periodic Maintenance Luro - Barikafa Chainage 0+000 - 7+000 Municipality Lautem (162) | 88.25 % |
| 1300 | P0838 | Rural Roads Periodic Maintenance Dasidara Lequidiga 0+000 - 10+000 Chainage Municipality Lautem (162) | 100.00 % |
| 1301 | P0837 | Rural Roads Routine Maintenance Baucau - Uatabo Chainage 0+000 - 4+800 and Boile - Uatabo Chainage 0+000 - 5+200 in Municipality Baucau / 162 | 98.38 % |
| 1302 | P0836 | R4D Rural Roads Periodic Maintenance Laulara - Ornai Chainage 0+000 - 8+000 Routine Maintenance Madabeno - Lisimori Chainage 0+000 - 4+900 and Acumau - Aicorema Chainage 0+000 - 2+000 Municipality Aileu | 100.00 % |
| 1303 | P0835 | R4D MPW Rural Roads Maintenance Project in Bobonaro Municipality Package: Rural Roads Periodic Maintenance Maliana Saburai Atus Chainage 0+000 - 10+000 / 162 | 100.00 % |
| 1304 | P0834 | Rural Roads Routine Maintenance Maliana Saburai Atus Chainage 10+000 - 17+000, Raifun Chainage 0+000 - 0+000 - 1+000, Ritabou Chainage 0+000 - 2+000, Saburai Task Masak Chainage 0+000 - 2+200, Saburai Chainage 0+000 - 8+500 Municipality Bobonaro | 100.00 % |
| 1305 | P0833 | Rural Roads Routine Maintenance Uma Boco - Aubeon, Sta. 0+000 - 6+000, Manututo Municipality | 100.00 % |
| 1306 | P0832 | Rural Roads Rehabilitation Feriksare Chainage 4+300 - 6+350 Municipality Manufahi (162) | 100.00 % |
| 1307 | P0831 | Consulting Services for preparing of design the intersection in the existing Dili Liquixa Road to connect access Road From Tibar Bay Port (Preparasaun Desenho detalhado ba Estrada, Electricidade e Aguas ba Funcionamentu Portu Tibar ) | 100.00 % |
| 1308 | P0830 | R4D Rural Road Periodic Maintenance Libaloa - Fahilebo Chainage 0+000 - 7+000 & Fahilebo - Fatumasi Chainage 0+000 - 2+300 Routine Maintenance Fahilebo Bucumera Chainage 0+000 - 6+500 Municipality Liquica | 100.00 % |
| 1309 | P0829 | Rural Roads Periodic Maintenance Luihono - Osorua Chainage 0+000 - 6+800 Routine Maintenance Ossu - Nahareka Chainage 0+000 - 3+400 Municipality Viqueque (162) | 100.00 % |
| 1310 | P0828 | Manutensaun ba Drainage Matadouro Nacional Tibar Municipio Liquica (162) | 100.00 % |
| 1311 | P0827 | Construction of Mauma Bridge Appoach Protection : Ilimar - Uatucarbau Section ( A08 - 3 ) (162) | 100.00 % |
| 1312 | P0826 | Emergency Project at Capital Dili | 100.00 % |
| 1313 | P0825 | Emergency Project Limpeza Drainage Major de Cidade - Dili ( Adicional 10% ) | 100.00 % |
| 1314 | P0824 | Emergency Projecto Limpeza Drainage Major de Cidade de Dili | 100.00 % |
| 1315 | P0823 | Rural Road Periodik Maintenance Leguimea Chainage 0+000-2+100,Manusahe Chainage 0+000-3+000 Ermera Municipality | 100.00 % |
| 1316 | P0822 | Rural Road Periodik Maintenance Hera - Remexio Star 0+000 -10+400 Dili & Aileu Municipality | 100.00 % |
| 1317 | P0821 | Roads Maintenance Section Laga Baguia Municipality Baucau (162) | 40.00 % |
| 1318 | P0820 | Konstrusaun Sede Suku Builo | 100.00 % |
| 1319 | P0819 | Konstrusaun Edificio Posto Administrativo Uato-Carbau | 100.00 % |
| 1320 | P0818 | Konstrusaun Edificio Posto Administrativo Uatolari | 100.00 % |
| 1321 | P0817 | Konstrusaun ESTV Kaluheda - Viqueque (CC + CB) | 100.00 % |
| 1322 | P0816 | Konstrusaun Escola Secundaria Geral Uatolari | 95.42 % |
| 1323 | P0815 | Konsrusaun Estrada ba Uma TBC Centru Saude Munsipiu Manufahi | 100.00 % |
| 1324 | P0814 | Konstrusaun Pagar Keliling Stadion Ailuli (Same-Manufahi)-sealeloerfa | 100.00 % |
| 1325 | P0813 | Konstrusaun Pagar Keliling Stadion Ailuli (Same-Manufahi)-Leno Ana | 82.86 % |
| 1326 | P0812 | Konstrusaun Pagar Keliling Stadion Ailuli (Same-Manufahi)-Hathme | 100.00 % |
| 1327 | P0811 | Konstrusaun Pagar Keliling Stadion Ailuli (Same-Manufahi)-Tutur Bodik Tane Lisuk, Unip.Lda | 89.15 % |
| 1328 | P0810 | Konstrusaun Pagar Keliling Stadion Ailuli (Same-Manufahi)-yodafer | 89.87 % |
| 1329 | P0809 | Konstrusaun Pagar Keliling Stadion Ailuli (Same-Manufahi)-UNAMAR COMPANY | 89.30 % |
| 1330 | P0808 | Projecto Konstrusaun Bronjong & Normalizasaun Mota Clere ( Alas manufahi) Suco Dotik | 100.00 % |
| 1331 | P0807 | Konstrusaun Bronjong & Normalizasaun Mota Clere Weberek ( Alas - Manufahi ) Suco Dotik | 100.00 % |
| 1332 | P0806 | Konstrusaun Bronjong & Normalizasaun Mota Clere ( Alas - Suco Dotik ) A | 100.00 % |
| 1333 | P0805 | Konstrusaun Bronjong & Normalizasaun Mota Clere Weberek, Dotik - Alas Manufahi | 100.00 % |
| 1334 | P0804 | Konstrusaun Bronjong & Normalizasaun Mota Clere Weberek, Dotik - Alas Manufahi | 100.00 % |
| 1335 | P0803 | Konstrusaun Vedasaun No Jardim Edifisiu DNTPSC Same iha Suku Holarua | 100.00 % |
| 1336 | P0802 | Rehabilitasaun ESTV Akadiruhun No.2 ESTV (Refurbished Building RF3),Same-Manufahi | 100.00 % |
| 1337 | P0801 | Rehabilitasaun edificio No.2 ESTV Akadiruhun (Refurbished Building RF5) , Letefoho Same-Manufahi | 100.00 % |
| 1338 | P0800 | rehabilitacao edificio no.02 ESTV akadiruhun (Refurbished building RF7) | 99.27 % |
| 1339 | P0799 | Rehabilitasaun Edificio ESTV Acadiruhun No.02 ESTV Akadiruhun (Refurbished Building RF2) Same Manufahi | 100.00 % |
| 1340 | P0798 | Rehabilitacao edificio no.02 ESTV aikadiruhun (Refurbished building RF6) | 97.58 % |
| 1341 | P0797 | Konstrusaun Landscape Igreja Nossa Senhor Assunção Same | 92.45 % |
| 1342 | P0796 | Renovasi gereja paroquia nossa senhora assuncao same | 98.81 % |
| 1343 | P0795 | Projecto New Construction Bombeiros same -Manufahi | 88.85 % |
| 1344 | P0794 | Const. MCK (Saude) Orana | 75.00 % |
| 1345 | P0793 | Konstrusaun Centru Comunitariu Sede Aldeia Fanlelo | 88.53 % |
| 1346 | P0792 | Konstrusaun Tangki Beé no Menara Beé ba iha Edificio Administrasaun Municipiu Manufahi | 85.99 % |
| 1347 | P0791 | Konstrusaun Igreza Paroquia Nossa Senhora do Rosario de Fatima - Alas - Manufahi | 98.99 % |
| 1348 | P0790 | Kontinuasaun Konstrusaun ba Barreira Protesaun Uma Komunidade Laclo no Bomba Be'e Mos | 100.00 % |
| 1349 | P0789 | Continuacao e Finalizacao dos Acessores Monumentos Municipio Manatuto | 70.92 % |
| 1350 | P0788 | Continuacao Requalificacao do Jardim Onde se Localiza Monumento Municipal Manatuto | 88.07 % |
| 1351 | P0787 | Konstrusaun Sede Suku Sicone Diloli | 92.03 % |
| 1352 | P0786 | Konstrusaun Sede Suku Laicore | 100.00 % |
| 1353 | P0785 | Construction of Residense for Health Staff in Suku Aimeta Laran-Barique | 100.00 % |
| 1354 | P0784 | Konstrusaun Postu Saude Aimeta Laran-Barique | 100.00 % |
| 1355 | P0783 | Konstrusaun Rezidensia Pesoal Saude Iha iha Suku Funar - Laklubar | 100.00 % |
| 1356 | P0782 | Konstrusaun Posto Saude Iha iha Suku Funar - Laklubar | 23.05 % |
| 1357 | P0781 | Konstrusaun Edificio Posto Administrativo Laleia | 100.00 % |
| 1358 | P0780 | Konstrusaun Edificio Posto Administrativo Laclo | 100.00 % |
| 1359 | P0779 | Konstrusaun ESTV Manlala-Posto Adm Soibada Municipio de Manatuto | 100.00 % |
| 1360 | P0778 | Konstrusaun ESTV Beadi-Manatuto | 92.91 % |
| 1361 | P0777 | Kontinuasaun Konstrusaun Barreira Protesaun Uma Komunidade Laclo No Bomba We Mos Aldeia Hahihoho | 100.00 % |
| 1362 | P0776 | Konstrusaun Mercado Komunitaria Kikan Ilimano | 100.00 % |
| 1363 | P0775 | Kontinuasaun Konst. Postu Saude Iha Suku Fatumakerek | 73.14 % |
| 1364 | P0774 | Konstrusaun Edificio Posto Administrativo Liquica | 96.02 % |
| 1365 | P0773 | Konstrusaun ESTV Lisadila Maubara-Liquisa (CA + CB) | 96.74 % |
| 1366 | P0772 | Novo Kontrusaun Edificio Escola Tecnico Vocational (ES-TECVOC) Maumeta) | 95.68 % |
| 1367 | P0771 | Konstrusaun postu saude no residencia medico iradarate posto administrativo iliomar | 98.44 % |
| 1368 | P0770 | Konstrusaun ESKOLA BASIKU FILIAL BOBOIRA-POSTO ADMINISTRATIVU LURO | 100.00 % |
| 1369 | P0769 | Konstrusaun Edificio no Moru Administrasaun Posto Administrativo Luro | 99.57 % |
| 1370 | P0768 | Konstrusaun Bronjong iha Mota Hare | 100.00 % |
| 1371 | P0767 | Reabilitasaun Postu Saude no Uma Doutor Suku Parami | 90.59 % |
| 1372 | P0766 | Konstrusaun Foun Centro Saude Comunitario Hatolia B, Suco Fatubesi, Posto Administrativo Hatolia | 100.00 % |
| 1373 | P0765 | Konstrusaun foun Edificio Administrasaun Posto Railaco, suco lihu,posto railaco | 100.00 % |
| 1374 | P0764 | Konstrusaun foun posto saude no uma doutor suco baboi leten | 97.31 % |
| 1375 | P0763 | Konstrusaun Foun Posto Sude no Uma Doutor Suco Samalete, Posto Administrativo Railaco | 93.76 % |
| 1376 | P0762 | Konstrusaun foun postu saude no uma doutor suco malabe | 100.00 % |
| 1377 | P0761 | Konstrusaun fou postu saude no uma doutor, suco atara, posto administrativo Atsabe | 98.50 % |
| 1378 | P0760 | Construction of Health Post and Residence for Health Staff in Suku Lisapat | 100.00 % |
| 1379 | P0759 | Konstrusaun foun postu saude no uma doutor suco leimea sorin balu | 96.14 % |
| 1380 | P0758 | Konstrusaun Foun Escola Tekniku Vokasional, Suco Lihu, Railaco | 96.79 % |
| 1381 | P0757 | Konstrusaun Foun Eskola Tekniko Vokasional Gleno, Suku Talimoro, Posto Administrativo Ermera | 95.77 % |
| 1382 | P0756 | Reabilitasaun Be'e Mos no Konstrusaun Foun Tanki Reservatoriu Suku Lihu 5 km | 70.00 % |
| 1383 | P0755 | Konstrusaun Edifisiu Foun ba Diresaun Aprovizionamentu Finansas e Fiskalizasaun | 99.70 % |
| 1384 | P0754 | Konstrusaun Sede Suku Manleuana | 99.33 % |
| 1385 | P0753 | Konstrusaun Sede Suku Madohi | 97.52 % |
| 1386 | P0752 | Konstrusaun Sede Suku Bebonuk | 98.45 % |
| 1387 | P0751 | Konstrusaun Sede Suku Ailok | 27.92 % |
| 1388 | P0750 | Rehabilitasaun ESTV Comercio E Economia | 100.00 % |
| 1389 | P0749 | Rehabilitasaun Konstrusaun ESTV 28 Novembro - Dili (Rf) | 98.60 % |
| 1390 | P0748 | Rehabilitasaun no Konstrusaun Jardim Kristo Rei | 75.00 % |
| 1391 | P0747 | Konstrusaun EBF Camanassa | 100.00 % |
| 1392 | P0746 | Konstrusaun Eskola Basika Filial Purbiti - iha ILA | 99.95 % |
| 1393 | P0745 | Construction of Health Post and Residence for Health Staff in Suku Beiseuk | 98.57 % |
| 1394 | P0744 | Konstrusaun Edificio Posto Saude No Konstrusaun Recidensia Mediku Nanu-Fatumea | 96.66 % |
| 1395 | P0743 | Konstrusaun edifisiu postu saude no konstrusaun residencia mediku Fatulelo | 98.46 % |
| 1396 | P0742 | Konstusaun Edifisiu Postu Saude no Konstrusaun Residensia Mediku Lepo | 98.96 % |
| 1397 | P0741 | Konstrusaun ESTV Acarlaran Suai - Covalima (CA + CB) | 100.00 % |
| 1398 | P0740 | Konstrusaun Eskola Tekniko Professional Zumalai | 96.79 % |
| 1399 | P0739 | Nova Konstrusaun Posto Saude Gildapil | 97.81 % |
| 1400 | P0738 | Nova konstrusaun residencia pessoal saude Lupal Lolotoe | 93.90 % |
| 1401 | P0737 | Nova Construsaun posto saude Lupal-Lolotoe | 93.59 % |
| 1402 | P0736 | Nova konstrusaun residensia pessoal saude dau-udo cailaco | 94.62 % |
| 1403 | P0735 | Nova Konstrusaun Postu Saude Dau-udo Cailaco | 92.22 % |
| 1404 | P0734 | Nova Konstrusaun Residencia Pessoal Saude Manapa - Cailaco | 97.25 % |
| 1405 | P0733 | Nova Konstrusaun Posto Saude Manapa - Cailaco | 92.65 % |
| 1406 | P0732 | Construction of Residence for Health Staff in Suku Molop | 68.30 % |
| 1407 | P0731 | Construction of Health Post in Suku Molop | 35.91 % |
| 1408 | P0730 | Nova Konstrusaun Eskola Tekniko Vocasional Malibaka-Maliana (CA + CB) | 98.39 % |
| 1409 | P0729 | Konstrusaun ESTV Atabae-Bobonaro (CA + CB) | 100.00 % |
| 1410 | P0728 | Rehabilitasaun Edificio Administrasaun Municipiu Bobonaro | 71.47 % |
| 1411 | P0727 | Konstrusaun EBF Publiku Selegua | 100.00 % |
| 1412 | P0726 | Kontinuasaun Konstrusaun Merkadu Munisipal Baucau Villa | 100.00 % |
| 1413 | P0725 | Ateru SAMES | 100.00 % |
| 1414 | P0724 | Konstrusaun Posto Administrativo Baguia | 100.00 % |
| 1415 | P0723 | Konstrusaun Rede Haleo Armazen SAMES Municipio Ainaro no Nahe Pavin iha Armazen Oin | 99.96 % |
| 1416 | P0722 | Konstrusaun Site Work Armazen SAMES Munisipiu Ainaro | 100.00 % |
| 1417 | P0721 | Konstrusaun Edificio Posto Administrativo Maubisse | 100.00 % |
| 1418 | P0720 | Konstrusaun Edificio Posto Administrativo Hatubuilico | 100.00 % |
| 1419 | P0719 | Konstrusaun ESTV Bermoli Maulau Maubisse - Municipio Ainaro (CA + CB) | 99.77 % |
| 1420 | P0718 | Konstrusaun Eskola Sekundaria Tekniko (EST) Ainaro (CA + CB) | 100.00 % |
| 1421 | P0717 | New Construction of Retaining Wall and Drainage Suco Manulobas - Maubisse | 100.00 % |
| 1422 | P0716 | Reabilitasaun Edifisiu ADN Munisipiu Ainaro | 100.00 % |
| 1423 | P0715 | Rehabilitasaun Edificio Administrasaun Municipio Ainaro | 0.00 % |
| 1424 | P0714 | Konstrusaun Postu Saude no Uma Doutor iha Suku Manutasi | 100.00 % |
| 1425 | P0713 | Construsaun Escola Basica Filial hatumeta udo ( Manutasi) | 100.00 % |
| 1426 | P0712 | Konstrusaun Edificio Posto Administrativo Remixio | 93.14 % |
| 1427 | P0711 | Konstrusaun Edificio Posto Administrativo Laulara | 96.89 % |
| 1428 | P0710 | Manutensaun Edificio MSSI | 90.82 % |
| 1429 | P0709 | Manutensaun Edificio MSSI | 92.47 % |
| 1430 | P0708 | Manutensaun Edificio MSSI | 94.01 % |
| 1431 | P0707 | New Construction of Entry Gate and Wall Protection Works for Garden of Herois in Lugasa Uatulari | 1.86 % |
| 1432 | P0706 | Projectu Rehabilitasaun Edificio CDSS - Liquisa (Ex. Pantai Asuhan) | 96.59 % |
| 1433 | P0705 | Rehabilitation of MSS Office in Aileu | 100.00 % |
| 1434 | P0704 | Konstrusaun Edificio CDS Lospalos Inklui Armagem no pavimento | 96.29 % |
| 1435 | P0703 | Continuation of New Construction for Tomb of Nicolau Lobatu, Ante Room, Totunda and Terace and pump House | 100.00 % |
| 1436 | P0702 | New Construction of WareHouse, Campas, Raodway, Drainage and Pavement at Jardim dos Herois Metinaro | 100.00 % |
| 1437 | P0701 | New Construction of Garden for Herois in Quelecai - BAUCAU | 90.01 % |
| 1438 | P0700 | New Construction of Transmitter Room in Kutulau-Bazartete | 95.09 % |
| 1439 | P0699 | Rehabilitation of Houses RTTL in Caicoli and Biterlau | 100.00 % |
| 1440 | P0698 | Rehabilitasaun Residencia Vice Presidente Parlamentu Nacional iha Farol | 100.00 % |
| 1441 | P0697 | Rehabilitation and maintenance of Sitius Turistiku Sao Joao Paulo II iha Tasi tolu | 100.00 % |
| 1442 | P0696 | Rehabilitation and Maintenance of Largo de Lecidere | 94.24 % |
| 1443 | P0695 | Rehabilitation of Tourism Place at Cristo rei | 95.25 % |
| 1444 | P0694 | Rehabilitation and Maintenance of Jardim 12 de Novembro at Motael | 98.48 % |
| 1445 | P0693 | Rehabilitation of Pousada Maubisse-Municipio Ainaro | 85.96 % |
| 1446 | P0692 | Rehabilitation of Behau Mini Tradisional Food | 38.83 % |
| 1447 | P0691 | Rehabilitasaun of Cairabela Mini Tradisional Food in Vemasse | 67.74 % |
| 1448 | P0690 | Rehabilitasaun Pousada Hatobuilico | 87.24 % |
| 1449 | P0689 | Rehabilitasaun Merkadu Tradisional iha Fronteira Salele- Suai- Covalima | 100.00 % |
| 1450 | P0688 | Fencing for Construction Monumento do Dom Boa Ventura | 79.86 % |
| 1451 | P0687 | Rehabilitation of GDD Sports Indoors | 87.48 % |
| 1452 | P0685 | Konstrusaun Edificio servisu espesializada iha PGR Colmera | 100.00 % |
| 1453 | P0684 | Konstrusaun foun ba Edificio procuradoria Distrital, Residente no Edificio ba Apoio nian iha Suco Fuiloro, Municipio Lautem | 98.52 % |
| 1454 | P0683 | New Construction of faculdade de Medicina Ciencia da Saude Building | 99.52 % |
| 1455 | P0682 | New Construction of Faculdade Econimia e Gestao Building | 98.98 % |
| 1456 | P0681 | New Construction of Administration and Logistic Building | 97.28 % |
| 1457 | P0680 | Manutensaun Expert Room iha MESCC | 97.00 % |
| 1458 | P0679 | Rehabilitasaun Edificio iha MESCC | 96.95 % |
| 1459 | P0678 | Konstrusaun escola basica filial Nala Op Zumalai (162) | 99.94 % |
| 1460 | P0677 | R&M Building Coby House DNIE & INSPETORIA (162) | 89.29 % |
| 1461 | P0676 | Rehabilitasaun Jardim Infordepe (162) | 95.64 % |
| 1462 | P0675 | R&M Building Eskola EBC Ossu Huna Baguia-Baucau (162) | 100.00 % |
| 1463 | P0674 | Konstrusaun Eskola EBC 1035 Lolotoe (162) | 99.00 % |
| 1464 | P0673 | Konstrusaun Eskola Eubere iha Quelekai-Baucau (162) | 95.49 % |
| 1465 | P0672 | Konstrusaun EBF Manu Aman iha Maliana (162) | 99.26 % |
| 1466 | P0671 | Konstrusaun Pre-Eskolar Iliomar - Lautem (162) | 94.62 % |
| 1467 | P0670 | Konstrusaun Foun Ba Edificio Escritorio Edukasaun Manatuto | 97.89 % |
| 1468 | P0669 | Konstrusaun Monumento Nino Konis Santana no Jardim iha Escola Secundaria Nino Konis Santana Publica LAUTEM | 95.72 % |
| 1469 | P0668 | Rehabilitasaun Eskola Sekundariu Tekniku Vokasional Agricola Horai kiik,Maubisse ainaro | 99.95 % |
| 1470 | P0667 | Escola Secundaria Tekniko Vocasional 28 de Novembru iha Becora | 65.56 % |
| 1471 | P0666 | Rehabilitasaun Escola Teknika Professional Dom Bosco Maumali - Maliana (Rehabilitasaun Dormitorio Feminino, Reparasaun Cozinha no Reparasaun Central Electrica) | 60.00 % |
| 1472 | P0665 | Rehabilitasaun no Manutensaun Escola Basica Filial No.256 Lesu Sub Distrito Hatu Udo | 100.00 % |
| 1473 | P0664 | Rehabilitasaun & Extensaun Laboratorio Nacional Bidau - Dili | 91.23 % |
| 1474 | P0663 | Retensaun ba Edificio Prisaun Covalima | 100.00 % |
| 1475 | P0662 | Construcao do novo edificio da defensoria publica do Municipio de Ermera | 94.25 % |
| 1476 | P0661 | Rehabilitasaun Edificio Ministerio Interior | 100.00 % |
| 1477 | P0660 | Rehabilitation of Building for Minister of Interior | 97.74 % |
| 1478 | P0659 | Construção Pure Hindu Taibesi | 79.68 % |
| 1479 | P0658 | Konstrusaun Escola de Musica iha fatumeta | 60.88 % |
| 1480 | P0657 | New Construction of An'Nur Orphanage Building | 80.83 % |
| 1481 | P0656 | Konstrusaun Igreza Sagrada Corasaun de Jesus Becora | 100.00 % |
| 1482 | P0655 | Konstrusaun Igreza Paroquia Zumalai | 96.33 % |
| 1483 | P0654 | New Construction of Sao Jose Aimutin Church in Comoro | 72.33 % |
| 1484 | P0653 | Konstrusaun Igreza Nossa Senhora Imaculada da Conceicao Bobonaro | 43.60 % |
| 1485 | P0652 | New Construction of Auditorium (Salaun Paroquial) & Class Room & landscape of Catedral. Vila Verde | 94.30 % |
| 1486 | P0651 | Install Medium Voltage Line, New Transformer & Extend LV Line For Posto Militar F-FDTL, Atauro, Dili Municipality | 100.00 % |
| 1487 | P0650 | Manutensaun Residencia C.E.M.G. das F-FDTL | 87.83 % |
| 1488 | P0649 | Manutensaun Edificio Ministerio da Defesa | 96.06 % |
| 1489 | P0648 | Separasaun ba Aula Tolu iha Ministerio da Defesa | 100.00 % |
| 1490 | P0647 | Rehabilitation of Office, Laundry, Barracks, Chapel, Kitchen and Toilets in Metinaro (CFT Base) | 100.00 % |
| 1491 | P0646 | Construction of Kitchen and Refectory at Componete do Apoio de Serviso (CAS) iha Metinaro | 100.00 % |
| 1492 | P0645 | Maintenance and Repair at F-FDTL, Head Qaurtel, Fatuhada | 90.57 % |
| 1493 | P0644 | Rehabilitasaun Rescidence Ministro da Defesa | 94.92 % |
| 1494 | P0643 | Rehabilitasaun Edificio Conselho de Empresa | 95.43 % |
| 1495 | P0642 | Detailed Engineering design of E-Recruitment Building CFP | 100.00 % |
| 1496 | P0641 | Rehabilitation of existing office and Security fencing of Baucau Airport | 100.00 % |
| 1497 | P0640 | Rehabilitation of Medical Record at HNGV | 100.00 % |
| 1498 | P0639 | New Construction of Road ( Km 0+000-0+441, Becora Roads 441m ) | 100.00 % |
| 1499 | P0638 | New Construction of 8 Houses and rehabilitation of 3 House in My Friend (Santa Cruz) and Becusi Dili | 100.00 % |
| 1500 | P0637 | Rehabilitation of fronteira tasi Timor office | 88.25 % |
| 1501 | P0636 | New Construction of futsal yard Bidau and aditional construction of toilet and roof in Bj Habiebie , Dili Municipality | 100.00 % |
| 1502 | P0635 | Konstrusaun Barreira Iha Mota Mola Hodi Proteze Komunidade Nahgidal-Zumalai | 100.00 % |
| 1503 | P0634 | Konstrusaun Kampo Multifunsaun Iha Lakonak-Covalima | 99.87 % |
| 1504 | P0633 | Prefurasaun No Kanalizasaun Bee Mos Iha Aldeia Gala | 100.00 % |
| 1505 | P0632 | Rehabilitation of monument massacre setembro negro 1999 in suai covalima | 94.52 % |
| 1506 | P0631 | Rehabilitation of water supply network in suco colacao-Manufahi | 85.10 % |
| 1507 | P0630 | Rehabilitation of clinic of RuinTohar in Wedauberek | 99.56 % |
| 1508 | P0629 | Design and Build of presbiterian Emmanuel Church Building, Same | 96.13 % |
| 1509 | P0628 | New Construction of Monument Massacre Meti Oan in Alas Wedauberek | 97.51 % |
| 1510 | P0626 | New Gabion Works Flood Control Mota Kaikaslara-Aldeia Cotalara Suku Loidahar Liquisa | 100.00 % |
| 1511 | P0625 | Construction od New Gabion Work at Watupo'o River in Liquisa | 100.00 % |
| 1512 | P0624 | Kanalizasaun Be Mos ho Sistema Gravitasaun Iha Aipelo-Liquisa | 92.14 % |
| 1513 | P0623 | Konstrusaun Kapela Haupu-Ermera | 100.00 % |
| 1514 | P0622 | New Construction of Mertutu, Chapel in Ermera | 100.00 % |
| 1515 | P0621 | Construction of Clinic at centro de Saude Madre Cecilia do Santos-Maliana | 96.46 % |
| 1516 | P0620 | New Construction of Dining Hall of UPF at Batugade Maliana-Bobonaro | 96.90 % |
| 1517 | P0619 | New Construction of Saude Ware House in Maliana | 97.13 % |
| 1518 | P0618 | Konstrusaun Moru hodi Proteze Uma ba Madre PAR iha Ossqueli | 100.00 % |
| 1519 | P0617 | Rehabilitasaun Estrada ba Preparasaun Ceremonia 30 de Agusto iha Tasi Tolu | 100.00 % |
| 1520 | P0616 | Preparasaun Fatin ba Ceremonia 30 de Agusto iha Tasitolu-Dili | 100.00 % |
| 1521 | P0615 | Landscape Garden of B.J. Babibie in Bidau Santana | 97.35 % |
| 1522 | P0614 | New Construction of Becora-Camea bridge and Access Road | 100.00 % |
| 1523 | P0613 | Urgent Rehabilitation of Road at Balibar | 100.00 % |
| 1524 | P0612 | Repairing and Maintenance and Operation Of National Hero Monument Nicolau Lobato In Comoro and Monument Fransisco Xavier In Caicoli- Merkadu Lama | 98.10 % |
| 1525 | P0611 | Espasu Ba MPIE Office ( New Construction Ba MPIE Office) | 100.00 % |
| 1526 | P0610 | New Construction and Rehabilitation of EBF Motaquic School-Hera | 97.85 % |
| 1527 | P0609 | New Construction of Mini Laboratory in Centru Saude Vera Cruz | 99.25 % |
| 1528 | P0608 | New Construction Of Houses For Veterant 17 Unit | 100.00 % |
| 1529 | P0607 | Rehabilitasaun no manutensaun ex edificio diresaun geral organizasaun urbana | 100.00 % |
| 1530 | P0606 | Minor Rehabilitasaun Works of DNMG ofice in Dili | 100.00 % |
| 1531 | P0605 | New Construction of Toilet Facilities and Rehabilitation of Brake Test Car at DNTT Akanuno | 88.52 % |
| 1532 | P0604 | Construction of Terminal in Tasi Tolu | 66.17 % |
| 1533 | P0603 | Instalacao Electricidade Linha Distribuicao ba uma (Energia Eletricidade ba Sistema Bomba Be'e ) ba Comunidade Loiubu (Watulari) | 79.32 % |
| 1534 | P0602 | Instalacao Electricidade Linha Medium Voltagem & Transformer Ba Comunidade (Energia Eletricidade ba Sistema Bomba Be'e Mos) ba Comunidade Fatulia Watuhaco & Waihaia (Venilale) | 48.18 % |
| 1535 | P0601 | Instalacao Electricidade Linha Distribuicao ba Uma (Energia Electricidade ba Sistema Bomba Be'e) ba Comunidade Ostiko (Vemase) | 100.00 % |
| 1536 | P0600 | Installation of Street Lights Prizaun Becora-Culuhun California (Lot 2)/162 | 93.48 % |
| 1537 | P0599 | Installation of Street Lights Becora Estasaun Polisia-Becusi-Thaibesi(Lot 4) | 100.00 % |
| 1538 | P0598 | Installation of Street Lights Faulara-Bebonuk (Lot 8) | 100.00 % |
| 1539 | P0597 | Lot 1 Urgent Installation of Street Lights in Mota Ulun-Bedois-Benamauk,Dili | 75.91 % |
| 1540 | P0596 | Installation of Street Lights Lecidere -Acadiruhun-Acait (Lot 6) | 70.12 % |
| 1541 | P0595 | Installation of Street Lights Culuhun California-Bemori (Lot 3)/162 | 100.00 % |
| 1542 | P0594 | Installation of Street Lights Kuluhun-Ailelehun-Tokobaru (Lot 5) | 100.00 % |
| 1543 | P0593 | Installation of Street Lights Cruzamento Halilaran-Rotunda Elemloi-Canossa (Lot 9) | 100.00 % |
| 1544 | P0592 | Installation of Street Lights Akadiruhun-Audian Bundaran CCD-Resende (Lot 7) | 100.00 % |
| 1545 | P0591 | New Installation of Electricity Service (Transformer) | 100.00 % |
| 1546 | P0590 | Operation And Maintenance Services For National Power Grid Project | 67.69 % |
| 1547 | P0589 | The Integrated and Maintenance Service | 70.88 % |
| 1548 | P0588 | Perfurasaun Sistema Be'e Mos Iha suco carau Balu | 35.43 % |
| 1549 | P0587 | New Construction of Fance in Mini substation EDTL Tibar | 90.27 % |
| 1550 | P0586 | Konstrusaun sistema bee mos iha aldeia Biabuti suco Leimeia posto administrativo atsabe /162 | 100.00 % |
| 1551 | P0585 | Melhoramento sistema bee mos no instalasaun metro kontador iha suco ritabou, odomau no raifun PA /162 | 98.54 % |
| 1552 | P0584 | Rehabilitation Interior of Meeting Room MNEC | 100.00 % |
| 1553 | P0583 | Construction of extension office building of the Minister of Public works (162) | 100.00 % |
| 1554 | P0582 | Rehabilitation of DNA MOP Cobe House in Caicoli Dili | 97.17 % |
| 1555 | P0581 | Melhoramento Kanu Transmisaun no Distribuisaun iha Asumaten Lokeu Munisipiu Covalima / 162 | 44.27 % |
| 1556 | P0580 | Novo construsaun do campo polisportivo do Ministerio das Obras publicas (162) | 100.00 % |
| 1557 | P0579 | Manutensaun iha edificio Ministerio da Administrasaun Estatal | 100.00 % |
| 1558 | P0578 | Konstrusaun Moru Hadulas Bomba fomentu /162 | 100.00 % |
| 1559 | P0577 | Konstrusaun Moru Hadulas Bomba Bidau /162 | 100.00 % |
| 1560 | P0576 | Melhoramento taratamento dezalinasaun iha manleu Metinaro /162 | 87.07 % |
| 1561 | P0575 | Perfurasaun Sistema Be'e Mos Iha Area Comoro DMA 37 /162 | 100.00 % |
| 1562 | P0574 | Manutensaun ba Edificio DNGRA-MOP / 162 | 99.31 % |
| 1563 | P0573 | Urgencia Manutensaun no Rehabilitasaun Palacio Nobre Lahane | 100.00 % |
| 1564 | P0572 | Rehabilitasaun Tanke Reservatoriu iha Asgor no Bidau Masaur/ 162 | 51.65 % |
| 1565 | P0571 | Urgent Repair of Roof Leaks at the New Building Ministry of Finance RDTL | 88.17 % |
| 1566 | P0570 | Melhoramento sistema Be'e mos husi tangki Lesuboten pemancar RTTL troka kanu tuan no installasaun 1000 metro kontador iha Lahomea, Holsa, Ritabou no Odomau Postu Administrativu Maliana Municipio Bobonaro | 95.01 % |
| 1567 | P0569 | Kontinuasaun Fase II Construsaun Reservatorio, Installasaun Kanu Transmisaun e Distribuisaun iha Multy Aldeia Suku Debos - Covalima | 19.26 % |
| 1568 | P0568 | Installasaun Be'e mos iha Balibo Villa Municipio Bobonaro | 99.99 % |
| 1569 | P0567 | Prefurasaun Sistema Be'e mos iha Suku PA'Papa Postu Adm. Lospalos Vila | 80.38 % |
| 1570 | P0566 | Rehabilitasaun Sistema Be'e mos iha Aldeia Mota Ulun Hospital Militar e Gomes Araujo LAHANE | 100.00 % |
| 1571 | P0565 | Prefurasaun Be'e mos iha Suku Uma Berloik, Aldeia Besusu | 100.00 % |
| 1572 | P0564 | Rehabilitasaun no Installasaun Metro Contador Sistema Be'e mos iha Perumnas Bairo Pite (162) | 93.72 % |
| 1573 | P0563 | Konstrusaun Be'e mos sistema gravitasaun ba Aldeia Loodasi / Polo | 97.89 % |
| 1574 | P0562 | Projecto DNSA Leakage Control in City of Dili | 26.68 % |
| 1575 | P0561 | Melhoramento Sistema Beé mos iha Area Delta 1,2,3 no 4 | 100.00 % |
| 1576 | P0560 | Installasaun Be'e mos ho sistema Grafitasaun iha Suku Laline / Luha Raikuak - Lakluta - Viqueque | 74.13 % |
| 1577 | P0559 | Installasaun Be'e mos iha Aldeia Aitos, Suco Datorua, Posto Administrativo Fohorem, Municipio Covalima | 54.96 % |
| 1578 | P0558 | Construction of DNEPCC Office Building in the Municipality of Ainaro | 97.16 % |
| 1579 | P0557 | Prefurasaun Be'e mos iha Area Tuana Laran - Matadouro Suku Vila verde, Postu Administrativo Vera Cruz - Municipiu Dili | 100.00 % |
| 1580 | P0556 | Konstrusaun Muda Linha Kanu Transmisaun husi Mota Ergogro ba Tanki Reservatoriu Riheu iha Municipiu Ermera | 100.00 % |
| 1581 | P0555 | Konstrusaun Beé mos ba Residencia Sr. Jeneral F-FDTL no Sr. Lu Olo iha Manleuana | 56.89 % |
| 1582 | P0554 | Rehabilitation of Palacio Nobre Lahane | 95.43 % |
| 1583 | P0553 | Construction of Membrane Tent and Shaded Area of SG-MOPTC | 91.14 % |
| 1584 | P0552 | Installation of Transmission Line, Distribuition Panel & Transformer in Taibesi and Becora | 97.82 % |
| 1585 | P0551 | Rehabilitation of DNEPCC Office Building in Aileu | 99.54 % |
| 1586 | P0550 | Rehabiltation Of MPWTC Office in the Municipality of Baucau | 100.00 % |
| 1587 | P0549 | Rehabilitasaun Uma Operador no hadia jardim iha estasaun Bomba Comoro C. Suco Comoro | 35.77 % |
| 1588 | P0548 | Installatio of Transmission Line GSDN 100mm, including pipe conection to Becora Prison, Construction of Fence Surrounding the Pump & Installation Electricity in Panel House of Suco Camea | 81.39 % |
| 1589 | P0547 | Rehabilitation of Security Post Building in Caicoli MPW | 76.91 % |
| 1590 | P0546 | R4D MPW Rural Roads Rehabilitation Project in Bobonaro Municipality Meligo - Goulolo Chainage 0+000 - 2+600 | 100.00 % |
| 1591 | P0545 | Rural Roads Periodic Maintenance Letefoho - Sorimbalu Chainage 0+000 -10+500 Municipality Ermera | 100.00 % |
| 1592 | P0544 | Rural Roads Periodic Maintenance Lihu - Samalete Chainage 6+300 - 13+800 Municipality Ermera | 100.00 % |
| 1593 | P0543 | Rural Roads Periodic Maintenance Lauana - Leimea Leten Chainage 0+000 - 10+800 Municipality Ermera | 100.00 % |
| 1594 | P0542 | Rural Road Maintenance in Dili Dare - Lelaus Road Sta. 0+000 - 5+000 Municipality Dili | 100.00 % |
| 1595 | P0541 | Rural Roads Periodic Maintenance Aituhaularan - Manufoni Chainage 0+000 - 1+000 and Daisoli - Fatubosa Chainage 0+000 - 7+300, Routine Maintenance Coula Udo Kirlelo Chainage 0+000 - 7+000 Municipality Aileu | 100.00 % |
| 1596 | P0540 | Rural Roads Routine Maintenance Uma Boco - Aubeon, Sta. 0+000 - 6+000, Manututo Municipality (Manutensaun) | 100.00 % |
| 1597 | P0539 | Rural Roads Periodic Gunaba - Lukulai Chainage 0+000 & Metagou - Aibenu Chainage 0+000 - 7+600 Rutine Maintenance Taltabi - Kutulau Chainage 0+000 - 1+700 Municipality Liquica | 100.00 % |
| 1598 | P0538 | Rural Roads Routine Maintenance Ainaro - Maununo Star 0+000 - 5+500, Mau Ulo - Lau Star 0+000 - 1+200 | 100.00 % |
| 1599 | P0537 | Rural Roads Routine Maintenance Dootic Weberek, Chainage 0+000 - 6+300, Dootic Wekakaoan, Chainage 0+000 - 8+600, Tukunu Feriksare, Chainage 0+000 - 4+300 Municipality Manufahi | 100.00 % |
| 1600 | P0536 | Rural Roads Maintenance Same - Rotuto Chainage 1+700 - 12+000 and Ladaki Chainage 0+000 - 1+200 Municipality Manufahi | 86.31 % |
| 1601 | P0535 | R4D Rural Road Periodic Maintenance Aibenu - Asumanu Chainage 0+000 - 4+300 Rutine Maintenance Dato - Liquica - Loidahar Chainage 0+000 - 12+300 Municipality Liquica | 100.00 % |
| 1602 | P0534 | Rural Roads Periodic Maintenance Samaguia - Namanei Chainage 0+000 - 7+000 Municipality Baucau | 100.00 % |
| 1603 | P0533 | Rural Roads Periodik Maintenance Dare - Mauchiga Sta. 0+000 - 5+000 Municipality Ainaro | 100.00 % |
| 1604 | P0532 | Rural Road Rehabilitation Metagou Bazartete 0+000 - 3+000 & Periodic Maintenance Maumeta - Metagou Sta. 0+000 - 7+000 Municipality Liquica | 100.00 % |
| 1605 | P0531 | Road Maintenance Section Casa Aiasa ( A13 ) 25.1 km in Municipality Ainaro (162) | 100.00 % |
| 1606 | P0530 | Rural Roads Periodik Maintenance Maubisse - Urlephha Star 0+000 - 3+000 Ainaro Municipality | 100.00 % |
| 1607 | P0529 | Rural Roads Periodik Maintenance Liurai - Fatubosa Sta. 0+000 - 3+000 Municipality Ainaro | 100.00 % |
| 1608 | P0528 | Rural Roads Periodik Maintenance Liurai - Hatubuilico Sta. 0+000 - 5+600 Municipality Ainaro | 95.30 % |
| 1609 | P0527 | Rural Roads Maintenance Manico - Gruto, Chainage 0+000 - 11+200 km Municipality Manufahi | 100.00 % |
| 1610 | P0526 | Rural Roads Periodik Maintenance Maubisse - Liurai Sta. 0+000 - 10+200 Municipality Ainaro | 100.00 % |
| 1611 | P0525 | Routine Maintanance Tibar Gleno - Emmera ( A04 ), 41.5 km Municipality Ermera (162) | 100.00 % |
| 1612 | P0524 | R4D Rural Road Maintenance Fahisoi - Fadabloko Chainage 0+000 - 8+200, Namalesu - Faturilau Chainage 0+000 - 12+500, Fahisoi - Dairlouta Chainage 0+000 - 2+600 and Hautoho - Lequica Chainage 0+000 - 2+500 Municipality Aileu | 100.00 % |
| 1613 | P0523 | R4D MPWTC rural road routine maintenance municipality of Ainaro Package 1 Maubisse - Liurai 0+000 - 10+200, Liurai - Hatobuilico Sta. 0+000 - 5+600, Dare - Mauchiga Sta. 0+000 - 5+000, Fatubosa - Liurai Sta. 0+000 - 3+100 | 35.71 % |
| 1614 | P0522 | Rural Roads Routine Maintenance Lepo-Lour Sta 0+000-3+000, Naguidal - Lour Sta 0+000-5+000, Boardikun - Mape Sta 0+000-8+000 / 162 | 100.00 % |
| 1615 | P0521 | Rural Roads Maintenance Fahisohi - Fadabloco Sta 0+000-8+200, Hotoho - Liquica Sta 0+000 - 2+500 and Laulara - Ornai Sta 0+000 - 7+500 in Aileu Municipality | 100.00 % |
| 1616 | P0520 | Rural Roads Routine Maintenance Letefoho-Sorimbalu Sta 0+000-10+500, Manusahe Sta 0+000-3+000, Leguime Sta 0+000-2+100, Raiheu Sta 0+00-6+000 | 100.00 % |
| 1617 | P0519 | Rural Roads Routine Maintenance Luihomo - Osorua Sta 0+000-6+800, Barialarang - Bikarin Sta 0+000-5+000, Viqueque Municipality | 100.00 % |
| 1618 | P0518 | Rural Roads Routine Maintenance. Atsabe - Laubono Sta 0+000+11+600, Lauana - Leimea Sta. 0+000-9+800 | 100.00 % |
| 1619 | P0517 | Rural Roads Routine Maintenance Lookeu Sta 0+000-6+000, Casabau 08 Sta 0+000-3+000, Casabau 012 Sta 0+000-3+500, Casabau 018 Sta 0+000-2+700, Lauwala Sta 0+000-3+500) | 100.00 % |
| 1620 | P0516 | Rural Roads Routine Maintenance Ainaro - Maununo Sta 0+000-5+500, Dare - Mauchiga Sta 0+000-5+000, Mau Ulo - Lau Sta 0+000-1+200, Ainaro Municipality | 100.00 % |
| 1621 | P0515 | Rural Road Rutine Maintenance of Dato Loidahar Sta. 0+000 - 12+300 and Asumanu Leorema Sta 0+000 - 400 Liquica (162) | 100.00 % |
| 1622 | P0514 | Rural Road Rutine Maintenance of Maumeta Metagou - Gunaba - Lukulai Taltabi - Kutulau Liquica | 100.00 % |
| 1623 | P0513 | Rutine Maintenanec of Fahilebu - Bucumera Sta. 0+000 - 6+500, Fahilebu - Fatumasi Sta. 0+000 - 2+300, Leboloa - Fahilebu Sta. 0+000 - 6+400 liquica | 100.00 % |
| 1624 | P0512 | Rural Roads Routine Maintenance Belakulidu - Laberlaka Sta 0+000 - 5+400, Nunuleta - Darulema Sta 0+000-1+600, Vaviquenia - Maubaralisa Sta 0+000-12+500, Liquica Municipality | 100.00 % |
| 1625 | P0511 | Rural Roads Routine Maintenance 1. Coulau Udo - Kirlelo Sta 0+000 - 7+000, Daisoli - Fatubosa Sta 0+000 - 7+300 and Aituhularan - Manufoni Sta 0+000 - 1+000 in Aileu Manicipality | 100.00 % |
| 1626 | P0510 | Rehabilitation and Maintenance of Tower N61 and N62 in Maliana | 100.00 % |
| 1627 | P0509 | R4D MPW Rural Roads Maintenance Project in Lautem Package 1 Dasidara (Sta.0+000-10+000), Luro-Barikafa (sta.0+000-7+000), Lospalos-Souru (sta.0+000-2+500), Leuro-Sorulua (Sta.0+000-3+000) | 46.22 % |
| 1628 | P0508 | R4D MPWTC Rural Road Routine Maintenance District Oecusse (Package 3) Mahata-Kusi Sta. 0+000-9+000 | 100.00 % |
| 1629 | P0507 | R4D MPWTC rural road routine maintenance municipality of Lautem Package 3 Lospalos-Soru Sta 0+000-5+000, Luro-Sorulua Sta 0+000-3+000 | 100.00 % |
| 1630 | P0506 | R4D MPWTC Rural Road Routine Maintenance District Oecusse (Package 1) Baqui-Leolbatan (Sta.0+000-15+600), Bihala Noesusi (Sta.0+000 - 4+200) | 100.00 % |
| 1631 | P0505 | R4D MPW Rural Roads routine Maintanance District Oecusse Package 2 Nunheu - Mahata ( Sta 0+000 - 27 + 700) | 100.00 % |
| 1632 | P0504 | R4D MPW Rural Roads Maintanance Project inViqueque Package 1.Luihono 0+00 - 5+200 | 100.00 % |
| 1633 | P0503 | Rural Roads Routine Maintenance Project Manico - Linai - Grotu Sta. 0+000-10+600, Ladiki Sta. 0+000-1+200,and Same-Rotuto Sta. 0+000-12+000 | 100.00 % |
| 1634 | P0502 | Rural Roads Routine Maintenance Project Dotic-Wekakaoan Sta. 0+000-8+600, Dotic - Weberek Sta. 0+000-6+300, Tukunu - Feriksale Sta. 0+000-4+300 | 100.00 % |
| 1635 | P0501 | R4D MPWTC Rural Roads Maintanance Project in Manufahi District Package 2 dotic - weberek Sta 0+000-6+300, Dotic - Wekakaoan Sta 0+000-8+600 | 100.00 % |
| 1636 | P0500 | R4D MPW Rural Roads Maintanance Project in Manufahi District Package Dotik - Wekakoan Sta 0+000-8+600 | 100.00 % |
| 1637 | P0499 | R4D MPW Rural Roads Maintanance Project in Manufahi District Package Weberek Sta 0+000-6+300 | 100.00 % |
| 1638 | P0498 | R4D Rural Roads Maintanance Project in Aileu under Package 3 ,Laulara - ornai, hahisoi - fadabloko , Acumao - Aicorema & Aumau Remixio Tuan . | 100.00 % |
| 1639 | P0497 | R4D MPW Rural Roads rehabilitation Project in Aileu Bereleu manucasa Package 2 Sta. 3+500-13+000 | 97.45 % |
| 1640 | P0496 | R4D MPW Rural Roads rehabilitation Project in Aileu,Bereleu Manucasa Package 1 | 100.00 % |
| 1641 | P0495 | R4D MPW Rural Roads Maintanance Project in Aileu, Package 2 Fahisoi - Dairlonta Daisoli - Fatubosa &Rairema Kirlelo | 100.00 % |
| 1642 | P0494 | R4D MPW Rural Roads Maintanance Project in Aileu, Maumeta-hautoho- fadabloko Sta. 4+000- 8+200 | 100.00 % |
| 1643 | P0493 | R4D MPW Rural Roads Maintanance Project in Aileu, Maumeta-hautoho- fadabloko Sta. 0+000- 6+000 | 100.00 % |
| 1644 | P0492 | Rural Road Routine Maintenance Municipality of Lautem Package 1 Dasidara - Liquidiga Sta 0+000-10+500 | 100.00 % |
| 1645 | P0491 | R4D MPW rural road rutin Maintanance of Dist. Lautem Package 2 Luro - Barikafa Sta0+000-7+000 | 100.00 % |
| 1646 | P0490 | Rutin Maintenance of Dasidara - Lequidiga Roads | 100.00 % |
| 1647 | P0489 | Rural Road Routine Maintenance | 100.00 % |
| 1648 | P0488 | R4D MPW Rural Roads Maintanance of Maliana, saburai,Balibo,Cowa, Rairobo Pasmaten ritabou, Raifun Roads -Bobonaro District | 100.00 % |
| 1649 | P0487 | Consulting Services Construction Supervision of Suai-Fatucai/Mola Section of the Suai-Beaco Highway Road | 100.00 % |
| 1650 | P0486 | R4D MPWC Rural Roads Routine Maintenance Caicoli - Liabala Sta. 0+000 - 6+500, Bercoli - Bahamori Sta. 0+000 - 4+000, Oma Ana Iku - Osoula Sta. 0+000 - 4+500, Vemasse - Caicua Sta. 0+000 - 17+000 Baucau | 100.00 % |
| 1651 | P0485 | R4D MPWTC Rural Road Maintenace Buruma- Wamutu - Waimateme Sta. 0+000 - 2++800, Lara Boleha Sta. 0+000 - 8+200, Samalari - Sorugua Sta. 0+000 - 2+800, Laisorulai - Nae Sta. 0+000 - 5+000 | 100.00 % |
| 1652 | P0484 | R4D MPW Rural Roads Rehablilitation Project in District Baucau packege 4 (Baguia to larisula) Sta 4+751 - 5 +900 | 100.00 % |
| 1653 | P0483 | R4D MPW Rural Roads Rehablilitation Project in Baucau Municipality, packege 3 Baguia to larisula, Sta 3+250 - 4+750 | 100.00 % |
| 1654 | P0482 | R4D MPW Rural Roads Maintanance Project in District Baucau package 2 Baguia Larisula sta 2+000 - 3+250 | 100.00 % |
| 1655 | P0481 | Rural Roads Rehabilitation Project in Baucau Municipality Package 1 Baguia - Larisula Sta 0+000-2+000 | 100.00 % |
| 1656 | P0480 | R4D MPW Rural Roads Maintanance Project in District Baucau (Quelicai to Laisorolai) Sta 5+000 - 10+000 | 100.00 % |
| 1657 | P0479 | Construction of Downstream Check Dam of CPLP Bridge Municipality Dili (162) | 100.00 % |
| 1658 | P0478 | Rebidding of Packega New Sand Pocket Construction Road Maintenance Section Manleu ( Maok River ) Municipality Dili (162) | 100.00 % |
| 1659 | P0477 | Additional Works for Betano Facility (Change Order no. 05) | 100.00 % |
| 1660 | P0476 | Additional Works for Betano Facility (Change Order no. 04) | 100.00 % |
| 1661 | P0475 | Additional Works for Betano Facility (Change Order no. 03) | 100.00 % |
| 1662 | P0474 | Rehabilitation Roads and Bridges in Solerema Municipio Aileu | 100.00 % |
| 1663 | P0473 | Servisu Emergencia Hasai Sedimentasaun ho Distansia 360m iha Marinir, Comoro Dili. | 100.00 % |
| 1664 | P0472 | Emergency Const. of Box Culvert at seical Baucau District | 100.00 % |
| 1665 | P0471 | Emergency Construction of Drainage and slope protection along Samalary Baguia & Quelicai Abafala | 100.00 % |
| 1666 | P0470 | Emergency dranagem and slope protection works in comoro mota ain naval | 100.00 % |
| 1667 | P0469 | Emergency Drainage and Slope Protection along Bidau, Mota klaran River | 100.00 % |
| 1668 | P0468 | Rehabilitation Toilet at DRBFC office | 100.00 % |
| 1669 | P0467 | For Roads & Bridges Maintenance Aisirimou Bridge Approach Protection Municipality Aileu (162) | 100.00 % |
| 1670 | P0466 | Emergency Projecto Pocho Filtrasaun iha Cidade Dili Municipality Dili | 84.03 % |
| 1671 | P0465 | Emergency Projecto Limpeza Drainage Major de Cidade de Dili | 100.00 % |
| 1672 | P0464 | Line Drain Sand Pocket Cleaning Road Maintenance Section Urban Roads | 100.00 % |
| 1673 | P0463 | New Construction of Wall Protection of Tower 41 and 42 Section Liquica - Maliana | 100.00 % |
| 1674 | P0462 | Emergency Box Culvert Works in Gunung Mas Ainaro Vila | 100.00 % |
| 1675 | P0461 | New Construction of stone Masonry wall along Beduku, Manleuana Mota Ulun 400 m | 100.00 % |
| 1676 | P0460 | Emergency drainage and Slope Protection along karau ulun River suai | 100.00 % |
| 1677 | P0459 | Construction of gabion and wall in Suco laho Mean Protection | 100.00 % |
| 1678 | P0458 | Emergency Drainage And Slope Protection | 100.00 % |
| 1679 | P0457 | Urgent Rehabilitation of Wave Breaker Block at Comoro Airport | 100.00 % |
| 1680 | P0456 | New Construction of retaining wall at Comoro river, Beduku Dili District | 100.00 % |
| 1681 | P0455 | Emergency Works Works on Build of stone Masonry wall and drainage and slope protection | 100.00 % |
| 1682 | P0454 | Vqq, Makadique Saketo river | 100.00 % |
| 1683 | P0453 | River project emergency service | 100.00 % |
| 1684 | P0452 | River project emergency service | 100.00 % |
| 1685 | P0451 | Nunura River ( Uatucarbau) | 100.00 % |
| 1686 | P0450 | Normalization River in Gleno Town | 100.00 % |
| 1687 | P0449 | Emergency Works Atabae River | 100.00 % |
| 1688 | P0448 | Emergency Nunura River Maliana | 100.00 % |
| 1689 | P0447 | New Construction Of Isolation For Covid-19 at CHI Municipality Viqueque, Ministry Of Health, Timor Leste | 59.71 % |
| 1690 | P0446 | Projecto construsaun Bronjong atu proteje fatin perfurasaun Mantane sub distrito Aileu Vila | 100.00 % |
| 1691 | P0445 | Projecto construsaun Bronjong atu proteje fatin perfurasaun Mantane sub distrito Aileu Vila | 100.00 % |
| 1692 | P0444 | Becora Terminal River | 100.00 % |
| 1693 | P0443 | Benamauk River (Power Station) Site A | 100.00 % |
| 1694 | P0442 | Comoro River Site II | 100.00 % |
| 1695 | P0441 | Emergency Box culvert works in Orluli Ainaro District | 100.00 % |
| 1696 | P0440 | Emergency Box culvert works in Kay Rala Bridge, Manatuto | 100.00 % |
| 1697 | P0439 | Emergency Mabilgol Bridge | 100.00 % |
| 1698 | P0438 | Manatotu to Laclubar ( Orhua Bridge) | 100.00 % |
| 1699 | P0437 | Additional Bucoli Bridge | 100.00 % |
| 1700 | P0436 | Road Maintenance Sections : Lospalos - Iliomar Section ( A082 - 2 ) Municipality Lautem (162) | 92.80 % |
| 1701 | P0435 | Routine Road Maintenance Same - Betano - Dilor - ( A05, A14 ) / 76,4 km Municipality Manufahi (162) | 100.00 % |
| 1702 | P0434 | Routitine Road Maintenance Lot 1 - Viqueuqe - Dilor A07, Lot 2 - Jct Luca - Lacluta C5 Municipality Viqueque (162) | 100.00 % |
| 1703 | P0433 | For Road Routine Maintenance Loes - Atabae - Batugade - Soso Bridge ( A03) 76,4 km Bobonaro Municipality | 100.00 % |
| 1704 | P0432 | Road Maintenance Section Same Urban Roads 22.9 kmMunicipality Manufahi | 100.00 % |
| 1705 | P0431 | Road Maintenance Section : Iliomar - Uatucarbau Section ( A08 - 3 ) Municipality Viqueque (162) | 100.00 % |
| 1706 | P0430 | Road Maintenance: Benamaoc - Hera ( A01 ) and Halilaran - Laulara ( A02 ) Municipality Dili (162) | 100.00 % |
| 1707 | P0429 | Fornesemento Plakas no produs Sinais ba Municipio Dili Ministerio da Administrasaun Estatal ( MAE ) | 100.00 % |
| 1708 | P0428 | New Construction of Roads Way, Drainage and Pavement at Jardin dos Herois Municipality Ainaro | 100.00 % |
| 1709 | P0427 | Emergency Projecto Limpeza Drainagem iha Area Aimutin, Municipality Dili | 100.00 % |
| 1710 | P0426 | Emergency National Roads Rehabilitation Project in the Sub District of Fohoren, Datorua, Fatululik and Fatumea ( A16 ) | 100.00 % |
| 1711 | P0425 | Asphalting Works Project in MDRI Site, Caicoli | 100.00 % |
| 1712 | P0424 | Rural Roads Routine Maintenance Maliana Saburai Atus Sta 0+000 - 17+000, Saburai Tas Masak Sta. 0+000-1+200, Ritabou Sta. 0+000-2+000, Marobo Be Manas Sta. 0+000-5+700, Holsa Saburai Sta. 0+000-8+500 | 100.00 % |
| 1713 | P0423 | Rural Roads Routine Maintenance Balibo Cowa Sta 0+000 - 10+000, Rairobo Pasmaten Sta. 0+000-3+000, Aidabaleten Sta. 0+000-1+100, Balibo Ferik Katuas Sta. 0+000-7+000, Builecun Leohitu Sta. 0+000-6+8000 | 100.00 % |
| 1714 | P0422 | Rehabilitation of Motor Vehicle Inspection Area in Municipality of Dili | 100.00 % |
| 1715 | P0421 | Construction of Roadway and Pathway at Jardim dos Heroes Metinaro | 100.00 % |
| 1716 | P0420 | Project in Preparation for the Ceremony during falintil Day | 100.00 % |
| 1717 | P0419 | Emergency Road Works and drainage and Slope protection along Same to Betano road - Manufahi distrik | 100.00 % |
| 1718 | P0418 | Emergency Drainage and Slope Protection Along Aileu to Maubisse Roads | 100.00 % |
| 1719 | P0417 | Emergency Project for rehabilitation of airport Nicolau Lobato Dili Timor Leste | 100.00 % |
| 1720 | P0416 | Loke Estrada Foun/ Emergency Works Along Aitehen in Manatuto District | 100.00 % |
| 1721 | P0415 | Emergency Rehabilitation of Manatuto to Laclubar roads | 100.00 % |
| 1722 | P0414 | Manatutu to Laclubar Roads (Lakati) | 100.00 % |
| 1723 | P0413 | Manatutu to Laclubar Roads (Lakati) | 100.00 % |
| 1724 | P0412 | New Construction of wall Protection Tower N- 86 in Manatuto | 100.00 % |
| 1725 | P0411 | Emergency Bebora Zumalai Roads Covalima | 100.00 % |
| 1726 | P0410 | Repair works from batugade to Maliana District package RMC 4 | 100.00 % |
| 1727 | P0409 | Rehabilirarion of Roads works in Lontas Lolotoe | 49.96 % |
| 1728 | P0408 | Emergency Municipality Road Maintenance Landslide From Ainaro to Soro Craik to Hatudo At Sta. 1+712 | 100.00 % |
| 1729 | P0407 | Emergency Repair works in Maubisse - Aituto Roads | 100.00 % |
| 1730 | P0406 | For Routine Maintenance - Dili Urban Roads Dili Municipality (162) | 100.00 % |
| 1731 | P0405 | River project emergency Dili-Aileu | 100.00 % |
| 1732 | P0404 | New Construction Centre of Rice Milling, Fence, Office & Housing in Natarbora | 17.59 % |
| 1733 | P0403 | Konstrusaun Kanal Irrigasaun no Protesaun Zona Agricola iha Laleia, Posto Administrasaun Laleia-Municipio Manatuto | 100.00 % |
| 1734 | P0402 | Consulting Services for Redesign of Dardau and Galata Irrigation Schemes | 100.00 % |
| 1735 | P0401 | Konstrusaun Kanal Irrigasaun no Protesaun Zona Agricola iha Bilimau, Posto Administrasaun Kailako-Municipio Bobonaro | 100.00 % |
| 1736 | P0400 | Construction Of Seical irrigation in Baucau District | 100.00 % |
| 1737 | P0399 | Construction of Casa Irigation in Ainaro (LM) | 100.00 % |
| 1738 | P0398 | Emergency service of Bebui Irrigation in afaloicai sub district Uatolari | 100.00 % |
| 1739 | P0397 | Consultancy services for National Road No. 1 - Upgrading Project | 83.09 % |
| 1740 | P0396 | National Road No.1 Upgrading Project Dili - Manatuto (Package A01-01) | 100.00 % |
| 1741 | P0395 | Timor - Leste Road Climate Resilience Project: Consulting Services for Feasibility Study and Detailed Engineering Design of Branch Road Section of Dili-Ainaro Road namly, Aituto - Hatubuilico - Letefoho-Gleno | 100.00 % |
| 1742 | P0394 | Selection of Consulting Service for : Construction Supervision for the Upgrading and Maintenance of the Dili - Ainaro Road, Lot 2 : Laulara - Solerema Section ( 12+000 - 34+620 ) and Post Upgrading Economic Evaluation of the Entire Dili - Ainaro Road ( Lots 1 - 5) | 76.51 % |
| 1743 | P0393 | Construction Supervision of Road Rehabilitatiom works of selected Sections on the Dili - Ainaro Road, lot 4: Bandudatu - Aituto Section (64+ 000 to 89+000) and lot 5 : Aituto - Ainaro (89+000-112+000) | 100.00 % |
| 1744 | P0392 | Consultant Design & Supervision Lot 3 | 80.11 % |
| 1745 | P0391 | Road Climate Resilience project (RCRP) upgranding and maintenance of Dili- Ainaro Road, Lot 5 Aituto-Ainaro section (km 89+00 -km 112+000) | 100.00 % |
| 1746 | P0390 | Road Climate Resilience project (RCRP) upgranding and maintenance of Dili- Ainaro Road, Lot 4 Bandudato-Aituto section (km 64+00 -km 89+000) | 100.00 % |
| 1747 | P0389 | Road Climate Resilience project (RCRP) upgranding project and maintanace of Dili- Ainaro Road Lot 3(Solerema - Bandudatu Section (Km 34 +620 - Km 64 + 000)(29km) | 100.00 % |
| 1748 | P0388 | Upgrading and Maintenance of Dili - Ainaro Road Lot 2 : Laulara - Solerema Section ( km 12+000 - 34+620 ) Municipality Aileu | 100.00 % |
| 1749 | P0387 | Consulting Services for Project Implementation and Construction Supervision for the Upgrading and Maintenance of the Baucau - Venilale - Viqueque Highway Project, Lot 1 : Baucau - Venilale Section ( Sta. 3+740 - Sta. 27+120 ), Lot 2 : Venilale - Viqueque Section ( Sta. 27+120 - Sta. 62+010 ), Timor Leste | 94.41 % |
| 1750 | P0386 | Upgrading and Maintenance of Baucau - Viqueque Highway Project Lot 2: Venilale - Viqueque : Sta. 27 + 120 to Sta. 62 + 010 | 98.00 % |
| 1751 | P0385 | Upgrading and Maintenance of Baucau - Viqueque Highway Project Lot 1: Baucau - Venilale : Sta. 03 + 740 to Sta. 27 + 120 | 100.00 % |
| 1752 | P0384 | Road Network Upgrading Project ( Additional Financing ) - Construction Supervision for the Upgrading and Maintenance of Baucau to Lautem, Maubara to Karimbala and Atabae to Mota Ain Roads | 87.42 % |
| 1753 | P0383 | RNUSP / Road Link No. A01 - 03 : Upgrading and Maintenance of Maubara - Karimbala Road ( Km. 49.7 to Km. 54.1 and Km.58.1 to Km. 62.6)and Atabae - Mota Ain Road ( Km 85.3 to Km.114.2) | 100.00 % |
| 1754 | P0382 | RNUSP/ Road Link No. A01 - 03 : Upgrading and Maintenance of Baucau - Lautem Section : Sta. 123 + 105 to Sta. 182 + 040 ( with Exceptions) | 94.12 % |
| 1755 | P0381 | Consultant Design (M-L & L-N) & Supervision (D-L & T-G, Tasi Tolu -tibar 4 L) | 83.80 % |
| 1756 | P0380 | Road Network Upgrading Project (RNUP),Upgrading and Maintenance of Dili (Airport Junction)- Tibar Road- Section 2 : Tasitolu - Tibar | 92.80 % |
| 1757 | P0379 | Consultant Supervision (M-L & L-N) | 73.76 % |
| 1758 | P0378 | Road Network Upgrading Sector Project ( RNUSP )Upgrading and Maintenance of Laclubar Junction - Natarbora Road ( Sta. 100+360 - Sta. 144+995 ) | 100.00 % |
| 1759 | P0377 | Road Network Upgrading Sector Project (RNUP) for Manatuto - Laclubar Junction ( Sta. 65+235 - 100+355 ) | 100.00 % |
| 1760 | P0376 | National road no. 1 Upgrading project Manatuto - Baucau (package A01-02)Package A01-02/sta 56+400-114+102(56.82km) | 100.00 % |
| 1761 | P0375 | Kanalizasaun Sistema bemos husi Mau-ulu II ba Faulata Casa, area in Ainaro, municipality of Ainaro | 100.00 % |
| 1762 | P0374 | Rehabilitation of Water Supply multi village system in Samalari and Makalaku, Baucau | 100.00 % |
| 1763 | P0373 | Construction and Installation water Gravitation System in Mahaquidam Umaberloik Manufahi Municipality | 92.67 % |
| 1764 | P0372 | Construction and Installation of Water Gravitation System for Multy Village (Manumera, Caimauk and Orana) Manufahi Municipality | 100.00 % |
| 1765 | P0371 | Construction, Rehabilitation and Installation of Clean Water with System Gravitation in Suco Fohorem Villa | 45.05 % |
| 1766 | P0370 | Konstrusaun be mos sistema bomba ( Multy Suco ) Watuhaco no Fatulia-Venilale in Baucau Municipality | 100.00 % |
| 1767 | P0369 | Projetu Construsaun Be Mos Sistema Frafitasaun Multy Aldeia Manelobas | 70.57 % |
| 1768 | P0368 | R4D Rural Road Rehabilitation Ossu de Cima - Liawaioli Chainage 0+000 - 2+000 Viqueque Municipality | 100.00 % |
| 1769 | P0367 | Periodic Maintenance Loihono-Osorua Chainage 0+000-6+750 Viqueque Municipality | 100.00 % |
| 1770 | P0366 | R4D Rural Road Rehabilitation Pala - Iliana - Tasi Chainage 0+000 - 7+000 Atauro Dili Municipality | 22.41 % |
| 1771 | P0365 | R4D Rural Road Rehabilitation Bebadiri - Lebokalako Chainage 0+000 - 5+000 Liquica Municipality | 97.15 % |
| 1772 | P0364 | Routine Maintanance Lospalos - Souro Chainage 0+000 - 5+800, Routine Maintanance Leuro - Sorulua Chainage 0+000 - 3+000 | 100.00 % |
| 1773 | P0363 | R4D Rural Road Rehabilitation Ponilala Chainage 1+500 - 3+000 Ermera Municipality | 100.00 % |
| 1774 | P0362 | R4D Rural Road Rehabilitation Ponilala Chainage 0+000 - 1+500 Ermera Municipality | 100.00 % |
| 1775 | P0361 | R4D Rural Road Rehabilitation Dato- Tolu Chainage 11+100 - 12+600 Covalima Municipality | 100.00 % |
| 1776 | P0360 | R4D Rural Road Rehabilitation Data - Tolu Chainage 9+600 - 11+100 Covalima Municipality | 100.00 % |
| 1777 | P0359 | Manutensaun Estrada Lookeu. Sta. 0+000-6+000, Manutensaun Estrada Lepo-Lour. Sta. 0+000-3+000, Manutensaun Estrada Naquidal-Lour. Sta. 0+000-4+200-Municipal of Covalima | 51.08 % |
| 1778 | P0358 | R4D Rural Road Rehabilitation Maliana - Saburai - Atus Chainage 17+000 - 18+500 Bobonaro Municipality | 100.00 % |
| 1779 | P0357 | R4D Rural Road Rehabilitation Malilait Chainage 0+000 - 1+500 Bobonaro Municipality | 100.00 % |
| 1780 | P0356 | Maintenance Maliana-Saburai. Chainage 0+000-13+000-Municipal of Bobonaro | 100.00 % |
| 1781 | P0355 | R4D Rural Road Rehabilitation Teriluedae - Salari Chainage 1+600 - 3+300 Baucau Municipality | 100.00 % |
| 1782 | P0354 | R4D Rural Road Rehabilitation Teriluedae - Saelari - Binagua Chainage 0+000 - 1+600 Baucau Municipality | 99.83 % |
| 1783 | P0353 | Rehabilitasaun Estrada Bercoli-Bahamori 3 Sta. 2+750-4+000-Municipal of Baucau | 100.00 % |
| 1784 | P0352 | Rehabilitation Bercoli - Bahamori 1 Chainage Sta. 0+000-1+500 Baucau Municipality | 100.00 % |
| 1785 | P0351 | Manutensaun Estrada Boile-Uatabo Sta. 0+000-5+200-Municipal of Baucau | 100.00 % |
| 1786 | P0350 | Manutensaun Estrada Baquia-Larisula Sta. 0+000-12+900-Municipal of Baucau | 100.00 % |
| 1787 | P0349 | Rehabilitasaun Estrada Hatularan-Cairui Sta. 5+000-9+800-Municipal of Manatuto | 100.00 % |
| 1788 | P0348 | Rehabilitasaun Estrada Hatularan-Cairui Sta. 0+000-5+000-Municipal of Manatuto | 100.00 % |
| 1789 | P0347 | Rural Road Rehabilitation of Betano - Loro 2 Chainage 1+800 - 3+600 Manufahi Municipality | 100.00 % |
| 1790 | P0346 | Rural Road Rehabilitation of Betano - Loro 1 Chainage 0+000 - 1+800 Manufahi Municipality | 100.00 % |
| 1791 | P0345 | Rehabilitasaun Estrada Tekunu-Feriksale 2 Sta. 2+500-4+250-Municipal of Same | 100.00 % |
| 1792 | P0344 | Rehabilitation of Road Tukunu - Feriksale 1 Chainage 0+000 - 2+500 Manufahi Municipality | 100.00 % |
| 1793 | P0343 | Manutensaun Estrada Manico-Lianai-Grotu Sta. 0+000-10+ 550- no Manutensaun Estrada Ladiki Sta. 0+000-1+ 200 Municipal of Same | 30.00 % |
| 1794 | P0342 | Periodic Maintenance Same - Kamilaran - Ailuli - Rotutu Sta. 0+000-12+ 000 Municipality Manufahi | 100.00 % |
| 1795 | P0341 | R4D Rural Road Rehabilitation Mau Chiga - Lesuati Chainage 6+400 - 7+800 Ainaro Municipality | 100.00 % |
| 1796 | P0340 | R4D Rural Road Rehabilitation Mauchiga - Lesuati Chainage 5+000 - 6+400 Ainaro Municipality | 100.00 % |
| 1797 | P0339 | Rehabilitasaun Estrada Ainaro-Mau Nuno Sta. 0+000-5+533 -municipal of Ainaro | 40.86 % |
| 1798 | P0338 | Manutensaun Rutina Estradas Rural, Dare-Mauchiga Chainage,Ainaro 0+000 - 5+000(5.0km) | 100.00 % |
| 1799 | P0337 | Manutensaun Estrada Maubise-Urlepha Sta. 0+000-3+000-municipal of Ainaro | 100.00 % |
| 1800 | P0336 | Rehabilitasaun Estrada Rural R4D Taliforleu - Kolihoho Chainage 0+000 - 8+000 Munisipiu Aileu | 96.94 % |
| 1801 | P0335 | Road Maintenance Section Loes - Atabae and Batugade - Maliana 2016 | 100.00 % |
| 1802 | P0334 | Road Maintenance Section Gleno - Ermera - Letefoho (A04,A11)2016 | 100.00 % |
| 1803 | P0333 | Road Section Aipelo - Bazartete(C9), Maubara - Carimbala - Loes(A03) | 100.00 % |
| 1804 | P0332 | Road Maintenance Section Area Branca - Hera,Benamauk - Hera (A01) | 90.00 % |
| 1805 | P0331 | Road Maintenance Section - Ainaro - Border Suai (A02),Casa - Hatu - udo (A13) | 15.00 % |
| 1806 | P0330 | Road Maintenance section Luak - Betano - Natarbora - Dilor(A05 & A14) 2016 | 100.00 % |
| 1807 | P0329 | Road Maintenance section Viqueque - Lacluta - Dilor) | 100.00 % |
| 1808 | P0328 | Consulting Services of Detailed Engineering Design of Sport Complex and Building at Region of Dili | 70.00 % |
| 1809 | P0327 | Revitalization foot Ball Stadium and tribune Building | 62.83 % |
| 1810 | P0326 | Construção de novo Estadio de Futebol em Manatuto | 99.38 % |
| 1811 | P0325 | Rehabilition of Football Stadium and New Construction of Tribune Building Ermera Gleno | 100.00 % |
| 1812 | P0324 | Additional Service Statement of Work for Year 2020 - Government Resource Planning Solutions & Supporting IT Infrastructure System Implementation & Support Agreement | 75.58 % |
| 1813 | P0323 | Consulting services for study master plan and detailed design for ecotourism of Lagoa Maubara | 40.00 % |
| 1814 | P0322 | Development of Tibar Bay Port - PPP Project - on BDFOT Basis | 47.12 % |
| 1815 | P0321 | Construção Ponte e rio de Kaboska at Bemetan, Betano, Same Sub District, Manufahi | 100.00 % |
| 1816 | P0320 | Emergency Construction of New two (2) Concrete Bridge in Jakarta III, Ainaro Municipalityy | 100.00 % |
| 1817 | P0319 | New construction of Hatulia Bridge 1 & 2 Municipality Ermera | 100.00 % |
| 1818 | P0318 | Rehabilitation of Suspension Bridge, Municipality of Viqueque. | 100.00 % |
| 1819 | P0317 | New Construction of Steel Truss One Span Bridge (Type B - 100 M) in Bulobo River | 100.00 % |
| 1820 | P0316 | Construction of New Steel Bridge 100m in Milotu Sahe river, jct.Fatucamanau, Soibada, Timor Leste | 100.00 % |
| 1821 | P0315 | Contruction of CPLP Cable Stayed Bridge Municipio Dili | 100.00 % |
| 1822 | P0314 | Construction of New Bidau Bridge Area in Bidau ,Municipality Of Dili | 100.00 % |
| 1823 | P0313 | Construction of Baer Bridge | 100.00 % |
| 1824 | P0312 | Construction of Taroman Bridge | 100.00 % |
| 1825 | P0311 | Emergency Project in Manleu - Dili Municipality | 100.00 % |
| 1826 | P0310 | Emergency Project Kasnafar 2020 Municipio Dili | 100.00 % |
| 1827 | P0309 | Emergency Project for Fatuahi e Hera Parte Tasi (Pakote 6 E) Municipio Dili | 100.00 % |
| 1828 | P0308 | Emergency Project for Mota Akanunu Downstream (Pakote 6 D) Municipio Dili | 100.00 % |
| 1829 | P0307 | Emergency Project For Mota Akanunu Upstream ( Pakote 6 C ) Municipio Dili | 100.00 % |
| 1830 | P0306 | Emergency Work For River Protection at 5 de Maio, Becora (Pacote No. 5) Municipio Dili | 100.00 % |
| 1831 | P0305 | Emergency Work for Maufelo Ate Ponte Habibie / Bidau Santa Ana (Pakote No. 4) Municipality of Dili | 100.00 % |
| 1832 | P0304 | Emergency Project Ponte Ponte My Friend - Ponte Hali Laran, Kuluhun 2020 (Pakote No. 3) Municipality Dili | 100.00 % |
| 1833 | P0303 | Emergency Work for Kuluhun Ate Ponte Habibie/Bidau Santa-Ana (Pacote I) Municipality Dili | 100.00 % |
| 1834 | P0302 | Emergency Work for Lahane Oriental (Aldeia Valede Lahane, Balibar e Paiyol ) Pakote No.1 Municipality Dili | 100.00 % |
| 1835 | P0301 | Manutensaun no rehabilitasaun de Estrada Emergencia Ladibau -Lauana-Atsabe-Atara, Posto Adm. Atsabe ( 0+000-29+750) | 100.00 % |
| 1836 | P0300 | Rehabilitasaun Estradas Humboe Letefoho | 100.00 % |
| 1837 | P0299 | Emergency Acess Roads Nunutali-Ermera | 100.00 % |
| 1838 | P0298 | Emergency Mota Loes | 100.00 % |
| 1839 | P0297 | Road and Drainage Rehabilitation Project Emergency Road at Tibalau and Karimbala Liquica Municipality Liquica | 100.00 % |
| 1840 | P0296 | Rehabilitation Roads Section Morai Fatubesi - Maubara Road | 100.00 % |
| 1841 | P0295 | Mauboke River | 100.00 % |
| 1842 | P0294 | Emergency Maubara River | 100.00 % |
| 1843 | P0293 | Maumeta River Liquica | 100.00 % |
| 1844 | P0292 | Rehabilitation of Ainaro - Bobonaro Road Link, Road Section: Ainaro to Bobonaro Sta 0+000 - Sta 28+600 (28.600 KM) Bobonaro Municipaliy | 93.64 % |
| 1845 | P0291 | New Construction of Gabion Wall in Cassa River Municipality of Ainaro | 100.00 % |
| 1846 | P0290 | Emergency Construction of New Roads From Ainaro Vila to Sarai Package II Municipality Ainaro | 100.00 % |
| 1847 | P0289 | Emergency Construction of New Roads Ainaro Vila to Sarai Package III Ainaro Municipality | 100.00 % |
| 1848 | P0288 | New Construction of Gabion wall in Somasi River | 100.00 % |
| 1849 | P0287 | Road Rehabilitation of Remexio to Laclo Sta 0+000-20+000 Package I Aileu Municipality | 100.00 % |
| 1850 | P0286 | Rehabilitasaun Estradas Laleia Lifau Roads | 100.00 % |
| 1851 | P0285 | Sumase River | 100.00 % |
| 1852 | P0284 | New Construction of Gabion Walls in Laleia River Municipality Manatuto | 100.00 % |
| 1853 | P0283 | Road Section Jct Natarbora to SPP Package I Sta.0+000-5+800 | 100.00 % |
| 1854 | P0282 | Rehabilitacao Estrada Urbanas Jct. Ma'abat - Manatuto Vila - Sau Ponte ( 4.68 km ) in Manatuto Municipio Manatuto | 100.00 % |
| 1855 | P0281 | Rehabilitation Estrada Urbanas Manatuto Vila ( 3.72 km ) area in Manatuto Municipality Manatuto | 100.00 % |
| 1856 | P0280 | Rehabilitacao Estrada Jct. A01 Laleia - Lifau Tasi ( 10+000 km ) Road Section : Jct. Escola Secundaria Lifau ( SMA ) - Cemiterio - Lifau Tasi ( 5+426 km ) CH-01 ( 0+000 - 4+116 ), CH-02 ( 0+000 - 0+260 ) in Municipality of Manatuto | 100.00 % |
| 1857 | P0279 | Rehabilitation of Roads From Junction Bemvindo Bahalara - Uain We Bubur - Natar Tali Belanda Road Sta. 0+000 - 5+500 Municipality Viqueque | 100.00 % |
| 1858 | P0278 | New COnstruction Of Dilor River Protection Package 2 STA 0+800-1+612 In Viqueque District | 100.00 % |
| 1859 | P0277 | Rehabilitation of Urban Road Municipality Viqueque | 100.00 % |
| 1860 | P0276 | Rehabilitation of Viqueque - Uatocarbau Road Sta. 53+000 - 58+300 ( Package XI ) Municipaty Viqueque | 100.00 % |
| 1861 | P0275 | Rehabilitation of Viqueque - Uatocarbau Road Sta. 31+800 - 37+100 ( Package VII ) in Uatolari Municipality Viqueque | 100.00 % |
| 1862 | P0274 | Rehabilitation of Viqueque - Uatocarbau Road Sta. 26+500 - 31+800 ( Package ) Area in Viqueque Municipality Viqueque | 100.00 % |
| 1863 | P0273 | Road Rehabilitation of Assalaitula - Ossu Sta. 5+155 - 14+000 Municipality Viqueque | 100.00 % |
| 1864 | P0272 | Construction of Emergency Road in Maliana, Bobonaro Municipality | 57.50 % |
| 1865 | P0271 | Rehabilitation of Roads Maliana - Cailaco - Marobo Package I Sta. 0+000 - 4+000 Municipality Bobonaro | 100.00 % |
| 1866 | P0270 | Rehabilitation of Roads A12 Jct A12 Maliana - Jct A02 Zumalai (50+900 km) Road Section : Jct A16 Uele'o - Jct A02 Zumalai (35+120) Road Section 8 : Zulo - Jct Zumalai ( 30+100 - 35+120 km ) Municipality Covalima | 100.00 % |
| 1867 | P0269 | Rehabilitation of Roads A12 Jct A12 Maliana - Jct A02 Zumalai ( 50+900 km ), Road Section : Jct A16 Uele'o - Jct A02 Zumalai ( 35+120 ) Road Section 7 : Fatulito - Zulo ( 25+800 - 30+100 ) Municipality Bobonaro - Covalima | 100.00 % |
| 1868 | P0268 | Construction of Gabions (Batugade) | 100.00 % |
| 1869 | P0267 | Rehabilitation of Roads Lepo to Suco Lour & Atus Sta. 0+000 - 7+000 Municipality Bobonaro | 100.00 % |
| 1870 | P0266 | Rehabilitation of Maliana - Cailaco - Marobo Roads Package II Sta. 4+000 - 7+200 Municipality Bobonaro | 100.00 % |
| 1871 | P0265 | Rehabilitasaun Estrada Mandoki Biamaraen Nunura | 100.00 % |
| 1872 | P0264 | Rehabilitation of Oeleu - Tilomar Roads ( Sta. 7+500 - 22+660 ) Package II Municipality Bobonaro | 100.00 % |
| 1873 | P0263 | Rehabilitation Of Jct. Balibo - Cova Posto UPF Derok Ren Road, Road Section : Jct Wefauk, derok Ren - Kolobili (Sta. 0+000-4+650), Bobonaro Municipality | 100.00 % |
| 1874 | P0262 | Rehabilitation of JCT Categral - Maliana - Etadai Roads ( Package I ) Sta. 1+150 - 3+150 ( 2.00 km ) Municipality Bobonaro | 100.00 % |
| 1875 | P0261 | Rehabilitation of Road Jct. Assalaino to Com, Road Section : Jct. Assalaino to Caicavamoko Sta. 8+000 - 15+200 Lautem Municipality | 100.00 % |
| 1876 | P0260 | Rehabilitation of Road Jct. Assalaino to Com, Road Section : Jct Assalaino to Caicavamoko Sta. 0+000 - 8+000 km municipality Lautem | 100.00 % |
| 1877 | P0259 | Rehabilitation Roads Maina 1 to parlamento 3.916 km | 100.00 % |
| 1878 | P0258 | Rehabilitation Road Section : Jct. Tutuala Roads ( C2 ) Package 1 Sta. 3+850 - 7+725 Municipality Lautem | 100.00 % |
| 1879 | P0257 | Road Rehabilitation From Tutuala to Valu Chainage 0+000 - 3+850 Municipality Lautem | 100.00 % |
| 1880 | P0256 | Rehabilitation of Roads Laivai - Vairoque - Liarafa Roads Sta. 0+000 - 7+250 ( 7.25 km ) Phase I Municipality Lautem | 100.00 % |
| 1881 | P0255 | Reconstruction Of Road Ex. Japan, Dili Timor Leste ( Part II ) Kasnafar ( Sta. 17+000 - 19+750 ) Municipality Dili | 100.00 % |
| 1882 | P0254 | Recontruction Of Road Ex. Japan, Dili Timor Leste ( Part II ) Baclelo - Kasnafar ( Sta. 13+000 - 17+000 ) Municipality Dili | 100.00 % |
| 1883 | P0253 | Dili Roads and Drainage Rehabilitation Road Section : Jct. Culuhun - Jct Halilaran and Audian - Bemori - St. Cruz Municipality Dili | 100.00 % |
| 1884 | P0252 | Urgent Maloa River Protection Location : Maloa River Length 1.14 Km, Dili Municipality | 100.00 % |
| 1885 | P0251 | Dili Road and Drainage Rehabilitation Kampung Baru, Municipio Dili, Timor Leste ( 2.355 km ) | 100.00 % |
| 1886 | P0250 | Rehabilitation of Manleuana Rai Hun Road Drainage Construction and Manleuana Meti Mutu River Protection Municipality Dili | 100.00 % |
| 1887 | P0249 | Laulara Solerema Roads | 100.00 % |
| 1888 | P0248 | Roads and Drainage Rehabilitation Project Delta III Municipality Dili | 100.00 % |
| 1889 | P0247 | Road Rehabilitation Project, Road Section: Aldeia 30 de Augusto, Comoro Municipality of Dili | 100.00 % |
| 1890 | P0246 | Rehabilitation of Road Section Dare Junction to Aldeia Lalaus Length 1.05 km Municipality Dili | 100.00 % |
| 1891 | P0245 | Hera Mota kiik | 100.00 % |
| 1892 | P0244 | New Construction of Median Line Leader to Elemloi JNC | 100.00 % |
| 1893 | P0243 | Construction of Roads Fatuahi to Darlau ( Sta. 0+000 - 1+000 ) in Municipality of Dili | 100.00 % |
| 1894 | P0242 | Rehabilitation of Roads Becora Mota Ulun - Karau Maten Municipality of Dili | 100.00 % |
| 1895 | P0241 | Construction of Cyclopean Concrete Retaining Wall in Taibesi River Municipality Dili | 100.00 % |
| 1896 | P0240 | Rehabilitasaun estrada becora mota ulun (0+000-1+215) | 100.00 % |
| 1897 | P0239 | Emergency Project in 2016 Flood Control Project Bedois River, Dili District ( 1,030 km ) | 99.62 % |
| 1898 | P0238 | Rental equipment clean up river | 100.00 % |
| 1899 | P0237 | Dili road and Drainage rehabilitation terminal becora mota ulun | 100.00 % |
| 1900 | P0236 | Dili Road and Rehabilitation Bairro Pite (0+000-1+082) | 100.00 % |
| 1901 | P0235 | New Construction of Sukaer Oan River cyclop Concrete Retaining Wall and Gabion Work Manufahi Municipality | 100.00 % |
| 1902 | P0234 | Emergency New Construction of Gabion Box Protection With Random Fill, Baria Laran, Uma Berloik, Alas Sub District, Manufahi District | 100.00 % |
| 1903 | P0233 | Rehabiliation Estrada urbanas Covalima III (0+00-9+541) | 100.00 % |
| 1904 | P0232 | Rehabiliation Estrada urbanas Covalima II (0+00-7+575) CH-03 -CH-07 | 100.00 % |
| 1905 | P0231 | Rehabiliation Estrada urbanas Covalima I (0+00-7+750) CH-01 -CH-02 | 100.00 % |
| 1906 | P0230 | Construction Open New Road Belulic Leten to Belulic Craic for Patroling the Border Sta. 0+000 - Sta. 9+160 | 100.00 % |
| 1907 | P0229 | Rehabilitation of Roads and Slope Protection Road Section: Be'e Mean Zumalai National Road (250 M) | 96.33 % |
| 1908 | P0228 | Rehabilitation estrada jct Tilomar - jct Fatumea (0+000-4+775) | 100.00 % |
| 1909 | P0227 | Reh. Of Road from Haemanu Bridge Jct Zumalai sta. 15+180-20+316 | 100.00 % |
| 1910 | P0226 | Rehabilitation of Road From Haemanu Bridge Zumalai Junction ( 0+000 - 20+316) Phase III Sta. 10+140 - 15+180 Municipality Covalima | 100.00 % |
| 1911 | P0225 | Rehabilitation of Road From Haemano Bridge to Zumalai Jct. Phase II 5+020 - 10+140 Municipality Covalima | 100.00 % |
| 1912 | P0224 | Rehabilitasaun Estrada Jct Triloka -jct Fatumaca-jct Venilale Ch.6+025-12+075 | 92.50 % |
| 1913 | P0223 | Rehabilitasaun Estrada Jct Triloka -jct Fatumaca-jct Venilale Ch.0+000-6+025 | 100.00 % |
| 1914 | P0222 | Open New Road Turiscai - Mota Belihun Maubere, Turiscai - Liquidoe Stage 1 ( Sta. 0+000 - 7+050 ) Municipality Manufahi | 100.00 % |
| 1915 | P0221 | Emergency Rehabilitation Project in Subao Boot, Municipio Manatuto | 100.00 % |
| 1916 | P0220 | Rehabilitation of Road and Drainage Slope Protection Municipality of Lautem | 100.00 % |
| 1917 | P0219 | Rehabilitation Marobo - Hatolia Road Package 2 ( 05+200-10+000 km ) in Ermera District | 68.33 % |
| 1918 | P0218 | Comoro Power Plant CCTV | 92.00 % |
| 1919 | P0217 | Protection Stone Masonry of Meti-aut River, Area in Bidau, Municipality of Dili | 100.00 % |
| 1920 | P0216 | Dili Roads and Drainage Reh. Rotunda Mercado Lama-Ponte Comoro (Variation Order) | 55.23 % |
| 1921 | P0215 | Additional Drainage Colmera | 100.00 % |
| 1922 | P0214 | Rehabilitation Jct Area Branca-Hera | 100.00 % |
| 1923 | P0213 | Construction of Jct. Dare-Manumetan Raihun road Sta. 0+000-6+360 | 100.00 % |
| 1924 | P0212 | Upgrading of Cassa-Zumalai Roads Jct. Zumalai-Harekain Road (Km 00+000-Km 04+000), Municipality of Covalima | 77.35 % |
| 1925 | P0211 | Rehabilitation of Road From Haemano Bridge - Zumalai Jct. Phase I 0+000 - 5+020 Municipality Covalima | 100.00 % |
| 1926 | P0210 | Construction of Mabilgo bridge, Municipality of Maliana | 100.00 % |
| 1927 | P0209 | Cleaning andion of Airport Maliana Compac | 100.00 % |
| 1928 | P0208 | Power Plant Maliana Sub District | 89.09 % |
| 1929 | P0207 | Emergency Acces Roads in Bobonaro Municipality (Maliana to Cailaco) | 100.00 % |
| 1930 | P0206 | Rehabilitation of Road Section : Camara Municipio To Ex Kodim Maliana Roads (2.150 km) Bobonaro Municipality | 97.02 % |
| 1931 | P0205 | Emergency proposed for the new cons of bridge, Gabions & retaining wall in Area Fatuk Mutin | 83.94 % |
| 1932 | P0204 | Slope Protection ( Gabion) at Queca Mau area 14 | 100.00 % |
| 1933 | P0203 | Rehabilitation of Marobo - Hatulia Road Package I Ermera Municipality | 99.63 % |
| 1934 | P0202 | Road and Drainage Rehabilitation Project Aimutin to Manleuana Sta 0+000 - Sta 1+215 (1.22 Km) | 100.00 % |
| 1935 | P0201 | Rehabilitation of Mota Masin to Haemanu Roads Sta. 35+000-40+00 | 100.00 % |
| 1936 | P0200 | Rehabilitation of Mota Masin to Haemanu Roads Sta. 30+100-35+000 | 100.00 % |
| 1937 | P0199 | Rehabilitation of Mota Masin to Haemanu Roads Sta. 23+800-30+100 | 100.00 % |
| 1938 | P0198 | Rehabilitation of Mota Masin to Haemanu Roads Sta. 17+500-23+800 | 100.00 % |
| 1939 | P0197 | Rehabilitation of Mota Masin to Haemanu Roads Sta. 11+900-17+500 | 100.00 % |
| 1940 | P0196 | Rehabilitation of Mota Masin to Haemanu Roads Sta. 6+300-11+900 | 100.00 % |
| 1941 | P0195 | Rehabilitation of Mota Masin to Heimanu Road Sta. 0+000-6+300 Municipality of Covalima | 100.00 % |
| 1942 | P0194 | Rehabilitation of Roads 5.400 Km (0+000-5+400) Aldeia Leogore to Aldeia iha Roads Covalima Municipality | 97.84 % |
| 1943 | P0193 | Rehabilitation of Venilale - Hatulia - Uaimori Roads Package 5 Sta. 25+775-30+880 ( 30,880 km ) Municipality Viqueque | 100.00 % |
| 1944 | P0192 | Rehabilitasaun Estrada Venilale - Hatulia - Uaimori fase 20+625-25+775 | 35.62 % |
| 1945 | P0191 | Rehabilitation of Venilale - Hatulia - Uaimori Road Packege 3 ( Sta. 15+475 - 20+625 ) in Municipality of Baucau | 52.00 % |
| 1946 | P0190 | Rehabilatation of Rural Roads: Hatulia - Uamori Road Package 2 Sta. 15+475 in Baucau District | 78.17 % |
| 1947 | P0189 | Rehabilitasaun Estrada Venilale - Hatulia - Uaimori fase 0+000-10+300, Baucau Municipality | 37.90 % |
| 1948 | P0188 | Emergency new construction of gabion box protection random fill in area Laclo, Baria Laran, Uma Berloik, Alas | 89.70 % |
| 1949 | P0187 | Emergency proposed for the New construction of drain channel with pipe culvert in area Lalika, Betano, Same | 100.00 % |
| 1950 | P0186 | Normalization and Protection River of Gabion and New Concrete Bridge Section Busakukun, Municiality of Covalima | 94.11 % |
| 1951 | P0185 | Normalization River and Road Protection in Ogoes Suai Municipality - Timor Leste | 100.00 % |
| 1952 | P0184 | River normalization and protection in Fatuk Oan | 75.18 % |
| 1953 | P0183 | New construction of drainage in Suai Loro 1 (Bebusa to Suai Loro) | 100.00 % |
| 1954 | P0182 | New Water Fountain in Round Park (Dili District) | 100.00 % |
| 1955 | P0181 | Rehabilitation of Sloi Tocoluli roads Aileu | 100.00 % |
| 1956 | P0180 | Roads and Drainage Rehabilitation Auto Timor - Bebonuk | 27.77 % |
| 1957 | P0179 | Dili Roads and Drainage Rehabilitation Palacio Presidente - Financas - Tasi Ibun | 44.52 % |
| 1958 | P0178 | Dili Roads and Drainage Rehabilitation Cruzamento Aitarak Laran Mesid An'ur KBRI | 45.68 % |
| 1959 | P0177 | Dili Roads and Drainage Rehabilitation Ocean view (Arbiru Hotel) Comoro river down stream Comoro Bridge (North of Bridges) | 100.00 % |
| 1960 | P0176 | Dili Roads and Drainage Rehabilitation Comoro River Down Stream - Comoro Bridge Area Road | 100.00 % |
| 1961 | P0175 | Dili Roads and Drainage Rehabilitation Timor Block east Comoro river and intersection of futura bridge 3 west Comoro | 85.62 % |
| 1962 | P0174 | Dili Roads and Drainage Rehabilitation Road Section Hudilaran - Bairo Pite Municipality Dili | 100.00 % |
| 1963 | P0173 | Dili Roads and Drainage Rehabilitation Project Road Section: Ponte Obrigado Barak to Cathedral | 100.00 % |
| 1964 | P0172 | Dili Roads and Drainage Rehabilitation, Roads Section Bidau - ANZ- Palacio Governo | 100.00 % |
| 1965 | P0171 | Road Rehabilitation project, Sarlala - Bemos - Manleuana - Timor block link, Package 1: Sta. 2+800 - Sta. 6+300 | 100.00 % |
| 1966 | P0170 | Road Rehabilitation project, Sarlala - Bemos - Manleuana - Timor block link, Package 1: Sta. 0+000 - Sta. 2+800 | 100.00 % |
| 1967 | P0169 | Rehabilitation of Beducu Sarlala Roads (Ex. Japan) Sta. 6+300 - Sta. 8+968.45 | 100.00 % |
| 1968 | P0168 | Construction of gabion retaining wall at Ayasa River, Manufahi district | 100.00 % |
| 1969 | P0167 | Design and Construction Supervision Services Emergency Package Project for the year 2013 Municipalities of Covalima, Ainaro and Manufahi | 100.00 % |
| 1970 | P0166 | Emergency Proposed for New Construction of Bridge with Retaining Wall in area We Bikas Clacuc Administrative of Fatuberliu, Manufahi Municipality | 100.00 % |
| 1971 | P0165 | Emergency proposed for new construction of bridge, gabions box protection with retaining wall in area Beao, Fatu Besi | 100.00 % |
| 1972 | P0164 | Emergency proposed for the new constructioin of bridge box protection with retaining wall in Area Wee Kakau Oan 2 | 8.61 % |
| 1973 | P0163 | Emergency work package caused by climate change on June 2013 (Gabion protection works in Lamak Laran) Municipio Viqueque | 100.00 % |
| 1974 | P0162 | Emergency Construction of New Road From Ainaro Vila to Sarai Municipality Ainaro | 100.00 % |
| 1975 | P0161 | Rehabilitation of Laleno Road Project Road Section (Sta. 0+000 - 6+210) Maina 2 in Lautem | 100.00 % |
| 1976 | P0160 | Rehabilitation Of JCB.Balibo -Cowa Postu UPF Hasnaruk Road (Sta.10+000-19+250) Bridge Section:JCT.Katimun Ren-Aisukar (Sta.16+950) | 11.30 % |
| 1977 | P0159 | Rehabilitation of Roads Monumento - Laclubar, Mercado Hua-Lu, Manatuto Municipality | 100.00 % |
| 1978 | P0158 | Nova Construção de Moro Protecção da Ribeira de Dilor (Pakote1-Sta. 0+000 To 0+800) | 100.00 % |
| 1979 | P0157 | Rehabilitation Of Roads Uaiaca - Queleqai - Lacudala Sta. 5+400 to 10+800 (5.40 Km) Municipality of Baucau | 100.00 % |
| 1980 | P0156 | Manutensaun estradas Munisipiu Buihomau-Luro-Lautem, ( Buihomau - Luro - Lautem 20 Km) / Roads Maintenance section Buihomau-Luro (C4) | 100.00 % |
| 1981 | P0155 | Rehabilitation of Miabuti Edmumo, Sapatula Road /reabilitacao de estradas distritais de Uatulari Viqueque District | 41.68 % |
| 1982 | P0154 | Emergency Road Rehabilitation Package II from Ossu - Viqueque District | 100.00 % |
| 1983 | P0153 | Rehabilitation of Ermera- Hatolia Roads | 86.82 % |
| 1984 | P0152 | Road Rehabilitation Jct A09 Fatucamanaun Leohat 1, (sta. 0+000 Km - 4+200) Package 1 Municipality of Manatuto | 100.00 % |
| 1985 | P0151 | Manutensaun Protesaun Intake no Kanais Irrigasaun Iha Atabae/Loes | 100.00 % |
| 1986 | P0150 | Financial Advisory Services Agreement between Government of Timor-Leste and International Finance Corporation on Health Diagnostic Services PPP Project | 100.00 % |
| 1987 | P0149 | Consulting Services for Detailed Architecture and Engineering Design for Press Building Project | 40.00 % |
| 1988 | P0148 | Detail Engineering design (DED) of The New Ministry of Commerce, Industry and Environment | 40.00 % |
| 1989 | P0146 | Consulting Services for Detail Engineering Design of the IGE Office, Workshop and Warehouse Complex Building | 100.00 % |
| 1990 | P0145 | Detailed Engineering Design (DED) and Construction Supervision Services for the Three (3) projects: the New Building for the Municipio de Manatuto, New Building for the Assembleia Municipal de Manatuto and Rehabilitation of Saututo Residence | 100.00 % |
| 1991 | P0144 | Financial Advisory Services Agreement between the Government of Timor - Leste and International Finance Corporation on Development of Presidente Nicolau Lobato Internasional Airport - Airport PPP Project | 54.55 % |
| 1992 | P0143 | Maintenance, Repair & New Electrical Installation at Ministerio Do Plano E Ordenamento | 92.28 % |
| 1993 | P0142 | Construction Supervision for the Upgrading of Existing Suai Airport | 100.00 % |
| 1994 | P0141 | Upgrading of Existing Suai Airport, Suai, Timor Leste | 100.00 % |
| 1995 | P0139 | Construction of 12 de Novembro Monument | 4.15 % |
| 1996 | P0137 | New Construction of Militar base and accommodation building | 93.18 % |
| 1997 | P0136 | Preparation of Detailed Engineering Design for Rehabilitation of Municipio Roads Package 7 : Seloi - Aileu to Gleno - Ermera (162) | 100.00 % |
| 1998 | P0135 | Construcão Posto Militar FFDTL Pante Makasar | 100.00 % |
| 1999 | P0134 | New Installation Water, Water Tank and Deep Well at Bairos PNTL - Manufahi District | 99.18 % |
| 2000 | P0133 | New Water Supply of Bairos PNTL Liquica | 86.27 % |
| 2001 | P0132 | Konstrusaun kanalizasaun bee mos iha selihasan suco Betano, Posto Adm Same, Municipio Manufahi /162 | 18.50 % |
| 2002 | P0131 | Novo Construcão Bairo da Policia Municipio de Aileu | 94.48 % |
| 2003 | P0130 | Consultant Services Construction Supervision and Quality Control of New Construction of Quartel Geral PNTL Office Building in Caicoli Dili Timor Leste | 10.00 % |
| 2004 | P0129 | Construção Quartel General PNTL em Caicoli | 1.78 % |
| 2005 | P0128 | Construção da Quarter PNTL Municipio Lautem | 100.00 % |
| 2006 | P0127 | Consulting Services for Detail Engineering Design (DED) for Pediatric and ICCU Building in Guido Valadares National Hospital | 100.00 % |
| 2007 | P0126 | Extension of MRI Room at Hospital Nacional Guido Valadares, Bidau Lecidere, Municipality of Dili | 87.03 % |
| 2008 | P0125 | New Construction of ICCU at Hospital Nacional Guido Valadares, Dili Municipality | 86.52 % |
| 2009 | P0124 | Construction of Baucau Referal Hospital | 85.70 % |
| 2010 | P0123 | Supply and Installation of National Connectivity Project VI | 92.35 % |
| 2011 | P0122 | Upgrade of Satellite Bandwidth from 100 to 200 Mpbs | 97.02 % |
| 2012 | P0121 | Supply, Installation, Configuration and Comissioning of Hardware and Software for the Expantion of Data Center Infrastructure | Office of Prime Minister | 88.70 % |
| 2013 | P0120 | Supply, Installation, Configuration and Comissioning of National Optical Fiber Backbone Network | 94.59 % |
| 2014 | P0119 | New Installation MV, LV Line and House Connection from Kaitarahei to Tokoluli, and Gleno-Ermera Municipality | 100.00 % |
| 2015 | P0118 | New Installation of MV, LV Line and House Connection from Hera Ailok Laran to Sokaer Laran - Dili Municipality | 96.27 % |
| 2016 | P0117 | New Installation MV, LV Line and House Connection from Wanira to Wairoke, Ulukisi, Ailembere, and Liarafa, Luro - Lautem Municipality | 76.12 % |
| 2017 | P0116 | New Installation MV, LV Line and House Connection from Fleixa to Nunumoge, Tatiri and Mulo - Ainaro Municipality | 100.00 % |
| 2018 | P0115 | New Installation MV, LV Line and House Connection from Manutasi to Cailoko and Hatobuilico - Ainaro Municipality | 88.36 % |
| 2019 | P0114 | New Installation Mv, Lv Line & House Connection From Laclubar Vila to Funar And Fatuk Manu - Manatuto Municipality | 91.52 % |
| 2020 | P0113 | New Installation MV, LV Line and House Connection From Rotunda Nicolau Lobato to Terminal Tasi Tolu-Dili Municipality | 94.87 % |
| 2021 | P0112 | New Installation MV, LV Line and House Connection from Nunomoge to Dare, Mausiga, Hatukeru, Goulora, Loetelu 1 and Loutelu 2- Ainaro Municipality | 85.43 % |
| 2022 | P0111 | Installation MV, LV Line and House Connection from Atabae to Rairobo, Faturase and Limanro - Bobonaro Municipality | 87.94 % |
| 2023 | P0110 | New Installation MV, LV Line and House Connection from Lebumeo to Fatubesi, Bete Nafa and Barugara- Ermera Municipality | 100.00 % |
| 2024 | P0109 | New Installation MV, LV Line and House Connection from Suco Edi, Maulau, Tiltuku and Maubisse Vila - Ainaro Municipality | 48.72 % |
| 2025 | P0108 | New Installation MV, LV Line and House Connection from Mertuto to Mambrata, Samatrae, Nilbroen, Manukokorek and Leimea Kalimate - Ermera Municipality | 94.84 % |
| 2026 | P0107 | New Installation MV, LV Line and House Connection from Buava to Defawasi - Baucau Municipality | 100.00 % |
| 2027 | P0106 | New Installation Mv, Lv Line & House Connection From Fleixa to Lisuhati, Lihuntutu & Daurlala - Ainaro Municipality | 100.00 % |
| 2028 | P0105 | New Installation Mv, Lv Line & House Connection From Manatuto Vila to Suco Aitias - Manatuto Municipality | 100.00 % |
| 2029 | P0104 | New Installation MV, LV Line and House Connection From Laclubar Vila to Suco Funar Barique - Manatuto Municipality | 100.00 % |
| 2030 | P0103 | New Installation, MV, LV Line and House Connection from Darabata Bere, Lelalai, Waliliko, Daramutu to Waibobo and Boronaha, Laisorulai - Baucau | 100.00 % |
| 2031 | P0102 | New Installation MV, LV Line and House Connection From Alto Lebos to Taroman, Orema and Hohopu - Bobonaro Municipality | 94.25 % |
| 2032 | P0101 | New Installation of MV, LV Line and House Connection from Ainaro Vila to Mau Ulo 1, Mau Ulo 2, and Maumali - Ainaro Municipality | 97.63 % |
| 2033 | P0100 | New Installation Mv, Lv Line & House Connection From Bulo to Lepo and Hohopu, Zumalai - Covalima Municipality | 96.00 % |
| 2034 | P0099 | New Installation MV, LV LIne and House Connection From Loetela 1 to Loetela 2 - Liquica Municipality | 95.29 % |
| 2035 | P0098 | New Installation Mv, Lv Line & House Connection From Caibada Makasae to Lutumumu, Kaibada Waimua, Knua Waimataoli, Kaiwa'a and Haucati - Baucau Municipality | 95.35 % |
| 2036 | P0097 | New Installation of MV, LV Line and House Connection from Aituto Flexa to Erelesu, and Libtutu - Ainaro Municipality | 100.00 % |
| 2037 | P0096 | New Installation MV, LV Line and House Connection from Ailebere to Pujiara, Arafalun and Ledo Ira, Illiomar - Lautem Municipality | 100.00 % |
| 2038 | P0095 | New Installation MV, LV Line and House Connection from Laisorulai Nara Aba to Liuraga and Batikasa - Baucau Munipality | 100.00 % |
| 2039 | P0094 | New Installation MV, LV Line and House Connection from Lakawa to Ouroma, Uniraba, Borugai, and Kota Mutu, Loro - Lautem Municipality | 100.00 % |
| 2040 | P0093 | New Installation of MV, LV Line and House Connection from Iliomar to Mauma'a and Mota Liuhulu - Lautem Municipality | 100.00 % |
| 2041 | P0092 | New Installation MV, LV Line and House Connection from Aldeia Moris Badame Tuana Laran, Maloa, Ex CNRT Balide, Ex Matadoro, Manimeta Rai Hun and Bairo Pite - Dili Municipality | 100.00 % |
| 2042 | P0091 | New Installation MV, LV Line and House Connection from Letefoho to Cailiti, Rotuto, Kulau Haburas and Hathur Arbouthou - Ermera Municipality | 100.00 % |
| 2043 | P0090 | New Installation MV, LV Line and House Connection from Loubulala to Mantipu, Baboelau, Samtukulau and Hut Lau - Ainaro Municipality | 87.24 % |
| 2044 | P0089 | New Installation of MV, LV Line and House Connection from Suco Sadahur to Posto Administrativo Tilomar - Covalima Municipality | 100.00 % |
| 2045 | P0088 | New Installation of MV, LV Line and House Connection from Fatuhada to Behoris, Arbiru Beach, Comoro Market, and Bebonuk - Dili Municipality | 50.48 % |
| 2046 | P0087 | New Installation of MV, LV Line and House Connection from Suco Edi to Dimtete, Hahimu - Ainaro Municipality | 100.00 % |
| 2047 | P0086 | New Installation Mv, Lv Line & House Connection From Lefara to Hae Oli, Uani Uma and Ringgit Baru - Viqueque Municipality | 95.40 % |
| 2048 | P0085 | New Installation MV, LV Line and House Connection from Bairo Pite to Aldeia ba Dame - Dili Municipality | 90.00 % |
| 2049 | P0084 | New Installation of MV, LV Line and House Connection from Biterlaun Fatu Ahi to Lenuk Hun Cristo Rei - Dili Municipality | 96.27 % |
| 2050 | P0083 | New Installation MV, LV Line and House Connection from Hatulia to Bilimau, Tata and Titir Mata - Ermera Municipality | 100.00 % |
| 2051 | P0082 | New Installation MV, LV Line and House Connection from Dara Oma to Abu Uaemetalae, Quelicai - Baucau Municipality | 100.00 % |
| 2052 | P0081 | New Installation MV, LV Line and House Connection from Uaihacu to Tugu SP3 - Baucau Municipality | 100.00 % |
| 2053 | P0080 | New Installation MV, LV Line and House Connection from Diribu to Liasidi, Nunumalau, Iralere and Ulusu, Uatulari - Viqueque Municipality | 78.00 % |
| 2054 | P0079 | New Installation MV, LV Line and House Connection from Hohoraikik to Grotu, Baldasi, Uma Lelosae, Bifael, Bukfu, Erlihun, Raibutin and Lebutu- Ainaro Municipality | 100.00 % |
| 2055 | P0078 | New Installation MV, LV Line and House Connection from Ossu to Larigutu, Builale, Watu Buasu and Bete Cai Ana- Viqueque Municipality | 100.00 % |
| 2056 | P0077 | New Installation MV, LV Line and House Connection from Tatekar to Kledik, Kirantetuk, Fukiran and Fatuberliu-Manufahi Municipality | 90.00 % |
| 2057 | P0076 | New Installation MV, LV Line and House Connection from Bulo to Zulo - Covalima Municipality | 82.01 % |
| 2058 | P0075 | New Installation Mv, Lv Line & House Connection From Holarua to Datina, Carbulau, Erluli, Luak, Ailok Laran Turon - Manufahi district | 92.00 % |
| 2059 | P0074 | New Installation MV, LV Line and House Connection from Suai Vila to Suai Debos Office District, Tabaklot, Matai, Kiar Laran, Audian, Aldeia Halihun, MDGS, Matai, MDGS Halihun - Covalima Municipality | 67.20 % |
| 2060 | P0073 | New Installation MV, LV Line and House Connection at Feeder 1 Comoro Kampung Baru - Dili Municipality | 46.03 % |
| 2061 | P0072 | New Installation, MV, LV Line and House Connection from Mota Irabere to Mauma'a, Floresta Dirimu, Uatocarabau - Viqueque Municipality | 95.79 % |
| 2062 | P0071 | New Installation of MV, LV Line and House Connection from Balide to Delta 3, Fomento, Manleuana, Bualaran, Aldeia Moris Dame, Eskola Fatumeta, Cacaulido, Ailok Laran, Bua Laran and Lisbutak - Dili Municipality | 86.00 % |
| 2063 | P0070 | New Installation Mv, Lv Line & House Connection From Quelicai to Daralata, Saraida, Lialura and Aedu Kele - Baucau Municipality | 100.00 % |
| 2064 | P0069 | New Installation of MV, LV Line and House Connection from Tugu Betano to Otorita, Trans Pemuda, Tani and Sesurai - Manufahi Municipality | 100.00 % |
| 2065 | P0068 | New Installation of MV, LV Line and House Connection from FeederII Becora to Taibesi, Bemori and Balide - Dili Municipality | 91.75 % |
| 2066 | P0067 | New Installation of MV, LV line and House Connection from Timor Block to Vila Verde, Ponte Comoro and Fomento - Dili District | 55.21 % |
| 2067 | P0066 | New Installation of MV, LV Line and House Connection fromLiquica Vila to Loidahar, Maudemo, Hekar Loidahar, Hatuleho, Koni Leopa, Aipelo, Maumeta, and Leopa - Liquica Municipality | 93.00 % |
| 2068 | P0065 | New Installation MV, LV Line and House Connection from Kulau to Maubara - Liquica Municipality | 85.11 % |
| 2069 | P0064 | New Installation MV, LV Line and House Connection from Mertutu to Mambata, Kailmate, Haturegas and Nilbroen - Ermera Municipality | 100.00 % |
| 2070 | P0063 | New Installation MV, LV Line and House Connection from Hohopu to Orema - Ermera Municipality | 100.00 % |
| 2071 | P0062 | New Installation MV, LV Line and House Connection from Suco Mascarenhas (Aldeia 05, Alto Balide) to Suco Vilaverde (Aldeia Um de Setembro, Mate Moris and Terus Nain)-Dili Municipality | 100.00 % |
| 2072 | P0061 | New Installation MV, LV Line and House Connection from Laclo to Mantane - Manatuto Municipality | 95.99 % |
| 2073 | P0060 | New Installation MV, LV Line and House Connection from Lisadila to Bantul, Gicu, Siamadu, MDG, Trans Faularan, Simodo, Melabui, Lebuai, Manukabea and Leolatai- Liquiça Municipality | 100.00 % |
| 2074 | P0059 | New Installation MV, LV Line and House Connection from Bidau to Catedral - Dili Municipality | 81.95 % |
| 2075 | P0058 | New Installation of MV, LV Line and House Connection from Vemasse to Cairabela and Waigoa - Baucau District | 100.00 % |
| 2076 | P0057 | New Installation MV Line, Transformer and LV Line New Distribution Line Sucu Katrai-Kraik Sucu Haupu District Ermera | 100.00 % |
| 2077 | P0056 | Installation New Transformer & LV Line New Distribution Line Suco katrai Kraik District Ermera | 92.84 % |
| 2078 | P0055 | New Installation of MV, LV Line and House Connection from Sibuni to Molop, Walgomo, Mauwi, Omelai, and Anapal Bobonaro District | 100.00 % |
| 2079 | P0054 | Emergency Maintenance of 20Kv MV Line at Oeleo to Tapo Bobonaro Subdistrict - Bobonaro District | 100.00 % |
| 2080 | P0053 | New installatio of mv line in Paiola to raikoak and Mota Ulun Dili District | 100.00 % |
| 2081 | P0052 | New Installation Street Light at Cristo Rei - Dili District | 100.00 % |
| 2082 | P0051 | New Installation MV,Line Transformer and LV Line from Dotik to Alas Manufahi District | 87.30 % |
| 2083 | P0050 | Aumenta C. O no Kliesntes | 100.00 % |
| 2084 | P0049 | Installation New MV Line,transformer & Extend LV Line & distribution Line from Lebukuku to Besilau and Fatuk Hun - Aileu District | 81.53 % |
| 2085 | P0048 | New Installation MV,LV Line and House Connection for Bazartete Vila to Leorema -Bazartete Sub District-Liquica District | 100.00 % |
| 2086 | P0047 | New Installation of Under Ground Cable MV Line From Malelat To Pasabe- Oecusse Municipality | 100.00 % |
| 2087 | P0046 | Installation New MV Line , Transformer & Extend LV Line and New Distribution Line from Nitib Tuan Oel Tam to nitib Tuan Oecusse District | 98.44 % |
| 2088 | P0045 | New Installation of MV, LV Line, and House Connection from Urbo to Ailelo - Ermera District | 99.24 % |
| 2089 | P0044 | New Installation of MV, LV Line, and House Connection from Cailaco to Biadila, Daulelo, Harema, Airae, Aiteka Laran, Santa Cruz, Samutaben, and Maliubun - Bobonaro District | 98.72 % |
| 2090 | P0043 | New Installation Of Under Ground Cable MV Line In Sakato Power Plant, Ambeno - Oecusse Municipality | 0.00 % |
| 2091 | P0042 | Instala Trafo 100 KVA | 100.00 % |
| 2092 | P0041 | New installation of mv,lv line and house connection in Area Lawai Viqueque District | 63.38 % |
| 2093 | P0040 | Mudansa Lina Bazeia Rekomendasaun ADN | 96.66 % |
| 2094 | P0039 | Rehabilitation MV,Line , LV Line and distribution Trasformer from Casa Europa to Pantai Pasir Putih - Dili District | 100.00 % |
| 2095 | P0038 | Desmonthly Linha Distribusaun Tuan | 100.00 % |
| 2096 | P0037 | Mudansa Konstrusaun Linha Distribusaun Relasiona kondisaun Geografika | 100.00 % |
| 2097 | P0036 | Addt. Poste liga Maubara | 0.00 % |
| 2098 | P0035 | Installation of New MV Line in Rotunda Mercado Lama, Culuhun, Ailele Hun, and Lecidere | 61.92 % |
| 2099 | P0034 | New installatio of feeder 2 MV and LV line in Casa, Betano - Manufahi District | 100.00 % |
| 2100 | P0033 | The Undergrading of existing Suai Airport at Covalima Municipality | 100.00 % |
| 2101 | P0032 | Extende Linha ba Klientes | 100.00 % |
| 2102 | P0031 | New Installation MV,LV Line and House Connection from Malabe to Mota Taidasi,Atara mania and Atara Ermera District | 100.00 % |
| 2103 | P0030 | New MV Line ,Install New transformer & Extend LV line & New distribution Line from Simpang Tiga Lequidoe Tursai Aileu District | 100.00 % |
| 2104 | P0029 | New Installation of MV, LV Line, and House Connection for Catrai Leten to Lauana, Letefoho Sub District - Ermera District | 100.00 % |
| 2105 | P0028 | Delivery Equipment and installation Services for Electrical Installation that cover up LV line in-house installation and metering for Public School and Health Center Building that will be conducted in Bobonaro District | 75.23 % |
| 2106 | P0027 | New Install New Transformer & Extend LV Line & New distribution Line from Madabeno to Sarlala Aileu District | 100.00 % |
| 2107 | P0026 | Instalasaun Media tensaun husi Dokubere to'o Ponte Seical | 100.00 % |
| 2108 | P0025 | Construção de Nova Escola Polo de Baucau, de Referência da Escola Portuguesa de Díli | 92.82 % |
| 2109 | P0024 | Consulting Services for Construction Supervision of Tribunal Distrital Dili Office Building | 75.70 % |
| 2110 | P0023 | Construction Of New Office Of Tribunal Distrital De Dili | 33.98 % |
| 2111 | P0022 | Detalied Engineering Design (DED) For The New OJETIL Office Dili | 100.00 % |
| 2112 | P0021 | New Construction of Ojetil Office Building Dili District | 100.00 % |
| 2113 | P0020 | Consulting Services for detailed Engineering Design of CAC Office Building | 73.00 % |
| 2114 | P0019 | Plano Lidar e Mapeamento a todo o territorio, segunda fase | 73.25 % |
| 2115 | P0018 | Estudos e plano de Concepção para Planeamento Urbano a Nivel nacional | 70.00 % |
| 2116 | P0017 | For River Normalization, Roads Embankment and Road Clean Up of Comoro Mota Ulun - Casnafar, Air Terjun Sarlala Emergency Project | 100.00 % |
| 2117 | P0016 | Rehabilitasaun Sistema Be'e Mos Iha lahane Dili Municipality | 73.26 % |
| 2118 | P0015 | Rehabilitasaun kanu transmisaun husi Benamauk ba WTP Lahane no Becusse | 18.75 % |
| 2119 | P0014 | Emergency project for Rehabilitasaun intake transmission of water pipeline and sanitation at La Koto & Mutu Dare-Nahaek | 60.66 % |
| 2120 | P0013 | Melhoramento sistema bee mos iha Maloa Dili Municipality | 94.10 % |
| 2121 | P0012 | Konstrusaun Lutu Hadulas, Uma panel, Inst transformador no kanu transmisaun iha tuana laran | 83.31 % |
| 2122 | P0011 | Consulting services for Detailed Engineering Design of Timor-Leste Four Municipal Capitals (Baucau-Lospalos-Viqueque-Same) Water Supply & Sanitation Project | 99.55 % |
| 2123 | P0010 | Pre- Feasibility Study of a Ground Water Resources Development Project for the Water Supply of Dili Metropolitan Area | 100.00 % |
| 2124 | P0009 | Feasibility Study of Surface Water Resource Development for the Water Supply of Dili Metropolitan Area | 50.00 % |
| 2125 | P0008 | Drilling and Installation of water pump and construction of 100m3 of the Reservoir at Hospital National Guido Valadares (HNGV) | 97.76 % |
| 2126 | P0007 | Consulting Services for Dili Water Supply Public Private Partnership Feasibility Study | 100.00 % |
| 2127 | P0006 | Detailed Engineering Design (DED) of Dili Sanitation and Drainage Master Plan-Phase II | 99.31 % |
| 2128 | P0005 | Detailed Engineering Design (DED) of Dili Urban Water Supply | 65.18 % |
| 2129 | P0004 | Detailed Engineering Design of New Fisherman Port, Suco Duyung, Metinaro | 70.00 % |
| 2130 | P0003 | Consulting Services For Construction Supervision of Dardau Irrigation Scheme | 82.46 % |
| 2131 | P0002 | Construction of Dardau Irrigation Scheme Municipality Viqueque | 100.00 % |
| 2132 | P0001 | Laleia River Protection (STA 00+191-00+750) | 100.00 % |